1、精选优质文档-倾情为你奉上系泊试验大纲目 录 CONTENT .#1bRWpZ 1 General principles 总则 5QKRI)XpZ 2 Mooring trial系泊试验 =!L 2.1 The inspection of vessel main dimensions, loadline and draft mark船舶主尺度、载重线和吃水标志的检验 ?0 HR(N(z! 2.2 The testing and examination of doors, windows, manhole covers, hatches. 2XzF k_6H 门、窗、人孔盖、舱口盖的检验和试验
2、_L8Mpx*E 2.3 The inspection of all acceptance check location 所有验收处所的检验 T:be 9 5!, 2.4 The inspection of life facilities生活设施的检验 ThjUiuWe 2.5 The inspection of lay out of anchor and windlass锚布置与锚机的检验 4 U3CJ 2.6 The inspection and examination of mooring equipment、towing gear系泊与拖曳设备的检验与试验 Dq:R 2.7 The i
3、nspection of rudder and steering gear 舵设备及操舵装置的检验 8w03H 0 2.8 The inspection and reception of life saving appliance救生设备的检验与接收 ybaL4% 2.9 The inspection and examination of signal equipment信号设备的检验与试验 xt? 3_?1 2.10 The inspection of fire-protection device防火设备的检验 C%2t 2.11 The inspection of all hull fit
4、tings所有船体属具的检验 VI(RT-S6 3 Sea trial航行试验 JoEV=L 3.1 Speed trial航速试验 Gtj ( 3.2 Accelerated test加速试验 6BtfQ) 3.3 Main engine endurance test主机耐久性试验 ksc z8X 3.4 turning test迥转试验 +1c 船东的试验 CS 1 General principles总则 uusY,Dt/9 1.1. This vessel is a seagoing ship which is classed BV. Therefore, in addition to
5、 meet the requirement of dock and sea trial program, also shall meet the requirement of the relevant examination and sea trial regulations of BV. This sea trial program can be carried out if approved by BV and shipowner. 6?wGs( 本船为入级BV之海船,因此,除满足本系泊与航行试验大纲外,也应满足BV有关检验和试航的规则,此试验大纲需经BV及船东认可方能执行。 F 6au
6、1.2. This program includes the inspection and confirmation of general performance、general arrangement and ships equipment of this ship after construction, As for the test and confirmation of machinery and electrical equipment of this vessel please see additional document. 4Rrw8Bw 本大纲包括了检验和认定本船建造后的船舶
7、总体性能,船舶总体布置和船舶设备。至于本船之轮机与电气设备的试验和认可请参见另外的技术文件。 xy z;3 1.3. The mooring and sea trial of this vessel shall be carried out after completion of the vessel, to inspect the technical performance and construction quality of this vessel, and to provide technical data for navigation department、designing and
8、 survey department. eBYaq!t k 本船之系泊和航行试验在本船完工后进行,以检查船的技术性能与建造质量,并为用船部门、设计和检验部门提供所需之技术数据。 fM! 1.4. The shipyard is responsible for organizing the test and experiment work, shipowner and design center representative shall take part in these jobs, all the items need to be checked shall be checked in th
9、e presence of BV surveyor according to BV rules, qs8K jG 船厂负责组织检验与试验工作,船主和设计单位的代表应参加这些工作,检验BV规定的所有要检验的项目,应有BV之验船人员的参与。 RqX4ep5j 1.5. The items below shall be examined before mooring trial. 93Ci$#|St 1.5.2. All deck machinery and ships equipment must be provided with qualified certificate, The item n
10、eed to be inspected by class shall be provided with the classification society certificate. a,0o* (u$ 所有甲板机械与船舶设备必须提供质量合格证书,需经船检部门检验的项目需提供船级社证书。 +DV6oh 1.5.3. All kinds of test document (including tightness test) and approval document while the hull is construction and installation of equipment. ;uA
