三峡大坝英语导游词.docx
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_05.gif)
《三峡大坝英语导游词.docx》由会员分享,可在线阅读,更多相关《三峡大坝英语导游词.docx(27页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、三峡大坝英语导游词 三峡大坝英语导游词 The Three Gorge Dam Dear friends Welcome to Yichang.Im your tour guide in Yichang, my name is Wang Jing, you can call me Xiao Wang.Im from Xiazhou International Travel Service.Now, bring your belongings with you, and follow me to coach.Ok, let me introduce our driver, his name is
2、 Li Yao, you can call him Li Shifu, here is our itinerary for these days.If you have some difficulties, please let me know, I would be very happy to help you.My contact way is in it.You must be very tired after a long journey.We are going to Taohualing Hotel and take a rest.Here is our hotel, please
3、 give me your ID and Ill help you to register.Hi, here are your room cards and remember well meet at the gate at 8:00 tomorrow morning, we will visit Three Gorges Dam. Hi, good morning, You look better than yesterday.Now collect your belongings and get on the bus.Hello, we ll visit the Three Gorges
4、Dam.It may take you half an hour bus from the Yichang urban to the dam area.Let me tell you something about it, The Three Gorges Dam is the first 5A-cla tour sites in Yichang and has been listed as one of the first national demonstrations on industrial tourism.As the world largest hydropower project
5、, the Three Gorges Project is located at the Zhongbao Island near Sandouping in Yichang, and about 37 km away from the Gezhouba Hydropower project in the downstream.The whole construction is completed according to the plan of “first cla development, complete construction, reservoir by stages, and co
6、ntinuous immigrants”.The total construction period lasted for 17 years including three phases.The first phase was from 1993 to 1997; the second phase was from 1998 to 2003; and the third one is from 2004 to 2009.The total investment is estimated to be RMB 203.9 billion Yuan.The reservoir will submer
7、ge about 1.1318 million people to immigrate to higher place.When this project is finally completed, the reserved water level will reach 175 m, with total reservoir capacity of 39.3 billion cubic meters. Tanzi Ling (Peak Crock) Scenic Spot Here we are the top of the Dam area, the Tangzi Ling (Peak Cr
8、ock),with a height of 242.48 m.And we can overlook the general of Three Gorges Project and Dam Area. The name is from its shape of upside down crock.Its said that in the ancient time, when Da Yu led people dredge the watercourse and fought against the flood, he was too involved to enter the door eve
9、n when he paed his home third times.With the help of magic bull, he excavated 200-km watercourse.In order to thank his achievement, people sent him 24 pigs and a big crock of wine by boat.When the boat reached Sandouping (the Project site), they saw the magic bull going away on clouds and leaving it
10、s image in mountains, where was called the Bull Rock later.Hastily, Da Yu followed the bull, leaving a big rock for memory.People were deeply moved by what happened, and kept the boat waiting in the river.Later, the boat turned into an island, called Zhongbao Island.24 pigs were down into the river
11、turning into 24 reefs.And that big wine crock was set in the left bank turning into now called Tanzi Ling. The Model Hall of the Three Gorges Project 模型室 On the Tanzi Ling, we first visit the Hall of the Project Model, where shows the whole mini construction of the Project.And there we can view real
12、 part of the Eternal Riverbed Rock, the Sill under the Dam and the Damming Rock.Then we climbed the peak top and overlook the overall appearance of the Three Gorges Project. These models lay out the complete project with a scale of 1:850.As the largest one in the world, the Project with large instal
13、led capacity and huge engineering scope will bring out marked and integrated benefits.With13 tops in the world, this project is not only for flood control but also giving great benefits to the later generations, showing great role in comprehensive national strength increase of China. The Project bod
14、y consists of the main dam, generation stations and navigation building.The concrete gravity main dam is about 2309 m in length and 185 m in height.And the dam top width is 15 m, while the bottom one is 124 m.The discharge dam is in the middle of the Main Dam, while power generation stations are in
15、both ends.The 483-meter discharge dam consists of 22 overflows and 23 deep overflows, functioning as flood discharge and sludge remove. The generation stations are in the both ends of the main dam.14 generators are installed for left generation stations, while 12 for right ones.With 700 thousand kW
16、capacity for each, the installed capacity will reach 18.2 million kW and 84.7 billion kW/h each year, which accounts for 1/9 of the nation total and is 5.3 times of the Gezhouba projects total. The navigation buildings consist of two-way 5-stage ship lock and ship elevator.The ship lock is 6442 m in
17、 length and 300 m in width, with two way and 5 stages.And it is divided into 10 rooms, 280 m in length and 34 m in width for each, with minimum water depth of 5 m; the fall between upstream and downstream is 113 m, suitable for 10 thousand tonnages ships.But it takes almost two and half hour to pa t
18、hrough the lock.Therefore, the ship elevator is designed for fast navigation for medium and small ships below 3000 tonnages.The elevator container is about 120 m in length and 18 m in width, with minimum water depth of 3.5 m.And it only needs 30-40 minutes for these ships to pa through the dam. Eter
19、nal Riverbed Rock万年江底石 This is a riverbed rock.Its granite, with weight over 20 ton.Commonly we call it the “Eternal Riverbed Rock”.Actually, its over 0.8 billion years old.From this rock, people get to know the very past of the Yangtze River.Now, on the rock, we can see some bore holes, which were
20、left by the geologists and the hydropower s when investing the dam site.And this rock was originally excavated from the footing groove of cofferdamk?f?,d?m during the 2 phase construction period. The Damming Rock 截流石 This is the damming rock, a double sized model.We put it here to make it a symbol o
21、f the spirit of water controlling.The real rock is triangle tetrahedro, with each side length of 2.5m, and weight of 28 ton.In 1981, rocks used for damming the Yangtze River at the Gezhouba Project were just half the size.This shape was approved by the modern technology as the best to fight against
22、the rip current.When thrown into the water, its sharp edge cuts into silt to make it stable in the flow.So rocks of this shape, representing the modern hydro technology, have been applied for both Gezhouba Project and Three Gorges Project. The Sill under the Dam This columned rock pillar is a sample
23、 of the sill under the dam.Before the construction, there used to be an island, Zhongbao Island, in the center of Yangtze River.And this rock was drilled out from the rock formation under the island.Been considered and approved over 70 years, the Yangtze Three Gorges Project site was finally set at
24、the Zhongbao Island.And now, this island is disappeared.So this rock shows both memory and witne for the great Three gorges Project. The great Emboment浮雕群 This emboment is called “the headstream breeding the life”.The big copper plate emboment in the front looks like a generating wheel in water, and
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 三峡 大坝 英语 导游
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内