展会特装搭建合同英文样本The-construction-contract-of-special-booth(共4页).doc
《展会特装搭建合同英文样本The-construction-contract-of-special-booth(共4页).doc》由会员分享,可在线阅读,更多相关《展会特装搭建合同英文样本The-construction-contract-of-special-booth(共4页).doc(4页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、精选优质文档-倾情为你奉上The construction contract of special boothContract Number: Place: Shanghai Pudong New AreaDate: April 2, 2015Party A: (hereinafter referred to as Party A)Contact:Tel:Fax:Cell phone:Party B: (hereinafter referred to as Party B)Contact:Tel:Fax:Cell phone:Accordance with the Peoples Republ
2、ic of China Contract Law and the relevant laws and regulations, combined with construction features of special booth, both parties based in equality, voluntariness, consensus, for the 2015, the Shanghai New International Expo Center - (- -) which the special booth planning, production, stand constru
3、ction, decoration, stand dismantling works and services etc. reached the following agreements:I. Project OverviewProject Name:Project time:Location:Project Area: Project Progress:Party B shall begin stand construction work at 13:00 on June 25, 2015;Party B shall complete the stand construction work
4、on June 27, 2015;Party B shall be responsible for dismantling work after the show closing on June 30, 2015 .II. Cost of the project:The total construction cost of the contracted project (including tax): (RMB );Notes: 1, charged exhibition space (Raw) management fee will be paid by the Party B, and t
5、he total cost above shall contain such fee.2, the electric box application and usage fees will be paid by the Party B, and the total cost above shall contain such fees.III. The project funds and payment date:Party A within three working days from signing the contract date shall pay the 70% contracte
6、d total cost (RMB ) as advance payment. When Party A accept the finished booth constructed by Party B, Party A will pay for the remaining 30% balance (RMB ) to Party B be in cash or bank transfer. After Party B receiving the balance, the full invoice shall be delivered to the Party A.Party B has the
7、 right to refuse to start the construction before receiving the prepayment.IV. The liability of Party A and Party BParty As responsibilities:1) fully pay to Party B on schedule;2) to provide standard files including LOGO vector files, pictures, inkjet and other image files (for AI format, vector fil
8、e or other available formats) within the specified time.3) assist the Party B related coordination. (Eg: raw space management fee, apply and pay the electric box etc.)4) when stand construction completed, Party A shall cooperate with Party B to check and accept it and any doubt should be noted on th
9、e spot, or it will be considered acceptable.5) from the booth setup to move-out, any damages of venues, space, facilities (such as electrical boxes, stadium floor, etc.) caused by Party A which shall take in charge of the compensation in accordance with the provisions of venues.6) shall go to the fa
10、ctory of Party B to check booth producing progress and quality.Party Bs responsibilities:1) party b is responsible for the preliminary design, factory production, the production of art (not including photo, prints and other graphic image design), material transportation, field construction, electric
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 展会特装 搭建 合同 英文 样本 The construction contract of special booth
链接地址:https://www.taowenge.com/p-13898785.html
限制150内