欢迎来到淘文阁 - 分享文档赚钱的网站! | 帮助中心 好文档才是您的得力助手!
淘文阁 - 分享文档赚钱的网站
全部分类
  • 研究报告>
  • 管理文献>
  • 标准材料>
  • 技术资料>
  • 教育专区>
  • 应用文书>
  • 生活休闲>
  • 考试试题>
  • pptx模板>
  • 工商注册>
  • 期刊短文>
  • 图片设计>
  • ImageVerifierCode 换一换

    Updates-on-RTCA-DO-160-Lightning-Test.pdf

    • 资源ID:21158059       资源大小:607.27KB        全文页数:21页
    • 资源格式: PDF        下载积分:30金币
    快捷下载 游客一键下载
    会员登录下载
    微信登录下载
    三方登录下载: 微信开放平台登录   QQ登录  
    二维码
    微信扫一扫登录
    下载资源需要30金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝    微信支付   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    Updates-on-RTCA-DO-160-Lightning-Test.pdf

    1The world leader in serving scienceRTCA DO-160F Lightning TestingOverview, updates, changes and whats coming next!Michael Hopkins2RTCA DO 160? RTCA is the Radio Technical Commission for Aeronautics Publishes DO 160 Latest is DO 160F, issued in December 2007 and now available for downloading Section 22 is “Lightning Induced Transient Susceptibility” Serves the Aerospace, Automobile, Commercial Vehicle and Motorsport industries AE-2 is responsible for Section 22 of RTCA DO 160 Also responsible for Section 23 “Lightning Direct Effects? Fuel ignition and physical damage And P-Static buildup of charge on an airframe and its effects23Driving forces to requirements? Revisions E and F of DO 160 are driven by the use of composite materials used for airframe construction. Boeing 787 Dreamliner Airbus A380 Embraer Bombardier And others.? Many composites dont conduct lightning currents the way metal airframes do; hence, the possibility of higher voltages and currents getting into cables and equipment on the aircraft.4Mil Std 461? It was the intention that parts or all of DO-160 Section 22 would be included in Mil Std 461F; however, due to disagreements between the Navy and Air Force regarding pin injection testing, it didnt happen? SAE and RTCA were told in early 2007 that it would be 5 years before Rev G could be considered.? In May, the story changed and it was reported that not only havethe Navy and Air Force come to some agreement regarding pin injection testing, a revision of 461 to include DO-160 testing would be possible by the end of 2008!vs.35Mil Std 461? In January 2008, it was sadly announced that due to the necessity of doing a 5 year review on Mil 464, the changes to Mil 461 would have to wait.? The latest word is that the review of Mil 464 will take 2 years and that the revision of 461 could begin by the Spring of 2010.6Section 22 Basics? There are 5 Test Levels and 6 Waveforms Single stroke, multi-stroke, and multi-burst applications? 2 primary methods of testing Pin Injection Direct Inductive coupling Ground Injection Cable Bundle Inductive coupling Ground Injection47Test Levels? Level 1 Equipment and wiring are installed in a well protected environment? Level 2 Equipment and wiring are in a partially protected environment? Level 3 Equipment and wiring are in a moderately protected environment? Level 4 and 5 Equipment and wiring are in severe electromagnetic environments8Waveforms? Waveform 1 - Current Double exponential 6.4us X 69us (to 50%)? Waveform 2 Voltage Double exponential 100ns X 6.4us (at zero crossing)? Waveform 3 Voltage/Current Ringing wave, sine or cosine 1MHz and 10MHz? Waveform 4 Voltage Double Exponential 6.4us x 69us (to 50%) Same shape as Waveform 1 except this ones voltage? Waveform 5A Voltage/Current Double Exponential 40us X 120us (to 50%)? Waveform 5B Voltage/Current Double Exponential 50us X 500us (to 50%)59Waveform Application? Multiple Stroke(Multi-Stroke)? Multiple Burst(Multi-Burst)10Safety issues? The waveforms used for lightning testing in DO-160 Section 22 contain considerable energy enough to be lethal under the right conditions.? It is imperative that labs doing this kind of testing take all the necessary measures to insure safety procedures are observed. Grounding Electrical codes Floating Scopes ? - NEVER! Exposed components and circuits ever see a capacitor explode ? Restricted access to the test area is it ? One hand in your pocket ?611Available Testers? Prior to this year, there was only one commercially available test system for Section 22 of DO-160.? As a result, there is a lot of home-brew equipment in use today similar to the telecom industry in the early 80s. Much of the equipment in use today may have some of the same problems the telecom industry had before moving towards commercially available testers.12Available Testers? Before the telecom industry moved toward commercial testers for lightning, they were experiencing a range of problems, including: Exposed components Difficult to maintain Time consuming to use due to set-up requirements Requires engineers to run the tests Availability of high energy components in small quantities limited Ceramic power resistors, large storage caps, large inductors, magnetics Lack of correlation between testers Sometimes standards written loosely to accommodate construction problems SAFETY - Biggest issue713Changes from DO-160E to DO-160FThere were a number of changes made to Section 22 of Rev F, both technical and editorial.Ill highlight some of the main points in the following slides.1422.1 Purpose?Two clarifications added to the Purpose (22.1) Rev E: stated the procedures “apply idealized waveforms to verify the capability of equipment to withstand the effects of lightning induced electrical transients.” Rev