欢迎来到淘文阁 - 分享文档赚钱的网站! | 帮助中心 好文档才是您的得力助手!
淘文阁 - 分享文档赚钱的网站
全部分类
  • 研究报告>
  • 管理文献>
  • 标准材料>
  • 技术资料>
  • 教育专区>
  • 应用文书>
  • 生活休闲>
  • 考试试题>
  • pptx模板>
  • 工商注册>
  • 期刊短文>
  • 图片设计>
  • ImageVerifierCode 换一换

    实施SAPR3软件中项目管理(1).docx

    • 资源ID:44016832       资源大小:2.66MB        全文页数:98页
    • 资源格式: DOCX        下载积分:20金币
    快捷下载 游客一键下载
    会员登录下载
    微信登录下载
    三方登录下载: 微信开放平台登录   QQ登录  
    二维码
    微信扫一扫登录
    下载资源需要20金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝    微信支付   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    实施SAPR3软件中项目管理(1).docx

    Project Management with SAP R/3Teaching Material for the Department ofProduction ManagementVienna University of Economics andBusiness AdministrationAndreas MildAlfred TaudesV.1.01Introduction32Basics & Keywords43Getting ready for the workshop74Case Study134.1Case description134.2Data for Project Realization145Planning the project structure155.1General155.2Implementation in SAP176Scheduling266.1General266.2Basic calculations296.3Implementation306.4The project planning board417Cost planning & Controlling477.1General477.2Implementation488Looking up the costs619Capacity Planning649.1General649.2Implementation in SAP6510Earned Value Analysis6910.1General6910.1.1Measurement techniques6910.1.2Calculation of Earned-Value and Deviation Analysis7310.1.3Aggregation7410.2Implementation7411Execution7711.1Implementation7711.1.1Confirming network activities7711.1.2Invoices7911.1.3Material8312Information System8612.1Implementation8612.1.1Cost reports8612.1.2Earned-Value Analysis9213Literature981 IntroductionThis script serves as a basis for the workshop "Project Management with SAP R/3". This workshop is part of a series of SAP-related workshops which are held by the Department of Production Management of the Vienna University of Economics and Business Administration, headed by Prof. Dr. Alfred Taudes. The workshop was developed by Andreas Mild. The goal of this Project Management Workshop is that, after having attended it, each student should be familiar with the theoretical backgrounds and be able to plan and control a project. The project manager has the task of ensuring that the project is executed efficiently, on time, and within the budget - which he/she achieves by making certain that the required resources and funds are available when needed. Every student should then be able to put his/her SAP knowledge into action.To make the continuous improvement of this script possible, please report mistakes found or ideas for further development to andreas.mildwu-wien.ac.at.2 Basics & KeywordsSAP R/3 is an integrated and industry-independent standard software which covers, integrates and connects all functional areas in a business. SAP AG defines integration as "defined communication". AFOS (Hrsg.) SAP Arbeit, Management. Braunschweig/Wiesbaden 1996 p.59 Although R/3 is designed for complete integration, it can also be used for a couple of business areas. Computerwelt No. 13 of 13. 3. 1998, p. 20 SAP is the abbreviation for “Systeme, Anwendungen, Produkte”, the German words for “Systems, Applications, Products”. AFOS (Hrsg.) SAP Arbeit, Management. Braunschweig/Wiesbaden 1996 p. 59 Information about the company can be found at: .Projects are tasks with special characteristics. Attributes of a project are the following issues:· complexity, non-repetitivity, high risk· detailed goals to be achieved· time restrictions· high cost and capital expenditure· quality requirements· often strategic significanceTo be able to plan, monitor, control, and carry out a project as a whole, the project goals must be precisely described and the activities to be performed have to be structured. A project can be described as follows:· according to how it is organized, i.e. by explaining the project structure,· according to the processes involved.A project starts out as a statement of work which is either a written description of the objectives to be achieved and the desired rough schedule like start and end dates. In the description one could include also performance metrics and budget constraints.A project is further subdivided into meaningful pieces, referred to as tasks. Tasks take usually less than a few months. The task can be further subdivided into subtasks.A work package can be defined as “a group of activities combined to be assignable to a single organizational unit.” Chase R./Aquilano N./Jacobs R. Production and Operations Management: Manufacturing and Services, p.48 The project tasks, subtasks, and work packages are brought into a hierarchy by defining a work breakdown structure.The individual elements represent activities within the work breakdown structure and are called work breakdown structure elements (WBS elements). WBS elements can be:· tasks· partial tasks which are subdivided further· work packagesWBS can be structured according to· object· function· phaseWhich kind of structuring is used depends on the focus of the project. Objects orientation is often used, if the main part of the project is a physical object like a power plant. Functional organisation is preferred, if many different parts of an organisation or many organisations are involved.In practice, all three kinds of structuring are used within one WBS.