[精选]面向负荷的生产控制与JIT生产(英文版)20506.pptx
-
资源ID:91100435
资源大小:511.36KB
全文页数:21页
- 资源格式: PPTX
下载积分:20金币
快捷下载
会员登录下载
微信登录下载
三方登录下载:
微信扫一扫登录
友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
|
[精选]面向负荷的生产控制与JIT生产(英文版)20506.pptx
Load-oriented manufacturing control just-in-time production for job shopsProduction Planning&Control1994 V ol.5.Wolfgang BechteHannover consultant firm1998/08/18 IntroductionA technique for job shops supporting the JIT concept-Using load-oriented order release,entry(Bechte,Kettner 1980)-Manufacturing control system is designed by Krautzig.-Implemented in many factories(Wiendahl,Bechte 19871991)Basic principles&technique for Load-oriented manufacturing control Detailed computational procedure refer to more theoretical publication written by Wiendahl(1993),Bechte(1988)content1.Objectives of load-oriented manufacturing control2.Structure of load-oriented manufacturing control3.Basic concept in load-oriented manufacturing control4.Overview of a load-oriented manufacturing control system5.Example of the control system1.Objectives of load-oriented manufacturing controlReducing lead-time and WIP.Keeping actual lead-time on stable lowest possible level.-Permanently In/Out put,inventory and average lead time of W/C are monitored and compared with their planned values in dynamic wayAt the same time determine Bottlenecks,short&mid-term capacity planningFurnishing realistic due-date scheduling and capacity planning2.Structure of load-oriented manufacturing controlFlow of orders for one single machineIllustrating events,a hierarchical controller levels,sectionsFigure 1.Funnel model of job shopMulti-level closed-loop control systemHigher controller level depends on theperformance of the lower one.CompanyDISPOSITIONJob ShopMachineSalesDue DateLead timeUtilizationMfg.AssemblyReceiving Shipping Supplier CustomerDisturbancesProd ScheduleLong Term CapacitiesOrder EntryMid termCapacitiesOrder releaseShort termCapacitiesOperation SequencesCapacities LoadingFigure2.Multilevel closed-loop control system.3.Basic concept in load-oriented manufacturing control3.1 Basic relationship at a Work centerFour simple rules for regulating Input,Output,Inventory and Lead time1)constant inventory-keep In/Output the same on a avg.2)changing inventory-change input3)Average lead time-adjust In/Out ratio4)Individual lead time to be even-apply FIFO rule while dispatchingAvg.lead time=Avg.Inv.Avg.OutputQueuing ordersAvg.OutputAvg.InputAvg.InventoryInputInitialInventoryAvg.Lead timeAvg.InventoryOutput curveInput curveOutputFinal InventoryControl PeriodLoadHoursTimedaysCompleted OrdersArriving OrdersFigure 3.Basic relationship and throughput diagramBasic relationship at work center to plan the Input,Output,Inventory and Lead timeload limit=Planned output*(Planned lead time+Planning period)Planning period3.Basic concept in load-oriented manufacturing control3.2 Principle of Load limiting and Load conversionAdding LoadRemainingLoadLoadlimitPlannedInputActualInventoryPlannedlead timeCase A case BTodayPlanning PeriodPlanned Inv.(Buffer)Plannedoutput(capacity)Figure4.Load limiting.In case that exceeding loads happensLoad limiting reject or prefer orders or variesRequired capacity=present load*planning periodplanned lead time+planning periodRejectedLoadAllowedloadLoadlimitExceeding loadPresent LoadPlannedlead timeRequiredBufferRequiredcapacityFigure5.Short-term capacity planning using the load limitRequired Input CurveRequiredoutput curve.Order release should consider the work center loads and capacitiesFour type of loads In case of B,D a statistical estimation is needed;Load conversion factordepreciation factor=planned output/Load limit=planning periodplanned lead time+planning periodLimiting and balance work in process by order release.Planned Inv.