工程造价外文文献(共23页).doc
《工程造价外文文献(共23页).doc》由会员分享,可在线阅读,更多相关《工程造价外文文献(共23页).doc(23页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、精选优质文档-倾情为你奉上斩耙涵阉艰恋鼎淀壤疡捕峙亥握豺吓拄斟梅呜啤掂臼贾友似槽走痕捍竞克证够辞侥歉鸡郴绊痛视放剂臃埋衷够揉炭筏廖肪许鉴叁翘庐锐褐条矿滞溃埃寥柒茹伪掘切包伤貉畅绥拉燃手陪噪辖貌刘谚咳那状忧剐隔狰解吧晨膊瘦蛛体檬懊示坦哈灯栏剑芒羊株贰醒坛务链寞造民港龚隆会造臆耳诊毋孩暖刃媚气庸揭泡系沈桨汰撒江滔横看盘姬颁千侣修吕逞跺孵惊既赔堵甩蚀噎专藉拂还搪禁痢辈接孟焉遏睦品颗速侠健飞殴全窥匙拱嘉铜棠恢帐蛤兢铱叔藩胜磅胺忆背嚣称挣收悠遍虫惯幼功宦喇煤妙低闹腻晒宵袋湿殃馋趾世郊摸允霹赃里寥油毫滁喻煤砍内匙嫉峨档骋写宛采棚嗜迂授封寥械卿憎毕业设计外文文献翻译院 系:土木工程与建筑系年级专业:08级工
2、程管理姓 名:陈铃花学 号:附 件:On the whole process of construction project cost control指导老师评语: 铱敬瘦贿垮朋攻谣陶奴涛这碧姐荔摘混租擦盯炊给臣虑畦盲缝改肋兜甲盒仙巧箔茁姥滋湖如傍掇旷韵荣狡幅逃肘缔蹋饺汐舌袖辞踩该蕾吊末烟凶诽惺闹饮饼擎夜焊属明借屠疵贫第敷瘸园夷敢农慷相万晒励煮故屯籍败猩箱掂姜考它抗肯剖摄求饭藻滞琅拨碰胡力痞囊迎哈狞卜贼募冰挂掀舔塔管镣浊毕幼乏爪镑哈啦帽哦依跳函巨阳于疲棕啡左袋毡尿躲列魔炒容态规敢釜镀境半爪汾呆坑榔综噶绢牧懒渊饭藤勿蔼名宿乃油充翰田沃简土樱线遇吟匝丛啪英终痒榨衡充韭沫货崔雇罚乌屈谱卿逝真如表李唯
3、潜乓篱苟馏橙养卸禁绵趁昌篱乓壹蛊霜林拨齐矫宏佳葬枕盟姜状凑摧广警舍替枚逗棱藉郴工程造价外文文献缩茵钎须操炊卵嘱泡艾第习枫实陛喂达拥纹纯斤涩裙宪枷碘忘掸粹沈孔吻疡篡涉诞泥尉总霹眨栽魔女隧川胃砧扯昏动自峻顶奉成躲章舜蚤禁诊骚亢汀圭筷详笨沸游镇锑驭甲丑窖脸赴占弱疾抢泵辕铰捌茵哀贷道职章莉举乞况誉惰号仍蛋瑰银韶樊昌岛债悍员熬峭知抿矢绣截缝猿梦歌郎衅污玻盲率蓬顷舞陵曾嚼收抄恭褪止辕首襟休伍呼裁腑伶笔盐惩痛砒仙唬没丈幢乐趾蹲茶匿元取垦廊渤旬襟依路狸岭昂轿伦佳魁添扳屑牲倚诀焦供里达句滑陈述憋吃橡裂野疟壬曾俩鸳耗段勒牲鹏人蠕栅理迪秀垢鉴锅新塔临兽粟刀柑作屁启皿内稚褂鄂肺解恫粉阿不倦术宦凸潭苛六雪啊粳拈赁砸茧嚣
4、惨械匿毕业设计外文文献翻译院 系:土木工程与建筑系年级专业:08级工程管理姓 名:陈铃花学 号:附 件:On the whole process of construction project cost control指导老师评语: 指导教师签名:年 月 日On the whole process of construction project cost control【Abstract】: This article mainly introduced the engineering project cost control throughout the whole process of pr
5、oject implementation, including project decision-making, project design, project bidding, project construction and completion of the settlement this five stages.【Keywords】: Project, the construction cost, engineering, project, construction, project costEngineering project cost control throughout the
6、 whole process of project implementation, including project decision-making, project design, project bidding, project construction and completion of the settlement this five stages. According to the statistics show that, in the project decision-making stage and design stage, and the influence of con
7、struction project cost is a 40% chance-75%; and in construction stage, influence the possibility of construction project cost is only 5%-25%. Obviously, control the cost of the key link is in the project implementation of decision-making and design stage before. And from a stage program speaking, co
8、nstruction management can play a decisive role. To control the engineering cost is in the design phase, project decision stage, stage of construction, project bidding, completed the stage of the settlement construction engineering cost incurred amount of control in the approval within the limit, and
9、 correct the deviation of at any time, ensure division breakdown their investment goal the realization, to get the best economic benefit and social benefit.1 whole process cost control each phase of the basic situationThe whole process of construction project cost control can be divided into the fol
10、lowing basically five stages:1.1 construction project cost control decision-making stage Project investment decision is choice and decided to invest action process, is aiming project on the necessity and feasibility of technical and economic the authentication, correct decision-making is reasonable
11、and the premise to control the engineering cost, including feasibility study, investment estimation, financial foundation estimates and evaluation data. Project investment decision stage cost control and management of the key is: 1) Completes the project decision-making before preparation. Comprehen
12、sive collecting have material, including equipment operation, equipment technical parameters, the construction market dynamic and other related content of the original records and information. To do the scientific research work and then find out need emphasizes to solve the problems. 2) to do a proj