“Project Management can be defined as planning, directing, and controlling resources (people, equipment, material) to meet the technical, cost and time constraints of the project.” Chase R./Aquilano N./Jacobs R. Production and Operations Management: Manufacturing and Services, p.48 The primary reason why projects fail is insufficient effort in the planning phase. Chase R./Aquilano N./Jacobs R. Production and Operations Management: Manufacturing and Services p. 69 Project Management thus is considered as very important.The SAP Project System enables close and constant monitoring of all aspects of a project by having constant access to data in all the departments involved.Project management can be subdivided into project planning, i.e. the task which will be undertaken before the project starts, and project controlling during the implementation of the project.Planning must include:· organization service· process dates· costs· capacityThere are many possible project goals such as, for example, to realize a positive net present value, to achieve a high imputed interest, to minimize costs, to cover costs, to maximize gross profit, or simply to finish as early as possible. However, it is important, that goals are defined operationally, thait is when it is possible to measure to which extent the goal has been achieved. The project manager breaks the project down into a set of activities. Then he also defines the relationships among these activities. The outcome is a guideline regarding the activities that can be performed in parallel and those that have to be done in a sequential order. This task is done via planning by network.Now, there are activities that require capacities and resources like personnel and material. Such resources are limited and these requirements have to be considered in order to be able to develop a feasible, sound plan. Information from other modules as e.g. the material planning module is required.The system calculates the material requirements for each step of the project and organizes that materials are bought in time to avoid delays. When purchasing material, the system takes into account order sizes, inventory policies as well as other information. To prepare the financial statements, the value of work in progress (including project work) has to be calculated. This also requires interaction of some R/3 modules.Thus, the system needs information from all business areas simultaneously. And this is exactly what integration does.The project module is part of the integrated concept of SAP R/3 providing interfaces to other modules like Accounting, Distribution, Material Management and Production Planning and Control. Each area within the organization has its own structure and its own view of the project, but data has to be entered only once.3 Getting ready for the workshop This chapter provides information on the first use of the system. Logging on R/3Logging offSAP R/3 is a client/server application. Therefore, you have to cancel the connection with the server by telling it that you want to log off. Create SessionOften it is useful to open more screens. You can do this by creating a new session, like a new document in a word processor.SAP HelpIf you want to get some basic information about a specific field, focus this field with your mouse and press <F1>.The dialog box indicates what the field is for. Sometimes even dependencies are explained.Match codesMatch codes are useful for finding data, because it is difficult to know/remember the identification number of a line position such as a material.Example:You want to edit the material master of a material. You dont know the number, but you know that the material description starts with something like “PM_”If you press F4 you get a search-mask where you are able to search with wildcardsAfter having pressed Enter you get a list with the search results.Then you can select one material, you can sort or cancel. Transaction CodesThe following screen will be often used during the workshop. Thus, we can use Transaction Codes for faster access.Then select Structure planning Change Project.Now, we want to “bookmark” this screen.So, we look up the transaction code.The status dialog box opens:Here we see a lot of information concerning important relevant technical details.Wherever you find yourself in the system, you can get to this screen by entering CJ20 in the Transaction screen.Let us refine this a little bit. If you have several transaction codes, you may get confused. Key in the appropriate transaction code and the comment edit project structure.Then, if you open the combo box of the transaction codes after having entered more codes, you will find the appropriate one .The Standard ToolbarIn many screens you will find the standard toolbar.Save buttonWhen you press the save button, the system also validates your input. If there