F: modified to say the procedures are, “provided to verify the capability of equipment to withstand a selection of transients defined in this section which are intended to represent the effects of lightning.”The Note at the end of 22.1 was in italics for emphasis, but the italics have been removed, and references to different tests being performed was removed.The intent of the change is to make it clear Section 22 testing doesnt necessarily guarantee it will survive in the aircraft -81522.2 Definitions? Local Ground Limited what can be considered “local” ground to equipment connected via a ground strap of less than 1 meter. Rev E only specified that the equipment be bonded or connected to the same part of the airframe structure.? Added a definition for “Transfer Impedance” as the ratio of core wire open-circuit voltage to the shield current. Z = Voc/IAccording to 22.5.2 section c., for cable bundle testing, if the bundle contains shielded cables and those shields cannot be disconnected for testing (they are needed for correct operation), then you must determine the “transfer impedance” so that one can decide what levels to test at and what waveforms to use V or I. Transfer impedance was never defined in Rev E.1622.3 Categories? B3G43 (An example) B = Pin test Waveform Set using Waveform B (must be A or B) 3 = Pin test Level 3 could be 1 through 5 G = Cable Bundle Test using Waveform Set G (must be C thru K) 4 = Level 4 for Cable Bundle tests, which requires both single stroke and multiple stroke tests could be 1 through 5 and need not be the same as for pin injection tests 3 = Level 3 for Cable Bundle tests using multi-burst (could be other levels)? A sentence was added to make it clear that the Pin test waveforms and level need not be the same, as indicate in the above example.91722.3 Categories? Table 22-1 listing Test Requirements has been split In Rev E, there is one table Covers both Pin Injection and Cable Bundle Testing In Rev F, the table is split into Table 22-1.1 for Pin Injection Test Requirements Table 22-1.2 for Cable Bundle Test Requirements? This is more consistent with Table 22-2, Test Levels, is already split in a similar way.18Table 22-1.1 and 22-1.2Aperture coupling is coupling induced through openings in a metal airframe.Resistance coupling is due to voltages developed on the surfaces of composite material airframes.A, C, E, G and J for aperture couplingB, D, F, H, and K for resistance couplingC through F for cable bundle single strokeG through K for cable bundle single, multi-stroke and multi-burstZ means other tests were conducted1019Table 22-1.2 Changes1. Waveform 4 removed from Category C and G.2. Waveform 4 replaces Waveform 5A in D and H.3. Waveform 1 not included in F and K because it would be redundant1. Waveform 3 is required which has a faster risetime2. Waveform 5A is required which has higher energy.4. Waveform 5A was listed for a voltage situation under Category D and H in Rev E, but was never defined.2022.4 General Test Requirements? a. (4) External Ground Terminal When an external ground terminal exist for connection on the EUT, it generally should be connected to the ground plane. The question was, how (or if) this ground wire is treated in the cable bundle Rev E: It should NOT be included as a parallel current path unless its routed with the cable bundle for its entire length. Rev F: Adds, “ unless this is otherwise specified in the equipment installation instructions.” Rev E: “If present at the unit under test during ground injections tests, these grounds should be tied to the EUT chassis.” Rev F: Adds, “ or the injection has to be applied at the remote end.” Bottom Line: No external ground connection should constitute a parallel path for the injected lightning current, and in the case of an external ground normally running with the cable bundle, it should be tested that way.1121External Ground TerminalIf the External ground terminal is connected to ground, there wont be any current injected on the cables.If the External ground must be connected for the test, then an alternate injection point is to be used.2222.4 General Test Requirements? a.(7) Interface Loads and Support Equipment Rev E: States that loads should simulate the actual load line-to-line and line-to-ground impedances, “ (including stray capacitance) as far as practical.” and that, “This load simulation shall take into account the actual impedance existing in the system under lightning conditions, when surge suppressors, if any, are activated.” Rev F: Removes that last sentence, and modifies the previous sentence to end with “ (including stray capacitance and non-linear devices) under lightning conditions.”? Basically, just an editorial simplification -122322.5.1 Pin Injection Tests? Paragraphs now labeled a. to i.? Added item d. “For pin injection testing, waveform 3 shall be applied at 1.0 MHz (+/-20%).”? Clarified the paragraph regarding the remote load impedance characteristics This is the impedance, “between the remote pin and airframe ground at that extremity (including the fact that the dielectric strength characteristics of the remote load can tolerate the open circuit voltage of the transient generator) are specified in the equipment installation requirements” Whats this mean: If in a normal installation an EUT is connected to remote loads or sources, the impedance of those remote loads and sources can be simulated by adding an appropriate resistance between the tester and EUT with limits: 75 ohms for Waveform 3. 