Xx石化工程大型储罐施工质量计划CONSTRUCTION QUALITY PROCEDURE.doc
《Xx石化工程大型储罐施工质量计划CONSTRUCTION QUALITY PROCEDURE.doc》由会员分享,可在线阅读,更多相关《Xx石化工程大型储罐施工质量计划CONSTRUCTION QUALITY PROCEDURE.doc(102页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、【精品文档】如有侵权,请联系网站删除,仅供学习与交流Xx石化工程大型储罐施工质量计划CONSTRUCTION QUALITY PROCEDURE.精品文档.Xx石化工程大型储罐施工质量计划CONSTRUCTION QUALITY PROCEDURE目录CONSTRUCTION QUALITY PROCEDURE11. 总则General42. 编制依据 Basis of the plan:53.项目概况 eneral introduction74.质量目标 Quality target85.项目施工质量管理组织机构Organization and management system of co
2、nstruction quality85.1施工质量管理小组网络构架:Organizational structure of construction quality management group:95.2施工质量管理小组网络构架说明:Instructions to organizational structure of construction quality management group:136.施工质量检查和控制工作的开展 Workflow chart of Construction Quality Assurance System136.1质量保证体系工作流程图:Workflo
3、w chart of Construction Quality Assurance System:136.2项目施工质量检查和控制工作的开展Instructions to works of Construction Quality management group of the project:166.3质量检查和控制项目Quality examination and control project186.3.1储罐地基与基础质量检验项目Storage tank basis and foundation quality examination project186.3.2材料验收检验项目mat
4、erial checking and accepting196.3.3预制质量检验项目Quality examination project of prefabricate196.3.4安装质量检验项目Installation quality examination206.3.5焊接质量检验项目Weld quality examination216.3.6储罐总体质量检验项目Storage tank collectivity quality examination216.3.7质量检验项目分级Class of quality control items216.3.8焊缝无损检测welding
5、line scatheless examination236.4储罐施工质量控制点一览表Storage tank construction quality control points246.5项目施工质量管理小组对质量持续改进的措施Project construction quality manage groups measure about quality improvement continuance417施工准备阶段的质量控制和管理Quality control and management at all construction stages447.1图纸会审阶段The stage
6、of drawings joint checkup447.2进场机具、检具的准备和检验Preparation and inspection of incoming machines, tools, and inspection instruments457.3施工人员的教育和培训Education and training for construction forces477.4施工人员资质检查Construction forces qualification examination488. 施工阶段的质量控制Quality control of construction period488.
7、1施工阶段的技术交底technical specifications of construction period488.2材料的进场验收和发放Incoming, acceptance and put out of Material498.3土建专业施工阶段质量检验Construction stage of civil-work and quality inspection518.4储罐预制施工阶段质量检验The quality inspection during the fabrication period568.5 储罐安装施工阶段质量检验Inspection of installatio
8、n qualityxx8.5.1储罐安装一般要求The general requirement of the tank installationxx8.5.2储罐基础复验检查Re-test and inspection of the tank foundationxx8.5.3储罐底板的下料及铺设质量检验Quality inspection blanking and laying of storage-tank bottom boards658.5.4罐壁组装质量检验Quality inspection assembling of rank wall678.5.5储罐倒装法安装的质量检查和控制
9、Quality inspection and control of reversed installation for storage tank728.5.6储罐固定顶和内浮盘的安装质量检验Inspection of tank domes and floating plate738.5.7附件安装质量检验Inspection of accessory installation quality748.6焊接质量检验Inspection of welding quality758.7总体尺寸检验The general dimension inspection798.7.1罐壁组装焊接质量The i
10、nstallation and welding quality of the wall plate798.7.2罐底和罐顶(浮盘)组装焊接质量The tank bottom and dome (floating plate ) installation and welding quality798.8罐体水压试验Hydraulic test of tank shell808.9罐体防腐专业施工阶段质量检验Tank shell anticorrosion quality inspection848.10罐体保温专业施工阶段质量检验Tank shell insulation quality ins
11、pection859.竣工验收阶段的质量控制Quality control of completion, check and acceptance period8610.附录88施工质量计划CONSTRUCTION QUALITY PROCEDURE1. 总则General本工程技术要求高,质量要求严格,为了满足业主XX的要求和满足工程施工技术标准的要求,向XX提供质量优良的产品和服务,确保xx罐区的施工质量,使业主XX满意,要建立一套完整的质量保证体系和质量管理制度,自始至终的按全优工程项目管理,实施目标管理。为达到质量目标,特制订本施工质量计划。This project has high
