2022年kv区域性降压变电所一次系统设计外文翻译.docx
《2022年kv区域性降压变电所一次系统设计外文翻译.docx》由会员分享,可在线阅读,更多相关《2022年kv区域性降压变电所一次系统设计外文翻译.docx(8页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、精品学习资源110 kV substations digital transformation case analysisAbstractThis paper brieflyintroduces the basic concept ofdigitalsubstation, Analysisedsubstation digitizationreconstruction examples based on110kVsubstationsA.detailed analysised ofthe substation secondary equipmentsuch aschanges in operat
2、ing mode.Digital Substation discussed possible options for reform, and according to the results of the operation of digital substation work out countermeasures and Recommended.Key words digital substation; automation; Electronic TransformerWith automation and computer network traffic monitoring and
3、protection technology, the rapid development in Past two decadeshas made substantial progress has been achieved for the digital substation automation system . Network laid the technical foundationforfulfillingthe other hand, withthe special high-voltagelarge- capacity .The gradual formation of large
4、 scale grid, the grid stable and reliable control of the safety information exchange , And put forward higher requirements of the urgent. Digital Substation substation construction will be Trends .1. the characteristics of digital substationThe basic features of digital substation can be summarized
5、as: intelligent primary equipment, secondary equipment network, automated operation and management system. Since the station relative toconventional integrated, digitalsubstation equipment,theprotectiveprinciple,theinternalalgorithm,logichasnot fundamentally changed, but in sampling digital, network
6、ed communication medium, communication interface standardization brought changes to improve the reliability ofsubstation automation system. Reliability of information transmission can be achieved; secondary wiring is simple; measurement accuracy; share unified information platform, reduce duplicatio
7、n of equipment ; easy functionality expansion; management automation.2. 110 kV Substation rehabilitation programs1 a part of. 110kV single busbar sub-main wiring methods, 110kV line 3 times, with a standby power source; the main volume into 2 sets of 3 variables ; 35kV main connection method for the
8、 Single Bus, 35kV line 5 back; 10kV main connection is a single busbar way, 2 sets of capacitors, 10kV line 18 back, 2 sets of ground change,the replacement oftransformers forthe electronic, installationofPT parallel combiner; replacement in situ terminal box, installation switches intelligent unit,
9、 to achieve local control switch ; configuration integrated digital protection monitoring devices and digital power meter, equipped with digital standby power source device,care monitoring devices and focus group screen interval of combiner.2 station control layer. Station control layer consists of
10、a units monitoring host, 2 Machines GPS communications management component to form the station control level star network, monitoringthe host machine automatically selects the host communication management, communication management unit and the interval as an independent link layer device, and the
11、bay level devices communication, accessto remote, telemetry data, only the host with the remote authority, communication management unit interval of five anti-blocking cross-sequence and function of small欢迎下载精品学习资源current grounding line, for the interval layer and process layer device when the hard
12、right.3 spacer. Interval layer is the core of the station automation, communications related to the implementation of the process level GOOSE 35kV, 10kV lines, capacitors, ground change, sub-protective and monitoringlocal installation ; 110kV Main Transformer Protection and Control focus group back
13、screen, installed in the control Room, located optical interface screen, providing the distance to the control room of the optical conversion interface; three sides of the main transformer backup protection one, 110kV segmentation and one prepared from the cast; monitoring interface communication, l
14、ockout protection association; private GOOSE network to achieve important, the key trip control, station control layer GOOSEnetwork, to achieve control of auxiliary tripping minor, such as the low cycle load shedding.4 the process level. Parallel combination provides voltage voltage, the output inte
15、rval of combiner to provide the voltage signal; the main transformer and back of each side of the differential transformer is divided into, setting separatecombiner, combiner transformer transformer protection group in the main screen; 110kV line segment combiner configured individually, group withi
16、n the control room screen line combiner; 35kV 10kV PT 1 set of each combiner configured to achieve PT parallel functions; arranged in the sub-cabinet; 35kV 10kV part of the accessby small- signal combiner, arranged in switch cabinet.5 communication network. a. station control station control interla
17、yer layer network layer network: set a switch, the Internet communications management unit monitoring host dual GPS; interval layer network: at 10kV I Section II Section were placed on a switch, 35kV put a switch in paragraph , the main cabinet to set up a communications switch, focus group screen s
18、pacer device to the communications network of the main cabinet b. the process level,GOOSE private network.Process layer network: electronic transformer CT interval of combiner access, electronic access to the voltage transformer PT merger, voltage output access interval of combiner combiner ;GOOSE N
19、etwork: ringnetwork composed of 1 # Main Variable interval Protection and Control and smart cell group into a RSG2100, 2 # Main Transformer Protection and Control and intelligence unit interval group into another RSG2100, 110kV lineinterval of Protection and Control and intelligence unit set into an
20、other RSG2100,composed of a single inter-switch interconnect ring.6 After the transformation of the substation has the advantage. a. back-office system integration, are in compliance with requirements of the secondary consolidation; b. with 61850 protocol, consistency, and simple interface without a
21、 lot of signalcable installation and commissioning work is small, can reduce the cost of maintenance and renovation; c. use of electronic CT / PT, non-core, eliminating the magneticsaturation; to avoid the CT open circuit,earth fault inthe secondary circuitproblems; d. long-distance transmission of
22、digital signals using optical fiber, anti- interference ability, reducing the transmission error; of nearly still use the hard- wiring from the transmission, reducing the number of devices to simplify structure.3. substations protection equipment remote monitoring and management systems analysis and
23、 design欢迎下载精品学习资源1 substation protection equipment remote monitoring and management system The system for power companies to protect managements application requirementsdesigned to protect the department aims to provide a management and maintenance of station equipment platform, the system should me
24、et the following features: timely, accurate collection of station equipment, real-time information; accurate monitoringof all setting relay station changes, and timely warning; comprehensive managementof all the relay stations recorded dat;aprovides engineers easy access to any virtualchannels to al
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 2022 kv 区域性 降压 变电所 一次 系统 设计 外文 翻译
限制150内