(I)(D)LoadlimitPlannedlead timeTodayPlanned Inv.(Buffer)Plannedoutput(capacity)(D)Planned Release(I)Ideal Released CurveFull loadConverted LoadFigure6.Derivation of conversion using the load limitA considering the available capacities of a short-term planning periods(12Week)Planned orders were scheduled backwardSelects periodically those of the planned ordersStep1.Establish urgent ordersStep2.Release wotrkable ordersTime limit3.Basic concept in load-oriented manufacturing control3.3 Technique of load-oriented order release.If capacities is needed Load-oriented release require appreciate decisionc b aac a bb a cPlanning periodTime limittodayTimeDaysDueOver dueFutureNon-UrgentOrder 4312WorkableWorkableUnworkableOmissibleA B CWork centersLoadHoursLoad limitReleasedLoadRemainingLoadFigure 7.Steps of Load-oriented order release3.Basic concept in load-oriented manufacturing control3.4 Technique of load-oriented order entryThe ideas of Load-oriented order entry is to avoid overloaded weeksChecks the scheduled operation dates against available capacities for a midterm planning horizon(ex 12 weeks)Realistic due dates are offered and the expected bottlenecks are indicated.Initiation capacity changes in advance if possibleOverload weeks Free date.Cumulative LoadCumulative CapacityBacklogOverload WeeksUnderloadweeksPlanning horizonTodayTime weekFree DateOverloadPortion83%TotalLoad100%LoadhourFigure 8.Cumulative load and capacity of a work center.C is a critical work centerA B C D EABCDEOverload WeeksTodayTime weekWorkcenterABCDEFree DateOrder Lead TimeOperation Lead TimeRealistic Release Date Realistic Delivery DatePlanning HorizonFigure 9.Establishing a realistic delivery date of an order4.Overview of a load-oriented manufacturing control system1.Routing data2.Order data3.Item data4.Shop calendar5.Capacity data6.Transaction data7.Control data:detailed tables for w/c and free definable group.PROGRAMTransactionDataPROGRAMControlDataPROGRAMShopCalendarProgramGraphsReportsPROGRAMOperationSequencingPROGRAMOrderReleasePROGRAMOrderEntryDIALOGCapacitiesDIALOGOperationCompleteDIALOGOrderReleaseDIALOGOrderEntryCapacitiesEntriesCapacitiesReleaseCapacitiesSequencesGraphsReportsCONTROL SYSTEM(PC)BASIC SYSTEM(HOST)PLANNING SYSTEM(PC)Figure 10.Load-oriented manufacturing control system showing the data flow5.Example of the control system1.The method of basic throughput diagrams is extended(Figure 1 with diagrams)2.Operation Throughput Element3.Planned and actual average lead time are computed for each inventory as well as average due-date dev.For release,input,output and deliveryEntry Release Input Output DeliveryDisposition Indirect Direct DownstreamUpstreamOpenCycleTotal lead timeWait after operation Transport Wait before operation Setup RunInteroperation time Process timeDirect Load time.4.Pump-building factory characteristics products 9000 pumps Manufactured parts 26000 different itemsManpower(Job shop)180 persons Work centers 130(mainly 2 shifts)Orders 350 per week Operations 4,5 per order(Max 20)Run times 3,7 per operation Lot sizes 30 per order(1-1000)Factory began to work with the new system in 1987Improvement(compared 1991 with 1987)Inventory was twice as high in 1987Most delivery higher than in 1987Cycle lead time(release delivery)were cut from almost 8weeks to 5weeksDue-date deviations 4.5 to 1 week(lateness)Total lead time(entrydelivery)14weeks to 9 weeksConclusionLoad-oriented manufacturing control system enables the factory 1.Reducing lead time and inventories 2.Keeping actual lead time on a planned level 3.Meeting the planned due dates 4.Maintain an appropriate work-center utilizationresults in safer scheduling foundation for JIT production演讲完毕,谢谢观看!