12、technique and strict quality request, in order to offer XX hi-quality products and services, to ensure construction quality of xx tank farms and to satisfy the owner XX and the construction technical standard, we build a set of system about the quality assure and quality manage to meet the construct
13、ion quality aim that we will manage all the way according to the best project, actualize the target manage. We hereby work out the construction quality plan. 该计划坚持“质量第一,预防为主”的方针和“计划、执行、检查、处理”循环工作方法,不断改进过程控制。该施工质量控制和管理计划将覆盖整个施工过程,作为对外质量保证和对内质量控制的依据。质量保证体系各级责任人员必须到岗到位,深入施工现场和施工班组,履行本专业职责,严格把关,保证质量体系运转
14、正常。The plan insists on the policy about “ Quality First, Prevention Priority” and the circle working method, improving the process control. The plan shall assure quality external and control quality internal base on the quality assurance and quality manage covers the overall construction process. Al
15、l persons responsible for Quality Assurance System at all levels must keep in the designated posts, penetrate into the construction field and construction parties to fulfill their professional responsibilities and strictly guarantee the quality so as to ensure normal operation of quality system在需要时,
16、本施工质量计划将作必要的修改和重新提交,以与项目的义务和要求保持一致。The plan shall be modified and resubmitted when necessary so as to keep in line with the obligations and requirements of the project.2. 编制依据 Basis of the plan: 2.1承包合同文件 “Contract No.:2.2 XX石化项目xx罐区项目里程碑Milestone for works of intermedium & petroleum tank farms in X
17、X Petrochemicals Project2.3设计技术资料 Requirements on construction drawings, technologies and quality specified by 2.13ASME boiler and pressure vessel code:Section V - Nondestructive examination ASME V Section IX - Qualification standard for welding and brazing procedures, welders, brazers, and welding
18、and brazing operators ASME IXVertical steel welded storage tanks with butt welded shells for the petroleum industry BS 26542.14国内现行的各专业施工验收标准、规范:Relevant professional standards and regulations on construction acceptance:l 建设工程项目管理规范 GB/T503262001“Construction project manage criteria GB/T503262001”l
19、石油化工钢储罐地基处理技术规范 SH/T3083-1997“Technical criteria on foundation treatment for petrochemical steel storage tank SH/T3083-1997”l 石油化工钢储罐地基与基础施工及验收规范 SH3528-93“Criteria on construction and acceptance of groundwork and foundation for petrochemical steel storage tank SH3528-93”l 建筑地基设计规范 GB 50007l 砼结构设计规范
20、 GB 50010l 基础工程的施工与验收规范 GB 202l 硅酸盐水泥与普通硅酸盐水泥的质量标准 GB 175l 钢筋混凝土热扎螺纹钢筋标准 GB 1499l 混凝土结构的施工与验收规范 GB 50204l 混凝土应用骨料的质量标准与检验方法 JGJ 53l 石油化工立式圆筒形钢制储罐施工工艺标准 SH353093“Criteria on construction technics of petrochemical vertical cylindrical steel-welded storage tank SH3530-93”l 石油化工立式圆筒形钢制焊接储罐设计规范 SH3046-92
21、“Criteria on design of petrochemical vertical cylindrical steel-welded storage tank SH3046-92”l 立式圆筒形钢制焊接油罐施工及验收规范 GBJ128-90“Criteria on construction and acceptance of vertical cylindrical steel-welded petroleum tank GBJ128-90”l 工业管道施工及验收规范 GB50235-97“Criteria on industry conduit construction and ac
22、ceptance GB50235-97”l 现场设备、工业管道焊接工程施工及验收规范 GB50236-1998 “Criteria on construction and acceptance of scene equipment, industry conduit steel-welded GB50235-97”l 石油化工设备和管道隔热技术规范 SH30102000“Technical criteria on petrochemical processing equipment and pipeline insulation SH30102000”l 石油化工设备和管道涂料防腐蚀技术规程
23、SH30221999“Technical regulations on anticorrosion of petrochemical processing equipment and pipeline coating SH30221999”l 石油化工工程建设交工技术文件规定 SH35032001Regulation of Technical Turnover Document for Construction of Petrochemical Industry Project, SH35032001l 工程测量规范 GB500261993“Construction Survey and Me
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- Xx石化工程大型储罐施工质量计划CONSTRUCTION QUALITY PROCEDURE Xx 石化 工程 大型 施工 质量 计划 CONSTRUCTION
链接地址:https://www.taowenge.com/p-15042611.html
限制150内