24Figure 22-13 Pin Injection for Signal Pins ? Added optional remote load impedance as described in 22.5.1 for certain tests.1325Pin Injection for Power Pins Ground Injection Method26Pin Injection for Power Pins Cable Injection Method142722.5.1 Procedures Generator Calibration? d. Reference to Table 22-2 Note 4 removed. In many places in Rev F, notes that are requirements have been moved into the body of the text and not just left as “notes”. ? e. Modified to make it clear that when verifying the source impedance of the generator by using a non-inductive resistor equal to the generator source impedance that wave shape parameters and amplitude reduces to of the open-circuit set voltage not just the amplitude as in Rev E. The Note at the end of the procedure is now included in paragraph e. This note allows the use of taking the ratio between open-circuit voltage and short-circuit current as the effective source impedance of the generator: Zg = Voc/Isc. Same reasoning as for “d.” above.2822.5.1.2 Procedures Test SequenceAdded a timing requirement:“The maximum time between application of each transient shall be no greater than 1 minute”Much discussion regarding power ratings of protective devices, effects of faster testing on failure rates, etc152922.5.2 Cable Bundle TestsSection 22.5.2 has been significantly expanded to provide as much guidance as possible to the user to insure that tests are done correctly especially when a test provides unexpected results. The following few slides with go through a few of the points.3022.5.2 Cable Bundle Tests a brief overviewa)For an individual conductor, core wire current need not exceed the corresponding pin test short-circuit current straight forward reasoning.b)For multi-stroke and multi-burst, random is achieved through timing “random” is always a point of discussion.c)If ITcannot be reached cable too long, level 5, or requested by system installer, some shields can be disconnected and core wires pulsed directly. d)Cable bundle single and multi-stroke tests can be combined, but first of the multi-stroke must be at the level required for a single stroke teste)For cable bundles, waveform 3 is applied at both 1MHz and 10MHz f)Waveform 1 can be applied using either cable or ground injection methodsg)A test is always acceptable if the test level is reached before the limit level. 163122.5.2 Cable Bundle Tests a brief overview (cont)h)Voltage waveforms if correct during a test, generator performance verification isnt required. When monitoring the current:1)Waveform 2: If ILis reached and a Waveform 1 is produced, test is acceptable. If not, a Waveform 1 current test is required.2)Waveform 3: Test is acceptable if V and I wave shapes are the same and either VTor ILis reached.3)Waveform 4: If IL is reached before VT and I rise/duration are equal to or longer than V rise/duration, test is okay. Shorter duration I during verification is NOT acceptable. If generator cannot produce a compliant current, Waveform 5A must be used.4)Waveform 5A: can be defined as a voltage wave for testing cableswith shield wires lifted. The test level for Waveform 4 is used.3222.5.2 Cable Bundle Tests a brief overview (cont)i) Current waveforms Waveforms 1, 5A and 5B1) For Waveform 1, if correct during a test, generator performance verification isnt required. 1) When monitoring the voltage if VL is reached before IT and V waveform risetime is shorter and duration longer than Waveform 2 during verification, test is acceptable.2) When measuring voltage, spikes and HF noise are to be ignored When measuring voltage, spikes and HF noise are to be ignored3) If generator cannot produce a compliant V waveform during verification, then a Waveform 2 test is required.173322.5.2 Cable Bundle Tests a brief overview (cont)1) For Waveform 5A and 5B, if correct during a test, generator performance verification isnt required.1) When monitoring the voltage if VL is reached before IT and V waveform risetime is shorter than W5 but not shorther than W4 during verification, test is acceptable. 2) When monitoring the voltage if VL is reached before IT and V waveform risetime is shorter and duration longer than Waveform 2 during verification, test is acceptable3) If generator cannot produce a compliant V waveform during verification, a Waveform 4 test is required.4) In certain situations, equipment may be exposed to longer duration waveforms such as Waveform 5BNote: Rev F removes a separate statement regarding power leads since these should not be considered different from other conductors as far as testing is concerned.3422.5.2.1 Cable Induction TestsRev E stated that local ground leads, “ (less than 1 meter in length)

    注意事项

    本文(Updates-on-RTCA-DO-160-Lightning-Test.pdf)为本站会员(得****1)主动上传,淘文阁 - 分享文档赚钱的网站仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知淘文阁 - 分享文档赚钱的网站(点击联系客服),我们立即给予删除!

    温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。




    关于淘文阁 - 版权申诉 - 用户使用规则 - 积分规则 - 联系我们

    本站为文档C TO C交易模式,本站只提供存储空间、用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。本站仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知淘文阁网,我们立即给予删除!客服QQ:136780468 微信:18945177775 电话:18904686070

    工信部备案号:黑ICP备15003705号 © 2020-2023 www.taowenge.com 淘文阁 

    收起
    展开