was an error, you have to correct the error first,before you can proceed.Back buttonIf you click the back button you return to the previous screen without saving your data. HelpEnter buttonWhen you have finished entering information on a screen, you press the Enter button which performs the same function as pressing the Enter key.Exit buttonPress it, if you want to leave the current application to go back to the previous menue.Cancel buttonClick on this button to exit the current task without saving. The Cancel button performs the same function as Cancel in the Edit menu.Print button Paging keysFind/Find next buttonClick on this button, if you want to perform a search for data required in the screen you are currently working in. 4 Case Study4.1 Case descriptionThis case was developed in order to demonstrate the project system of SAP R/3 . All prices and data are pure fiction and held very simple.The object of the project is the specification and installation of an elevator.Physically, the Elevator consists of · a cabine· an engine· mechanical parts· a control unitIn the course of the project, these parts must be constructed, procured and assembled.At the end, an external inspection of the entire system is prescribed.The project must be finished by 30.6.2000.The company consists of two work centers:· Development (PROJ-RD)· Installation (PROJ-INS)Specification activities are performed by the Development department. Procurement activities will be done outside the project organisation, and neither cost nor capacity considerations are planned within a project for procurement. Installation is done by the Installation department. In particular, the activities are as follows:ActivityDurationWorkWork-centerSpecification of the cabine1020DevelopmentSpecification of the engine1010DevelopmentSpecification of mechanical parts2010DevelopmentSpecification of the control unit210DevelopmentProcurement of the cabine20Procurement of the engine50Procurement of mechanical parts10Procurement of the control unit10Installation I15100InstallationInstallation II20100InstallationExternal Inspection1external, 80.000Specification activities can be performed in a consecutive order only. Specification starts with the cabine. After completion, the specification of the engine can be done. Then, the mechanical parts can be designed. The last activity is the design of the control unit.After the completion of each specification activity, the procurement of the specific item can be effected.After the procurement of all parts the Installation can start and must be done in two consecutive steps (I + II).The final activity of the project is external inspection.A 10% planning reserve on the baisis of planned cost is required. No actual cost should be posted to this WBS element.Corresponding materials assigned to the purchasing activitiesParameters für Earned-Value AnalysisAll specification activities and Installation II use the 20-80 Method for performance measurement. Procurement activities use 0100 method.Installation I has 3 milestones, viz. Preparation finished (20%), Installation finished (80%), Quality checked (100%).4.2 Data for Project RealizationActivityStartEndWorkSpecification of the cabine24.1.200004.2.200020Specification of the engine07.2.200005.3.200030Specification of mechanical parts06.3.200022.3.200020Specification of the control unitProcurement of the cabine06.3.200006.3.2000Procurement of the engine07.3.200007.3.2000Procurement of mechanical parts08.3.200008.3.2000Procurement of the control unit09.3.200009.3.2000Installation IInstallation IIExternal InspectionExternal inspection had to be paid in advance at 3.2.2000 (100000 ATS).All material was taken from stock at given time.5 Planning the project structure5.1 GeneralEach project starts with the definition and classification of the structures required for processing and the incorporation of these into the existing enterprise structure.The Project System has no organizational structures of its own; it has to be incorporated into the existing structure by making assignments to the organizational units in Accounting and Logistics. SAP Online Documentation IDES Release 4.0B After that, the project is broken down into meaningful pieces in a hierarchy reaching from tasks to the lowest level, the work packages.Datastructure in SAP As mentioned above, the project must be incorporated into the existing structure by assigning organizational units in Accounting and Logistics.Source: SAP Online Documentation IDES Relea

    注意事项

    本文(实施SAPR3软件中项目管理(1).docx)为本站会员(飞****)主动上传,淘文阁 - 分享文档赚钱的网站仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知淘文阁 - 分享文档赚钱的网站(点击联系客服),我们立即给予删除!

    温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。




    关于淘文阁 - 版权申诉 - 用户使用规则 - 积分规则 - 联系我们

    本站为文档C TO C交易模式,本站只提供存储空间、用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。本站仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知淘文阁网,我们立即给予删除!客服QQ:136780468 微信:18945177775 电话:18904686070

    工信部备案号:黑ICP备15003705号 © 2020-2023 www.taowenge.com 淘文阁 

    收起
    展开