[四川]城市道路路网连接桥隧工程施工组织设计(含机电安装、2013)_yg(1).doc
《[四川]城市道路路网连接桥隧工程施工组织设计(含机电安装、2013)_yg(1).doc》由会员分享,可在线阅读,更多相关《[四川]城市道路路网连接桥隧工程施工组织设计(含机电安装、2013)_yg(1).doc(60页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d section 2, coal mines, mine should be the preparat
2、ion of the medium-and long-term planning and control water (a) plans, and their implementation. A, year b, quarters c, 3, coal mines, mine should be (a) for water education and training to ensure employees have the necessary knowledge of water control, improving water control work skills and the abi
3、lity to resist water damage. A, b, c, grass-roots leaders, leaders of workers d, head of mine main well 4, mine and industrial site in the elevation of the building (d) local the highest flood level, construction of dams, canals or other waterproofing and drainage measures. A, is equal to b, no high
4、er than c, higher than d, less than 5, mine main pumping station should be at least (b) exits, an exit with inclined roadway into the wellbore, over and above the pump House floor 7m. A, 1 b, 2 c, 3 d, 4 6 mining area water Chamber, the effective capacity should be able to hold (b) normal inflow in
5、mining area. A, 2H b, 4H c, 6h d, 8h 7, short sump capacity should be maintained at a total capacity of (b) above. A, 40% b, 50% c, 60% d, 70% 8, in the year before the rainy season, should complete overhaul (a), and all pumps and backup pumps were 1 joint tests and found the problem and deal with i
6、t. A, 1 b, 2 c, 3 d, 4-9, complex and very complex hydrogeological conditions of mine on the ground could not be identified when mine hydrogeological condition and water filling factors should be persisted, (d) the principle of strengthening the work of survey water. A, digging after the first b, c
7、mining, after the first had the suspects will find d, excavations will be 10, penetrating exploration of goaf water, karstic water and drilling water, water drilling group layout, and in the roadway in front of the horizontal plane and vertical plane fan-shaped. Drill hole locations to meet horizont
8、al distance (d) as the standard, thick coal seam in the bore hole offset must not exceed 1.5M. A, 1M b, 1.5M c, 2m d, 3M 11, seam, prohibition in principle survey water pressure above (c) MPa water filling fault water, aquifer water and karstic water. If needed, you can waterproof wall and gate wall
9、 within survey water. A, b 0.5, 0.8 c, 1 d, 1.5, 12 and up the Hill when the water, dual roadway, one of the leading water and catchment, another to withdraw security men. Double room every (b) 1 m excavation contact Lane, and retaining walls. A, 10-30 b, 30-50 c, 50-70 d, 70-100 13, down-hole surve
10、y water should use a dedicated .XX南路接XX路桥隧工程 施工组织设计XX市XX南路接XX路桥隧工程施工组织设计 编制: 审核: 审批: 日期: 年 月 日Exam exam elements 1. find out the Central thesis of the article 2: identify types of arguments summarized the arguments of the main content 3. identification of the methods used in this paragraph or senten
11、ce, and its benefits. 4. (this paragraph) demonstration (process) what is it? 5. taste the benefits or effects of some words in a sentence. 6. for an article to add a fact or reasonable argument 7. do you agree with the author? Please explain the reasons. Argumentative is talking about as the main e
12、xpression of style. Through facts and reason, use logic to show that the authors views and attitudes to an issue and analysis on some phenomenon of insights and ideas. Three elements of argumentation elements: argument 1, argument: argument: authors opinions, views and ideas. (Right, distinct) Note:
13、 essays generally have only one argument, some around the central argument put forward several arguments, arguments are used to justify central argument. Find argument of method: a to see articles of title II to note argument in articles in the of location title reveals; b beginning proposed; c talk
14、 process in the sharp proposed; d end antibody; articles in the no proposed, needed readers himself antibody note distinguish topics and argument: topics is talk paper by to described of main content, and argument is author on by described of content by made of clear of judge of sentences. 2, lookin
15、g for or refine the method arguments: (a), see topic (b), start (c), end (four), middle (five), his induction an honest man is always suffer? in the dark old days of corruption, honest people suffer is not surprising, even commonplace. However, with the development and progress of society, honest ma
16、n suffer losses no longer become a common and normal phenomenon. Dishonest people may be proud of a moment, but ultimately the expense of them. As Lu Xun said leasing will also drown his own. Illusion and lies was uncovered the day liar He Yan people? some flattery, speculative hack who soon would b
17、e appreciated by a boss, but he would always ride it? the saying goes: clever to be wise dishonest people ultimately have to pay the price for his dishonesty. Overall, or doing an honest man does not suffer. This argument is an honest man does not lose exam: argument is that how come? Introduction o
18、f arguments: (1), straight to the central argument put forward. For example: on the backbone of the proposed opening of we Chinese are proud of (2), ask questions, add a central argument. For example: of the thinking and doing for dreams and death of the arguments. (3) cases, according to the experi
19、ence of a life point (4), draws from the story problems, arguments (5), the central argument put forward in some way. For instance, metaphor, comparing elements of the second: the arguments argument: the material to prove point. (Authentic) 1, argument type facts .- 1 - 目录第一章 编制说明- 1 -1编制说明- 1 -1.1编
20、制依据- 1 -1.2编制原则- 3 -1.3 指导思想- 3 -2施工总目标- 4 -2.1 工期目标- 4 -2.2 质量目标- 4 -2.3 安全生产目标- 4 -2.4 成本控制目标- 5 -2.5 文明施工目标- 5 -2.6 环境保护目标- 5 -2.7 施工人员健康目标- 5 -第二章 工程概况、重难点分析及其对策- 6 -1 线路概述及编制工程范围- 6 -1.1线路概述- 6 -1.2 编制工程范围- 6 -2 自然地理概况施工重难点分析及对策- 7 -2.1路基工程概况、施工重难点分析及对策- 7 -2.2.1路基基本设计参数- 7 -2.2.2路面基本设计参数- 8 -2
21、.2.3路基施工注意事项- 8 -2.2桥梁工程概况、施工重难点分析及对策- 10 -2.2.1地形地貌- 10 -2.2.2 气候和水文- 10 -2.2.3 地质构造及岩性- 11 -2.2.4 水文条件- 11 -2.2.5施工重难点与对策- 12 -2.3隧道工程概况、施工重难点分析及对策- 13 -2.3.1地形地貌- 13 -2.3.2气象- 13 -2.3.3地层岩性- 14 -2.3.4地质构造及地震- 16 -2.3.5水文地质条件- 17 -2.3.6施工重难点与对策- 19 -3隧道围岩分级- 27 -4隧道施工阶段风险评估、控制及管理- 28 -4.1风险类型及可能发生
22、风险的位置- 28 -5工程主要设计概况- 29 -5.1路基工程设计技术标准- 29 -5.2桥梁工程设计技术标准- 30 -5.3 隧道工程设计技术标准- 32 -第三章 施工总体部署及施工平面图- 43 -1施工准备- 43 -1.1开工前准备工作- 43 -1.1.1熟悉、审查施工图纸和有关设计资料- 44 -1.1.2原始资料的调查分析- 44 -1.1.3编制施工预算- 45 -1.1.4制定实施性施工组织设计- 45 -1.1.5控制点、水准点的布置与复测- 45 -1.1.6安全技术交底- 45 -1.1.7做好施工人员的上岗培训工作- 46 -2现场准备- 46 -3 施工资
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 四川 城市道路 路网 连接 工程施工 组织设计 机电 安装 2013 _yg
限制150内