CQI-15+新版检查表(模版).xlsx
《CQI-15+新版检查表(模版).xlsx》由会员分享,可在线阅读,更多相关《CQI-15+新版检查表(模版).xlsx(169页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、CQICQI-1515SpecialSpecial Process:Process:WeldingWelding SystemSystem AssessmentAssessmentVersion 2 Issued 10/2019AIAG CQI-15 Special Process:Welding System AssessmentCompany Name:CurrentStatusREDJob Audit SummaryStreet Address:GMAW OverallNot CompletedCountry/City/State/ZIP Code:Weld System%Complia
2、nce33.33%GMAW CTQ0 RED CTQ ItemsSite Code:LBW OverallNot CompletedParent Code:Job Audit%ComplianceNotCompletedLBW CTQ0 RED CTQ ItemsCurrent Quality Certification(s):Drawn Arc OverallNot CompletedDate of This Assessment:January 18,2021Overall Total of WSAand Job Audits33.33%Drawn Arc CTQ0 RED CTQ Ite
3、msDate of Initial Assessment:Resistance OverallNot CompletedDate of Re-Assessment(if necessary):Resistance CTQ0 RED CTQ ItemsNumber of Welding Employees at this Facility:Friction OverallNot CompletedCaptive Weld Organization(Y/N):Friction CTQ0 RED CTQ ItemsInduction OverallNot CompletedReview Member
4、sTitleEmail AddressPhoneInduction CTQ0 RED CTQ ItemsFastener Projection Not CompletedFastener Projection CTQ0 RED CTQ ItemsMIAB OverallNot CompletedMIAB CTQ0 RED CTQ ItemsCTQ=Critical to QualityHigher is BetterSite Responsible PersonTitleEmail AddressPhoneSupplier ContactsTitleEmail AddressPhoneWeld
5、 Classifications:Ship To LocationsTier Level Contact NameContact eMailWelding Processes Used:Welding Specifications Used:Commodity:ChassisPart Number(s)Assessed:Vehicle/ProgramProduct InformationOverall Summary Comments:LEGENDRedAny RED ElementDoes NOT meet the requirements,needs immediate action.Pr
6、ocess review indicates that there is a risk of non-conforming product.Yellow100%GREEN-0-REDDoes NOT meet the requirements,containment is in place.Process review indicates that there is sufficient containment of non-conforming product.Green100%GREENMeets all requirementsSUMMARY of RESPONSESWelding Sy
7、stem AssessmentSection%Compliance ofRated ElementsREDYELLOWGREENPossibleElementsSection 1Weld System Process Assessment(SPS Assessment)33.33%1117Section 2DocumentationNot Completed00018Section 3Preplanning/Quality DocumentationNot Completed00026Section 4Production Monitoring/DocumentationNot Complet
8、ed00022Section 5Rework or Scrap Procedures and ReportsNot Completed0005%of Items Completed3.85%Section 1-5 Total33.33%111WELDING JOB PROCESSESSection%Compliance ofRated ElementsREDYELLOWGREENPossibleElementsGMAW Overall1.PART PRINTNot Completed0006Not Completed2.CONTROL PLANNot Completed00011GMAW Cr
9、itical to Quality3.DESTRUCTIVE&NONDESTRUCTIVE TESTING DATANot Completed00030 RED CTQ Items4.WELD QUALITY INSPECTION&REPORTSNot Completed00010%of Items Completed5.REWORK PROCEDURE&REPORTSNot Completed00090.00%6.PARAMETER DOCUMENTATIONNot Completed000207.MAINTENANCE RECORDSNot Completed00078.SUSTAINAB
10、ILITYNot Completed00029.EQUIPMENT&ROBOTIC PROCESSING REQUIREMENTSNot Completed0005LBW Overall1.PART PRINTNot Completed0006Not Completed2.CONTROL PLANNot Completed00013LBW Critical to Quality3.DESTRUCTIVE&NONDESTRUCTIVE TESTING DATANot Completed00030 RED CTQ Items4.WELD QUALITY INSPECTION&REPORTSNot
11、Completed00010%of Items Completed5.REWORK PROCEDURE&REPORTSNot Completed00090.00%6.PARAMETER DOCUMENTATIONNot Completed000407.MAINTENANCE RECORDSNot Completed00098.SUSTAINABILITYNot Completed00029.EQUIPMENT&ROBOTIC PROCESSING REQUIREMENTSNot Completed0002Drawn Arc Overall1.PART PRINTNot Completed000
12、5Not Completed2.CONTROL PLANNot Completed00010Drawn Arc Critical to Quality3.DESTRUCTIVE&NONDESTRUCTIVE TESTING DATANot Completed00030 RED CTQ Items4.WELD QUALITY INSPECTION&REPORTSNot Completed0008%of Items Completed5.REWORK PROCEDURE&REPORTSNot Completed00090.00%6.PARAMETER DOCUMENTATIONNot Comple
