高层建筑方案设计中结构体系的确定(共13页).doc
《高层建筑方案设计中结构体系的确定(共13页).doc》由会员分享,可在线阅读,更多相关《高层建筑方案设计中结构体系的确定(共13页).doc(13页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、精选优质文档-倾情为你奉上高层建筑方案设计中结构体系的确定Determination of structural system in scheme design of high-rise building.TxtThis paper contributes 101 from the little rain forestPdf documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the
2、local view.Design and engineering practice of high rise buildingDetermination of structural system in scheme design of high rise buildingShi Jianguang Hua Linlin(School of architecture and civil engineering, Xiamen University, Fujian, Xiamen )1 the method of determining the structural system of high
3、-rise buildingFor the whole construction project, the design phase is the construction of key projects in the whole process of investment control, the possibility of Figure 1 visible save construction cost in the design stage and design stage and decreased rapidly from 100% to the beginning of const
4、ruction has dropped to about 10%. Therefore, the key of 2 control construction cost lies in the stage of design preparation or project design.1Figure 1 the impact of the various stages of the design on the project investment. Data source: Xu Xiaofang: the cost control of the real estate development
5、should start from the planning and design stage, the contemporary construction, 1999.For high-rise buildings, according to the height of the structure, the choice of reasonable structural system and proper design, the plane shape, profile, 3 and total shape of the building are determined by the buil
6、ding in the preliminary design stage. The structural design is always involved after the architect has completed the architectural design plan in general, and proposed the structural scheme for the architectural scheme. In the architectural design stage, the change of the building shape and other fa
7、ctors will result in structural stress changes, especially for high-rise buildings, 4. As in building design, changed by the shape of wind, wind load and the building by force will change accordingly; change the building gravity load distribution characteristics of horizontal seismic action and buil
8、ding by force will cause the change of. If the building designers in graphic design and vertical design, not on the basis of the stress characteristics of the structure principle and relevant basic design technique, often make the structure engineer 5 structure system can effectively choose reasonab
9、le, due to structural instability problems. A structure design in architectural design scheme is put forward and backward to seek solutions on the structure, the structure of the division to diminish the role of the architect to seek after the architectural form in the structure of the 6 solution, m
10、ake the design completely in a subordinate position. At present, there are several methods to determine the structure system of high-rise buildings at home and abroad:1.1 expert discussionAccording to experts previously engaged in the rich design case, considering some important structural design pa
11、rameters, the intuition selected one or several may be a satisfactory solution scheme, then the experts will further scrutiny of these programs, so as to decide the satisfactory solution that cut. This method is more subjective, and it is difficult to take into account all the factors that affect th
12、e structure selection, and it is difficult to organize 7.1.2 primary selection based on specification and listFor example, the seismic design code of our country stipulates the structure type and maximum height of the reinforced concrete house (Table 1), 9 10 11 abroad. Fintel, Schueller, Taranath a
13、nd others also summarize and summarize the optimum number of layers for each type of structure (Table 2)8OneDesign and engineering practice of high rise buildingTable 1 maximum height applicable for cast-in-place reinforced concrete buildings (unit: m)Structure type, frame frame, seismic wall, seism
14、ic wall frame, core tube, middle barrel0180The fortification intensity is and 0Source: Code for seismic design of buildings. China Construction Industry Press, 2001 chronology, maximum height applicable for cast-in-place reinforced concrete (unit: m) 2Structure type, frame structure, frame shear wal
15、l structure, shear wall structure, concrete structure, frame tube structure, tube in tube structure, beam tube structure, frame structure, truss structure, steel structure, frame tube structure, truss tube structureLayers 03040, 80100Source: Fintel, Schueller, Taranath: 91011, 1985-1988 years.This m
16、ethod is intuitive, given the structure of maximum height or number, but when there are multiple alternative structure limit requirements meet, did not give the performance of the method of performance index system and evaluation standard and evaluation or assessment, still need designers using subj
17、ective judgment to optimize structure. Considering the building height or the number of layers, in fact, the height and the number of layers should control the structure selection at the same time, and ignore the other factors, such as function, site and so on.1.3 comprehensive fuzzy evaluation meth
18、odHe Guangqian China Academy of building research and put forward the suitable structural system of high-rise buildings are fuzzy comprehensive assessment method of calculation is divided into three items: 13 (1) according to the total number of buildings and building function, establish the relatio
19、nship matrix12. have(2) according to the function of the building, the option quantity A; A is the weighted vector of all kinds of buildings, which can be weighed and determined by the designer. When the lack of bias conditions, according to the following: the weighted vector of high-rise apartment
20、A= (1, 1, 0.3, 0.1, 0.2, 0) A= (1, 0.3 high-rise hotel, 1, 0.2, 0.1, 0) of high-rise office building A= (1, 0.2, 0.2, 1, 0.3, 0 A= (1) public buildings, 0.3, 0.2, 0.3, 1, 0.3) building A= (1, 0.3, 0.3, 0.3, 0.3, 1) (3) for fuzzy evaluation vector B = A - RN. Accordingly, the type of the structural s
21、ystem of the selected tall building can be judged. Although this method considers the building of the number and function of other factors, based on a certain calculation, but the weight value is random and subjective factors, but also failed to take into account the influence of structure selection
22、 and other venues.RN = s Mu a mu h Mu o Mu P mu? E?T1.4 concept designConceptual design was first proposed by Mr. Lin Tongyan, a famous Chinese American civil engineering expert. It mainly explained how to design the structural system at the design stage by using the whole method. The purpose of con
23、ceptual design is: in particular architectural space, environment and geographical stripsTwoUnder the design and engineering practice of high-rise building, the overall concept is taken into account of the overall structure of the structure, and the mechanical characteristics and relations between t
24、he structural master system and the basic subsystems are consciously brought into play and utilized. At the stage of architectural design,By using the concept of approximate calculation method, can quickly and effectively to structure conception, comparison and selection, this method has some errors
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 高层建筑 方案设计 结构 体系 的确 13
限制150内