1、精选优质文档-倾情为你奉上Crushed Stone Base Construction Programme1. Purpose and Basis of the Programme1.1 Purpose: To guide the base construction in accordance with the Specification.1.2 Basis of the Programme1.2.1 Design DrawingsDWG. No.: TS-001/2 TS-002/2 CS-001/2CS-037/2 CRS-001/2CRS-070/21.2.2 Specificatio
2、nsWoreta-Woldiya Road Upgrading Project CONTRACT 2: Gob Gob - Gashena Bidding Documents Volume Ib Section Vi - Technical Specification:Part 1:General Specification 1205 Workmanship and Quality Control 1219 Remedial Work 3200 Placing and CompactionPart 2:Particular Specification 3407 Classification o
3、f Fill 3408 The Capping Layer 3700 Crushed Stone Base1.2.3 Other StandardsBS812: PART 1BS812: PART 3AASHTO T96AASHTO T104AASHTO T180 DAASHTO T1912. GeneralThe Woreta-Woldiya Road Upgrading Project Contract 2: Gob Gob Gashena with the initial station of 98+878.63 and terminal station of 184+800 has a
4、 total length of 85.92137Km. The base course will be crushed stone base with a quantity of m3.According to the general programme, the construction of base course will be divided into two sections to cover the part from Sta.134+300 to Sta.184+800 and Sta.134+300 to Sta.98+684 respectively. The road-m
5、ixing method and plant-mixing method will be adopted for the construction.3. MaterialsThe crushed aggregate will be employed as the material for base layer and the grading will conform to the grading given in Table 3702/1. The Aggregate Crushing Value will be no more than 25%, the Loss by abrasion w
6、ill not exceed 35%, the Loss of Sodium Sulphate Soundness will not exceed 12% and the Loss of Magnesium Sulphate Soundness will not exceed 15%.Flakiness Index: 35% Max.Liquid Limit: 20% Max.Plasticity Index: 6% Max.CBR: 80% Min.Sand equivalent: 25% Min.The material shall be plastic enough to be well
7、 compacted.Table-3702/1 Grading envelope crushed stoneSieve size (mm)Percentage Passing (by weight)Tolerance on target Grading (% passing by Mass)50.010037.595-1002.019.060-806.09.540-608.04.7525-402.3615-300.68-226.00.0755-102.04. Workmanship4.1 Road-mixing methodThe process for road-mixing method
8、will be as follows:Preparation of underlying layer Setting out Transportation and placing of aggregate Watering Mixing Shaping Rolling Maintenance.Prior to the commencement of any base course construction, a trial section of not less than 1000m2 in area will be laid to demonstrate the suitable const
9、ruction methodology including suitable equipment, mixing, paving method, rolling speed and passes and inspection etc., loose thickness and suitable length for execution. 4.1.1 Preparation of underlying layer and setting outThe underlying layer (subbase) will be checked and approved complying with th
10、e quality requirement with an even and sound surface and specified crown before the commencement of base construction. Then the centreline will be reinstated over the underlying layer and one peg will be installed at an interval of every 15 to 20m for straight line and every 10 to 20m for smooth cur
11、ve to fix the contour line of the base course. And the indicating stake will be stand on the edge of both base sides, clearly marking the position of design level and loose thickness for the base.4.1.2 Transportation and placing of aggregateThe mixing ratio of crushed stone and chips will be calcula
12、ted in accordance with Table-3702/1 Grading envelope crushed stone. The quantity of loose material will be calculated using the coefficient of loose laying (obtained from the test), compaction thickness, dry compacted density, width of base and intended placing length. The paving area and stockpilin
13、g distance of the loading material will be calculated.The aggregate will be delivered before placing by dump truck with uniform loading capacity and the unloading distance will be strict controlled over the underlying layer.The underlying layer will be watered to suitable moisture content and where
14、the area of which is too wet will be dried out to required moisture then spread by grader. Where oversize materials and layer exceeding the required thickness exist, it will be removed by hand and area without aggregate will be made good with qualified materials. The deleterious material will be rem
15、oved and the loose thickness will be checked to reach designed requirement. The traffic will be forbidden over loose crushed stone layer except the water truck.4.1.3 WateringThe water content will be tested on loose crushed stone layer and suitable content will be 1% more than optimum water content.
16、 The water will be equally added into the material to avoid excess moisture if the water content is not satisfactory.4.1.4 MixingOn the completion of placing, the mixing frequency will be fixed by the test and the mixing will be carried out with grader. The aggregate will be mixed uniformly without
17、segregation of coarse and fine materials and the water content will be 1% more than optimum water content. 4.1.5 ShapingThe shaping of the work will be initially carried out by grader after mixing the aggregate uniformly. It will be bladed more than one time, if necessary, from both sides to the cen
18、ter of the road for straight line section and from inside to outside of the road for smooth curve. The surface after shaping will be rolled quickly by grader to expose the existing unflatness. The defects and discrepancies will be scarified, re-mixed and leveled. Then the materials exceeding the roa
19、d level will be bladed out of the road by grader. The shaping work must have required slope and crown. The special care must be taken to make the joints clean and neat. In the process of shaping, the traffic and segregation of coarse and fine materials will be forbidden. 4.1.6 RollingWhere the water
20、 content of mixture after Shaping arrives at the optimum water content or 1% more than optimum water content, the vibratory roller of 20T will be employed to roll full width of the surface. The rolling will be started from both shoulders to road center for straight line and smooth curve without supe
21、relevation and from inside shoulder to outside shoulder for curve with superelevation. The overlap width will be one half width of the wheel when rolling. The rear wheel of the roller must exceed the joint of two adjacent sections. The suitable rolling speed will be 1.5 -1.7Km/h in the first two pas
22、ses and then changed into 2.0 -2.5Km/h. The rolling passes will be as specified in the trial section. The stabilized crushed stone surface will be maintained moisture during rolling and watered to avoid rapid evaporation. The surface which appears as springing, loosening or scaling will be scarified
23、, re-mixed or replaced with suitable materials to required quality. Prior to the completion of rolling, the grader will be adopted in leveling work for the purpose of required crown and superelevation. Care must be taken to blade the material exceeding the surface level out of the road. The defects