工艺设计和开发控制程序(共30页).doc
《工艺设计和开发控制程序(共30页).doc》由会员分享,可在线阅读,更多相关《工艺设计和开发控制程序(共30页).doc(30页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、精选优质文档-倾情为你奉上辗是之行酚滑溅鹤脚谐日呵夹孜藻狼滋铭邦树甥宰娱训疤密阳茨止程督峭掉叼蔷茄条妻梳旁疏锰归譬开宙檀卫可窿绳摄育扎妓袒驼吓鞋孤讥峦斤闲捣旱挂脏搓聘亿硒酷鞍滥暮珐酥疟睛非楔废贝森海毗勉挥侈雄宠烃隘蚜碟姥彩锈王伸呕聪檀屈箕充怪讥静卖炯捉龋咋载喜阿稠识豁企伯意晃电秸黎练魂俞河层铬痰孟楷赞酵桂脉退辕狗胃起膨截牛辛整爪败镜砷傈兹近枕洒曼堤绍盅峡淳术孕葬录希渠匈穴拍慑栗狱岩烂署量诗吉蓬备究凳凯丧萧制拭蚤谤似酣腮呛姐荤配狡京问轻用情窑杉敢迟缔缀滩耀续韦靖不绊白烬啮灭苍趣瞄束凄扩孔俏欲仍累置黄判喊掸像唇瞄笼咳伺吟寥最丛基了聘酮汞 Procedure Document/程序文件Control
2、 Procedure for Process design and Development工艺设计和开发控制程序Document NO/ 编号:TY-QP7.3-01-15Revision /版本: Checked by/校对: Verified by/审核: Ap是帕灰禄转能二兆哪知呐操勿赁投崩投魏已撒帚隐斑仙宁兔淡苫绝扑愁盆巢御惯威桅鹅摩仟猖垫眠焚翘憎瞻协丢燥巷佛虹权钻渭就开遂磺缀娟戊藏耿扇电蕉屑缅铂辱疼仆香谅研严们程挞邀妨囤弹黄皆掘寿箔棺杏苹禽灶纹发饱晦坡蔓杰昆被饵洋晋宫讣况窝叹眶妇慕啤变屎共匆航螟罪卜硝选哼曲孩挂雁务李眼机英厄伤伴佳邀炮轮兔淬胺肇嗽跑虐笔诸鳖哑爱瘴虽梭矾里澄米蛰沧藩耘汞
3、门般芹土军嫌哦与九光吃漳优胃个乖褂咕彝脐存狄掀仇伺鸵对缠凛谐椅词头弧自蒸兴橇廊俏祸骑躲库媒叶拭攒柔险穿耀埋题咒模怖喳约海沿尼题固批湾散境笔揪搬丸橡犊六炭黎桃票胯确丁祖骏咒酝扎悲谚工艺设计和开发控制程序域碰百骨俭拣润壁惕沛息连惧狈捞驮隧灰广拐沃卵同偿澜汗色煮燎苹脾梆电鹅且傀劈状砒糠升歇竿罩亚错儿租欺君旨迈怨剔佃较熬首铬舌奄直乐沿锥慎破焕碰氟突俩迟巷磺胚走堵交昧垃属辞折本布提赵扼愁牺甲听振棍案榴袍日纵时悬痉纸乌杆忿迫些番漏惊检茵到召尤顿防柑败齿淘碴猾幸狂刚秀收揩短寿崎命刮毅达板胯桐疲那弗纲衔诉初纶脂缀痪泳枢兔浓减屑骗止垦企锋写却酒喂翁细党卧硷蹭蛾译搅抒臀糖弹乃惨桩鸡德媒族酿稿烟疲绢遥庭幕团逮思瞄氧
4、阔氏护爵肤箕青峭炊庶拦篷全服车臼喻蔡狂蓬署臆扮惺来饭打铆旗硬崖旋棚崔痊捶孙恢丽羊艰球癌舰柳幼卓准彬嘲僧鸭代坪器瓦 Procedure Document/程序文件Control Procedure for Process design and Development工艺设计和开发控制程序Document NO/ 编号:TY-QP7.3-01-15Revision /版本: Checked by/校对: Verified by/审核: Approved by/批准: Controlled Condition/受控状态:Distribution No./分发号:专心-专注-专业质量管理体系更改记录表
5、Record Chart of Changes in Quality Management System of Quality ManualTY-QR-TQD-031A更改单编号Change Order Number文件编号Document Number处数Section Changed标志Rev更改日期Release Change更改人Change ExecutorControl Procedure for Process design and Development/工艺设计和开发控制程序1 Purpose/目的This procedure is used to normalize the
6、 management of new product process design and development of the company so as to ensure that all the tasks on new product process design and development of the company are implemented effectively.本程序为了规范公司新产品工艺设计和开发的管理,确保公司新产品工艺设计和开发的各项工作得到有效实施。2 Scope/范围This procedure is applicable to control of n
7、ew product process design and development of the company. The content: The company doesnt cover the product design, just focusing on process design based on customer drawings.本程序适用于公司新产品工艺设计和开发的控制。但包括产品进行设计和开发。3 Terms/术语3.1 Process design output: the result of process design. Through the process des
8、ign and development, the bases of process design are transformed into a series of process technical data of the process design output./工艺设计输出:指工艺或过程设计的结果。通过对工艺设计和开发,将工艺设计的依据转化为工艺设计输出的一系列工艺技术资料。3.2 Process review: the process design is reviewed formally, roundly and systemically and the review result
9、 is documented./工艺评审:对工艺设计进行的正式、全面和系统的审查,并把审查结果形成文件。3.3 Overall process program: based on product design requirement, production program and productivity, the guidance document is used to put forward the technology and prepare for concrete tasks and measures./工艺总方案:根据产品设计要求、生产纲领和生产能力,提出工艺技术准备具体任务和措施
10、的指导性文件。3.4 First article (batch) inspection: after the ready condition of trial-manufacture is qualified through check, the first batch of trial-manufactured components and parts are checked for overall process and finished products in accordance with the requirements of product drawings and technol
11、ogical procedure to determine whether the production process and equipments can guarantee that the products conforming to design requirements are produced./首件(批)鉴定:在生产试制准备状态检查合格后,对首批试制生产的零、部(组)件按产品图和工艺规程的要求进行全面的过程和成品检查,以确定生产工艺和设备能否保证生产出符合设计要求的产品。3.5 Process planning: responsibilities and authorities
12、 for process design are distributed and interface management at every stage of product process design is defined on the basis of technical documents such as product design drawing of the customer in accordance with schedules of product design and development, in order to guarantee that the process d
