1、精选优质文档-倾情为你奉上項 目Item程序書Procedure文件編號Doc. No,DM010版 次Version00G文件名稱Doc. Name工程變更管制程序Engineering Change Control Procedure制訂日期Date2007/3/12Mar. 12, 2007頁 次Page1/4流程 Flow活動 Activities權責單位Authorized & Responsible Unit參考文件Reference Doc.表單記錄Form Record製作單會簽Manufacturing unit Countersigns初審First-check需求(ECR
2、/ECN)Demand ECR/ECN退原申請單位Return to Original Applying UnitNG執行變更Execute ChangeNG確認樣品SOP/SIP更新Confirm sample and update SOP/SIPECN會簽Countersign ECN核准/Approve發行/Release1.需求部門提出申請(填寫ECR)及書面文件經部門主管簽核後,送至工程部及業務部初審. Units apply for the demanding (fill in ECR) and send all written documents to dept. supervi
3、sor for signing and checking and to Engineering Dept. & Sales Dept. for first-check.2.如客人需求變更,由業務部ECN直接會簽If customer requests us to change engineering, Sales Dept. will directly countersign ECN.1.業務,工程確認OK後,由業務會簽客人,如客人同意,申請單位轉正式ECN由工程文管統一臨時編號;Sales Dept. will countersign Customer after engineering c
4、hange is confirmed by Sales Dept. and RD; applying unit will change it into the formal ECN and submit to DCC of RD for temporarily assigning uniform numbers.2.審核圖面或相關資料.Check the drawings or related references.1. 製作通知單會簽相關單位,提供費用,時間,庫存(庫存給客戶確認處理方式)Related units make and countersign notification for
5、providing cost, time and stock. (Customer decide how to handle stocks) 修模制作通知單會簽業務部,生管部,模具部或模具保養組Sales, Production Control, Tooling Dept and Mold Maintenance Team will countersign mold repair notification2.會簽完後由副總經理核准Vice General Manager should approve the mold repair notification after being counte
6、rsigned.1.產品執行設變Execute engineering change for products.2,需重新修模或試模的,需由相關部門反映給工程部,重新由業務下單啟動系統.Related departments should reflect those products needed to be re-repaired and mold testing to RD; Sales dept will re-draw list to start system.3.文件修訂,其中變動SOP/SIP由相關單位提供給工程確認OK后,工程發NOTES通知於相關單位正式更新執行.Revisio
7、n of documents and changed parts of SOP/SIP will be provided to RD for confirmation and sending out NOTES to related units for formally updating and executing SOP/SIP.1.ECN會簽相關部門Related departments countersign ECN.2.生管提供庫存(包括各製程及供應商庫存數量)統一數量填至ECN備注橍並簽名Production Control provides uniform quantity of
8、stocks including all manufacturing stages and vendors and fills into the notes column of ECN and sign.3,相關單位填寫ECN執行附表或完成時間Related unit fills in ECN execution attachment form and completion time.1.工程部主管/或代理人核准.RD supervisor or his agent approves ECN.1. 工程文管以電子檔存放於(勤誠ECN專區/包括BOM),協力廠由生管部執行轉發.DCC in RD
9、 keeps it as electronic file in Chenbro ECN dedicated area including BOM and Production Control transmit it to Assistant Factory.2.設變圖面,承認書發行在Notes專區,協力應商由資材部執行轉發.Distribute change drawing and specification approval sheet to Notes dedicated areas, and transmit to Assistant Factory by Asset Controlle
10、r Section.3.一般ECN會簽到發行總時間為1.5天內.緊急ECN會簽到發行總時間為1天內.Generally, from countersigning to releasing, it costs 1.5 days for normal ECN and 1 day for urgent ECN.相關部門Related Dept.客戶Customer客戶Customer業務部Sales Dept.工程部RD工程部RD相關部門Related Dept.相關部門Related Dept.工程部RD製造部生技Technician of Manufacturing Dept.品保部QC Dep
11、t工程部RD相關部門Related Dept.工程部RD工程部RD相關部門Related Dept.客人變更資料Customer change materials設變圖面Drawing changeECN設變圖面Drawing changeECN執行附表ECN execution attached formECRECN1.ECN/圖面ECN Drawing2.BOM/圖面BOM Drawing3.ECR/圖面ECR Drawing制作通知單Manufacture Notification檢測表Checking ListSOP/SIPECN設變圖面Design Change Drawing項 目
12、Item程序書Procedure文件編號Doc. No,DM010版 次Version00G文件名稱Doc. Name工程變更管制程序Engineering Change Control Procedure制訂日期Date2007/3/12Mar. 12, 2007頁 次Page2/4流程 Flow活動 Activities權責單位Authorized & Responsible Unit參考文件Reference Doc.表單記錄Form Record清數區分隔離Count& Separate變更型態Change Type料品用完Use up all materials清數區分隔離Count
13、& Separate自然切換ChangeNaturally立即報廢Scrap Instantly舊品修正Modify Old Product清查庫存.提報數量Check Storage & Report Amount制程修正Modify Process 開單報廢Make Scrap ping ListECN標簽區分Mark & Separate ECN products樣品確認Confirm sample入ECN庫位Place products in ECN warehouseECN料品使用提報ECN Material Using and Proposal區分出貨Separate outgoi
14、ng products結案/End case1.依客戶需求,制程改善,設計變更等之需求,如未經客戶同意不得任意變更.Modify procedure and change design according to clients requirement, and cant randomly change without customers permission.2.相關部門依工程部發行 ECN之變更型態對產品進行處理.並填寫ECN實際執行表,工程專案將依此CHECK.結案後由文管中心存檔發行.Related departments handle products per change type
15、in ECN published by Engineering Dept and fill in ECN actual execution form; Project team in RD should check products and close case per it; DCC will file and issue ECN documents after being closed.1. 由品保對設變前產品進行區分標示,倉庫進行運作,貼ECN標簽區分,倉管負責提報產品數量(包括各製程庫存數及供應商之庫存數)Product before design changed is marked
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 工程 变更 管制 程序
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内