11、_gn! 在船体建造和设备安装期间的各种试验(包括密性试验)和认可文件。 7qv9xKy The inclining test shall be carried out according to the inclining test program before sea trial and the sea trial can only be carried out after eliminating the problems and defects which are found in inclining test and subject to prior approval by classi
12、fication society and shipowner. PEQvEruZ 航行试验前应依据“倾斜试验大纲”进行倾斜试验,并在消除了倾斜试验之中所发现之问题和缺陷并在船级社及船东同意之后才能进行航行试验。 W!Ctt 1.6. The accuracy of all kinds of test instrument use for mooring and sea trial shall be satisfied the relevant rules requirements, and subject to approval by classification society/shipow
13、ner. Qsg.9N3K 用作系泊与航行试验之各种测量仪器的精确性应满足有关规则要求,并征得船级社/船东认可。 , LPFb6o 1.7. All test data shall be recorded by shipyard during mooring and sea trial, relevant technical document and test record shall be filled, and shall be submitted to the classification society and shipowner. The sample of record form
14、shall be submitted for approval. r0$9c *ej o6 在系泊与航行试验期间,船厂应记录所有测量数据,并填写有关技术文件和试验记录,并提交给船级社和船主。记录表格的样本应提交批准。 FLnAN; 1.8. The inspection item below shall have its own corresponding test report, including the instruction/operation and test result/tester /date/shipyard, classification and witness by sh
15、ipowner. Ew,wNR 以下每一试验项目均要有其相应的试验报告,包括说明/操作和试验结果/试验人员/日期/船厂、船级社和船东见证。 Ehgn?6 N$_ 2 Mooring Test系泊试验 I;mcSJ|j 2.1 Examination of the principal dimensions of vessel, loadline and draft mark /t6uI 船舶主尺度、载重线和吃水标志的检验 ,#4+&4b 2.2 Inspection and examination of door、window、manhole cover、hatch cover. VKfHN_m
16、* 检查和试验门、窗、人孔盖以及舱口盖 Q+js2?7 2.2.1 Inspect the convenience and reliability of all kinds of doors、windows、manhole covers、hatch .Inspect the closing of louver of funnel. W oG 检查各种门、窗、人孔盖、烟囱百叶窗、舱口盖操作的便利性和可靠性。检测烟囱百叶窗的闭合性。2.2.2 The doors, windows, manhole covers and hatch covers situated at following loca
17、tion shall carried out tightness test. Inspect its integrity、appearance and manoeuvrability of open & closing operation before trial, The surface of examination location shall be keep clean and dry. &k k Please read “whole ship doors and windows cover arrangement plan ” and “tightness test manual” b
18、efore trial. &MLhCekY 以下位置之门、窗、人孔盖和舱口盖应进行密性试验。在试验前,应检查它们之完整性,外观以及开闭操作的灵活性,检查部位之表面和焊接处应保持清洁、干燥。试验时请参阅全船门窗盖布置图、密性试验手册。 x=|AFI a The structure tightness test and all oiltight and watertight manhole covers tightness test shall be proceeding at the same time. ,r,;2,;6nd 所有油密与水密人孔盖应在船体结构密性试验期间一并进行。 /eSby
19、b The hose test shall be carried out for hatch cover on exposed main deck.(including hatch covers of engine room )在主甲板露天位置的舱口盖进行冲水试验(包括机舱逃生口舱口盖)。 1ucUnNkcV c. All weather tight doors shall be carried out hose test. j|8Vyqd 对所有的风雨密门进行冲水试验。 .ihneg d. The scuttles and square windows of deck house and w
20、heelhouse shall be carried out hose test. RwHXn1 甲板室与驾驶室之舷窗与四方窗周边进行冲水试验。 67LFV1tvy e. Inspect the convenience of fire door (both side), the door and the door frame whether accord well with each other. An effectiveness test shall be carried out to all self closed fire doors. Iq.0E9_ 检查每个防火门在其两面开启的方便性
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 船舶 系泊 试验 大纲
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内