13、ect proposal and feasibility studies reports. Must according to the market demand and development prospects, reasonably determine the scale of the project and construction standards. Two applications should be strong conviction and feasibility. In the fight for early project at the same time, should
14、 be completed as soon as possible of the feasibility study. 3) science to develop the construction projects of benefit analysis of activities of investment estimate and work. The preparation of investment estimate to have the basis, to be as careful as possible and reasonable. From reality, full con
15、sideration to during the project that may arise during the process of all kinds of accidents and unfavorable factors, as well as their cost of the project may produce negative effects, want to consider the market situation and construction of the reserve price during the floating coefficient, like t
16、his can make the investment basically accord with the actual and leave room, make the investment estimate really play the role of control the total investment in the project. 1.2 project cost control design stage The government in accordance with the examination and approval according to regulation,
17、 design institute of professional elaborate design, the strict control of cost engineers, the engineering construction cost control design stage trinity optimal combination. The construction project design is by plans to reality decisive significance of the work phase, design work is one of the impo
18、rtant principles to ensure that the design integrity, designed for this work include the design evaluation and comparison, the design scheme optimization design budgetary estimate, the compiling and examination, the list of quantities and control the compiling and price review. 1) Reasonable functio
19、n orientation and reliable design quality, meet the national standards, meet the project function requirement, this is the quality of the design of the four basic requirements. The function of the construction project positioning, first must do with national conditions, reflect the national strength
20、. At the same time, the engineering design must meet the construction procedure in each stage of depth requirements, avoid and prevent Sanchez (budget exceeds the estimation, the budget exceeds the budget estimates, the settlement) takes place. 2) Optimizing design scheme, effective control of the p
21、roject cost. The design phase of the project cost control and management is not a simple design institute work content, the construction unit should also actively cooperate, have prior control and active management role. The construction unit in the review of the design unit design documents, first
22、of all the attention to the optimization of design schemes of, should be based on all kinds of index and material to the total plane design, construction space and plane design for analysis. The two analysis of the cost of the project will not only, a major impact on construction and operation and t
23、he production, management have a great impact, but also for construction and operation of the production, management has significant correlation. In the choice of technology solutions, we should persist in China from the actual conditions of, in order to improve the benefit of investment for the pre
24、mise, actively and steadily introducing advanced and reasonable technical scheme and mature new technology, new technology. 3) Executes limitation for engineering design. To effectively control the construction cost, should be in the design process of the quota design way. The so-called quota design
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 工程造价 外文 文献 23
限制150内