CQC管理体系认证合同英文(共8页).doc
《CQC管理体系认证合同英文(共8页).doc》由会员分享,可在线阅读,更多相关《CQC管理体系认证合同英文(共8页).doc(8页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、精选优质文档-倾情为你奉上MANAGEMENT SYSTEM CERTIFICATION CONTRACT Ref. No.Party AAddressTelephone FaxLegal RepresentativeContact PersonParty B: CHINA QUALITY CERTIFICATION CENTRE Address:Section 9, No.188, Nansihuan (the South Fourth Ring Road) Xilu (West Road), Beijing , P.R.ChinaTelephoneFaxLegal Representati
2、ve: Contact PersonAddressTelephoneFaxGENERAL TERMS AND CONDITIONSArticle 1 Part A and Part B hereby undertake to, in pursuance of relevant provisions of the Contract Law of the Peoples Republic of China, sign, observe and to be bound by the general terms and conditions agreed hereunder through equit
3、able consultations in respect of application field by Part A with Part B for conformance and effect audit of Party As by Part B.r QUALITY MANAGEMENT SYSTEMr ENVIRONMENTAL MANAGEMENT SYSTEM r OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEMr HACCP SYSTEMr QS-9000 QUALITY MANAGEMENT SYSTEMr ISO9001+KB
4、A Article 2 The scope of audit agreed hereunder is _Above information may be adjusted according to on-site audit.Article 3 The audit criteria agreed upon by both parties hereto is determined on the basis of:r ISO9001: r ISO14001: r GB/T28001- r INTERNATIONAL FOOD CODE Codex General Principle of Food
5、 Hygiene CAC/RCP1-1969, Rev.3 (1997);Guidelines for the Application of the HACCP System Anex to CAC/RCP1-1969, Rev 3(1997).r QS-9000: the 3rd edition/ISO900 :94CQC will carry out certification work on the basis of Requirement of Quality Management System/QS-9000: the 3rd edition appendix BImplementa
6、tion Criteria of Quality Management System Certification Agency.r Part As system manual and relevant documents on the basis of the above standardsr Relevant laws and regulationsr Other Article 4 Audit fees are determined on the basis of fee structure approved by relevant authorities. Full descriptio
7、n of such fees is provided in the certification confirmed by both parties and attached hereto. Travel costs incurred by or connection with audit work shall be borne by Party A.Article 5 Fees are settled by:1. First audit/re-audit: settlement before audit , settlement after audit .2. Surveillance fee
8、s should be settled before each surveillance audit.3. Specific fees see “Quotation of Management System Certification”.Article 6 Rights and Duties of Party A:1. Abide by the relevant regulations of certification from beginning to end;2. Establish and implement adequately the related system;3. At lea
9、st 3-month implementation of the system, be permitted to audit practically;4. Submit to Party B relevant management system manual and documents;5. Effect payment of fees in pursuance of terms and conditions hereof;6. Provide Party B with working conditions required by audit;7. Submit to Party B accu
10、rate and adequate information and record;8. Obtain certificate if qualified;9. Use certificate and logo thereof in a appropriate manner;10. Not damage Party As reputation in the period of propagating the certification result;11. At the request of Party B, submit to Party B all received records of co
11、mplains and records of corrective action adopted in accordance with the requirements of system standards or other standardized documents. On the receipt of a complain, Party A should establish, and where appropriate report on, the cause of the nonconformity, including (or predisposing) factors withi
12、n Party As system.12. Maintain the integrity and consistency of its management system after obtaining certificates; 13. At the request of Management System Standards or laws and regulations, receive the witness audit implemented by the related organizations and submit to them the needed information
13、and report.14. Within the term of validity of certificate, receive and surveillance of Party B; at the same time pay for the surveillance fees according to the related regulations.Article 7 Rights and Duties of Party B are to:1. Strictly abide by the laws and regulations regarding management system
14、certification, and supply Party A with certification service objectively and justly;2. Where applicable, provide, in favor of Party A, qualification document and/or related public documents;3. Assign qualified audit team to carry out audit work after signing contract;4. Issue without delay documents
15、 review report; 5. Provide without delay audit plan to Party A, carry out such plan within timeframe defined therein and issue thereafter audit report;6. Observe objectiveness and confidentiality declaration;7. Where applicable, issue without delay certificate in favor of Party A, and publish the na
16、me of Party A in a mass medium;8. Carry out regular supervision and re-audit & certificate work in respect of Party As system after the issuance in favor of Party A.Article 8 Audit work may subject to Party As consent, be suspended if a major nonconformity that will suffice to disqualify Party A for
17、 recommendation for certification registration is identified in the process of audit, and will be resumed if Party A has taken effective corrective actions in respect of such item of nonconformity, provided always that related fees or expenses shall be borne by party A.Article 9 If Party A requests
18、to terminate an audit work prior to the completion thereof, Party A shall be bound to pay in full the audit fees, unless such request has been made on reliance of Party Bs liability.Article 10 After the follow-up verification, if the audit team of Party B finds that system of Party A is in complianc
19、e with relevant norms and qualified for certification, it shall recommend Party A for certification registration within 30 days from such finding and shall, upon qualification assessment and approval therefore, issue Certificate in favor of Party A. Party B shall publish, on a regular basis, the nam
20、e of Party A in a mass medium.Article 11 Should Party A have any objection in respect of the audit workaudit processes, audit behavior, or audit result, it may find solution through consultation with the Audit Centers, CQC, or the Governing Broad of CQC within 30 days after the on-site audit. And ma
21、y, if still not satisfied with the decision of said organizations, file a petition for reconsideration with the China National Board for Certifiers.Article 12 Should any of the following circumstances occur within the term of validity of certificate, Party A shall complete the application for additi
22、onal audit, change, suspension or withdraw of relevant certificate and related formalities:a) Significant change of the system, including organizational structure, basic establishment and operational procedure;b) The certificated organization goes into liquidation or ownership shifts, including inco
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CQC 管理体系 认证 合同 英文
限制150内