13、ted000277.MAINTENANCE RECORDSNot Completed00088.SUSTAINABILITYNot Completed00039.EQUIPMENT&ROBOTIC PROCESSING REQUIREMENTSNot Completed0001Resistance Overall1.PART PRINTNot Completed0005Not Completed2.CONTROL PLANNot Completed00012Resistance Critical to Quality3.DESTRUCTIVE&NONDESTRUCTIVE TESTING DA
14、TANot Completed00030 RED CTQ Items4.WELD QUALITY INSPECTION&REPORTSNot Completed0009%of Items Completed5.REWORK PROCEDURE&REPORTSNot Completed00090.00%6.PARAMETER DOCUMENTATIONNot Completed000277.MAINTENANCE RECORDSNot Completed00098.SUSTAINABILITYNot Completed00039.EQUIPMENT&ROBOTIC PROCESSING REQU
15、IREMENTSNot Completed0001Friction Overall1.PART PRINTNot Completed0004Not Completed2.CONTROL PLANNot Completed00017Friction Critical to Quality3.DESTRUCTIVE&NONDESTRUCTIVE TESTING DATANot Completed00030 RED CTQ Items4.WELD QUALITY INSPECTION&REPORTSNot Completed00010%of Items Completed5.PARAMETER DO
16、CUMENTATIONNot Completed000280.00%6.MAINTENANCE RECORDSNot Completed00067.SUSTAINABILITYNot Completed00028.EQUIPMENT&ROBOTIC PROCESSING REQUIREMENTS Not Completed0001Induction Overall1.PART PRINTNot Completed0004Not Completed2.CONTROL PLANNot Completed00013Induction Critical to Quality3.DESTRUCTIVE&
17、NONDESTRUCTIVE TESTING DATANot Completed00030 RED CTQ Items4.WELD QUALITY INSPECTION&REPORTSNot Completed00010%of Items Completed5.PARAMETER DOCUMENTATIONNot Completed000170.00%6.MAINTENANCE RECORDSNot Completed00027.SUSTAINABILITYNot Completed00018.EQUIPMENT&ROBOTIC PROCESSING REQUIREMENTSNot Compl
18、eted0001Fastener Projection Overall1.PART PRINTNot Completed0004Not Completed2.CONTROL PLANNot Completed00010Fastener Projection Critical to Quality3.DESTRUCTIVE&NONDESTRUCTIVE TESTING DATANot Completed00030 RED CTQ Items4.WELD QUALITY INSPECTION&REPORTSNot Completed00014%of Items Completed5.REWORK
19、PROCEDURE&REPORTSNot Completed00090.00%6.PARAMETER DOCUMENTATIONNot Completed000297.MAINTENANCE RECORDSNot Completed00088.SUSTAINABILITYNot Completed00029.EQUIPMENT&ROBOTIC PROCESSING REQUIREMENTSNot Completed0001MIAB Overall1.PART PRINTNot Completed0004Not Completed2.CONTROL PLANNot Completed00016M
20、IAB Critical to Quality3.DESTRUCTIVE&NONDESTRUCTIVE TESTING DATANot Completed00030 RED CTQ Items4.WELD QUALITY INSPECTION&REPORTSNot Completed0009%of Items Completed5.PARAMETER DOCUMENTATIONNot Completed000180.00%6.MAINTENANCE RECORDSNot Completed00057.SUSTAINABILITYNot Completed00028.EQUIPMENT&ROBO
21、TIC PROCESSING REQUIREMENTSNot Completed0001Job Audit TotalNot Completed000Overall Total33.33%111CQICQI-1515SpecialSpecial Process:Process:WeldingWelding SystemSystem AssessmentAssessmentVersion 2 Issued 10/2019Weld System AssessmentAssessor00Date18-Jan-21(Name-Company)(Name(Name -Location)Location)
22、ItemNo.QuestionRequirements and Guidance1/0/1900InitialRating(R/Y/G)Evidence/Gap Identified1/18/2021CurrentStatus(R/Y/G)Follow up CommentsSection 1-Weld System Process Assessment1.1Are internal assessments being completed on anannual basis,at a minimum,using AIAG WeldingSystem Assessment(WSA)?The or
23、ganization shall conduct internal assessments on an annual basis,at a minimum,unless otherwise specifiedby the customer,using the AIAG WSA.Concerns shall be addressed in a timely manner.Yellow=START HEREYellow1.2Is there a dedicated and qualified technical weldingperson on-site?To ensure readily ava
24、ilable expertise,there shall be a dedicated,qualified and full time welding person on site.Thisindividual shall be one of the following:1.Degreed Welding Engineer,or equivalent science degree.2.Certified Welding Inspector from approved internationally recognized organization.3.A minimum of 5 years e
25、xperience in welding operations or a combination of a minimum of 5 years of formalmetallurgical education and welding experience.4.A qualified person agreed upon between customer and supplier with documentation approval.GreenGreen1.3Are the facilities sufficient for the welding operation?Facilities:
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CQI 15 新版 检查表 模版
限制150内