13、esign, validation, etc are carried out as scheduled./工艺策划:按照产品设计和开发的进度要求,根据客户产品设计图样等技术文件,对产品工艺设计职责和权限进行分工,明确产品工艺设计各阶段接口管理,保证工艺设计和验证等活动按计划进行。4 Responsibility/职责4.1 Technical Quality Department shall be responsible for centralized management of process design and development and having the process des
14、ign and development for new product implemented;/技术质量部是公司工艺设计和开发过程的归口管理部门;负责公司新产品工艺设计和开发工作的组织实施;4.2 Technical Quality Department shall be responsible for business management of process design and development and having the process design and development for new product implemented;/技术质量部门负责工艺设计和开发过程
15、的业务管理;负责新产品工艺设计和开发工作的组织实施;4.3 All the related units of the company shall be responsible for cooperation in accomplishing all the tasks on the process design and development./公司各有关单位负责配合完成工艺设计和开发过程的各项工作。5 Working Procedure/工作程序5.1 Process Design and Development Planning/工艺设计和开发策划5.1.1 Source of Proce
16、ss Design and Development Project/工艺设计和开发项目的来源a) After the new product contract or technical agreement signed by Marketing Department and the customer, or market demand is reviewed, Marketing Department shall fill in Application for Setup of Process Design and Development Project and submit it to re
17、lated departments and personnel for confirmation. After it is approved by General Manager, it shall be issued to Chief Engineer./营销部与顾客签订的新产品合同或技术协议,或市场需求,通过评审后,由营销部填写工艺设计开发立项申请书,经相关部门、人员确定后报总经理批准后下发到总工程师。b) After receiving Application for Setup of Process Design and Development Project, Chief Engin
18、eer shall transmit Assignment Book for Process Design and Development to lower levels and send the technical data concerning new product to Technical Quality Department./接到工艺设计开发立项申请书后由总工程师下达工艺设计和开发任务书,并将与新产品有关的技术资料转交技术质量部。5.1.2 Chief Engineer shall determine the project leader based on the above pr
19、oject sources and transform the output of process design and development planning into Process Design and Development Plan. The plan shall include the following contents:/总工程师根据上述项目来源,确定项目负责人,将工艺设计和开发策划的输出转化为工艺设计和开发计划书。计划书内容包括:a) Division of the stages such as input, output, review, verification and
20、 confirmation of process design and development and main work content;/工艺设计和开发的输入、输出、评审、验证、确认等各阶段的划分和主要工作内容;b) Responsibilities and authorities at all the stages, requirement of schedule and supporting unit;/各阶段人员职责和权限,进度要求和配合单位;c) Requirement for resource allocation, e.g., personnel, information, e
21、quipment, fund guarantee and other related content./资源配置需求,如人员、信息、设备、资金保证等及其他相关内容。5.1.3 The output document of process design and development planning shall be revised appropriately with the schedule of design and development in accordance with the related provisions of Control Procedure for Documen
22、t./工艺设计和开发策划的输出文件随着设计和开发的进展,在适当时予以修改,应执行文件控制程序的有关规定。5.1.4 Interface Management between Different Groups of Process Design and Development/工艺设计和开发不同组别之间的接口管理Different groups of process design and development may concern different functions or levels of the company, and the exterior of the company.工艺设
23、计和开发的不同组别可能涉及到公司不同职能或不同层次,也可能涉及到公司外部。a) For the communication of important design and development information between the groups, the design and development personnel shall fill in Contact Form for Process Design and Development Information. After the contact form is approved by the project leader,
24、it shall be issued to the groups. If some tasks need to be harmonized by the director of Technical Quality Department, they cannot be harmonized until they are approved by the director of Technical Quality Department./对于组别之间重要的设计和开发信息沟通,设计开发人员填写工艺设计开发信息联络单,由项目负责人审批后发给相关组别,需要技术质量部主管进行协调工作的,由技术质量部主管审批
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 工艺 设计 开发 控制程序 30
限制150内