大型储罐现场制作安装焊接施工方案Welding Construction Procedure中英对照.doc
《大型储罐现场制作安装焊接施工方案Welding Construction Procedure中英对照.doc》由会员分享,可在线阅读,更多相关《大型储罐现场制作安装焊接施工方案Welding Construction Procedure中英对照.doc(40页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、【精品文档】如有侵权,请联系网站删除,仅供学习与交流大型储罐现场制作安装焊接施工方案Welding Construction Procedure,中英对照.精品文档.大型储罐现场制作安装焊接施工方案Welding Construction Procedure 目 录Table of Contents1工程概况 Project Overview32编制依据 Preparation Basis33焊接质量保证措施 Welding Quality Assureance Measure44焊接方法及一般技术要求 Welding Methods and General Technical Require
2、ments55罐底的焊接 Welding of Tank Bottom166罐壁的焊接 Welding of Tank Shell237固定顶顶板的焊接 Welding of Fixed Roof268其他部位的焊接 Welding of Other Parts279焊接缺陷产生及其预防措施 Generation of Welding Defects and the Preventive Measures2710焊接检验 Inspection of Welding2811焊缝的修补 Repair of Welding Lines34412焊接验收 Examination and Accepta
3、nce of Welding3571 工程概况 Project Overview1.1 该项目是由xx有限公司(AA)合资建设的xx石化工程的IP罐区,位于xx。根据合同规定,该项目由CC设计、供货、现场制造及安装罐区xx个储罐。The project is the I&P tank area of Xx Petrochemical Project invested and constructed jointly by China National Offshore Oil Corp. and AA. It is located in xxe. CC shall offer the follo
4、wing services for the projects in accordance with the contract, including design, supply, site manufacture and installation of xx storage tanks. 1.2 主要工程实物量如下:The main construction load is as follows:储罐数量:xx个; Quantities of Storage Tanks: xx容积:28. 9万m3Volume: 289,000 m3钢材: Q235:3270吨; Steel: Q235: 3
5、270T; 16MnR:2870吨; 16MnR: 2870T; SS316、316L及SS304:430吨SS316、316L and SS304: 430T铝格顶:6个; Aluminum Dome: 6 GRE(玻璃钢)内浮盘:9个GRE (Glass Fiber Reinforced Plastic) Inner Floating Plate: 9 2 编制依据 Preparation Basis2.1 立式圆筒形钢制焊接油罐施工及验收规范 GB50128Construction and Acceptance Specifications of vertical Tube-shaped
6、 Steel Welded Oil Tank GB501282.2 石油化工立式圆筒形钢制焊接储罐设计规范 SH3046Design Specifications of Petrochemical Vertical Tube-shaped Steel Welded Storage Tank SH30462.3 承压设备无损检测 JB4730Nondestructive Testing of Pressure Vessels JB4730施工图Drawings issued for Construction3 焊接质量保证措施 Welding Quality Assurance Measures
7、3.1 按照质量保证体系程序的要求,对施工现场焊接工程实行全员、全过程、全方位的质量控制施工前,检查焊接工艺评定和焊工资格,保证焊接工艺评定覆盖率和焊工持证上岗率为100%。Check the welding procedure qualification and welders qualification in accordance with the quality assurance system procedures before the quality control construction is conducted on the welding works on the site,
8、 thus to ensure that the coverage rate of welding procedure qualification reaches 100% and all welders go to post with certificates. 3.2 施焊前应由工程技术人员对作业班组进行技术交底,做到人人心中有数。The engineering technicians should make a technical impartation to the working team before the welding work is conducted so that ev
9、ery one knows fairly well.3.3 焊接材料设专人负责烘干、保管、发放和回收,同时必须做好记录。焊材库必须保持干燥,相对湿度不得大于60%。Assign a person responsible for drying, keeping, extending and reclaiming the welding materials. He has to make proper record at the same time. The warehouses for welding materials has to be kept dry and its relative h
10、umidity may not exceed 60%.3.4 施焊前焊工应对照图纸检查要领用的焊材是否与母材相匹配。The welders shall check if the welding materials to be drawn match the base materials before the welding work is conducted.3.5 无损探伤工作由第三方实施。The NDE work should be conducted by the third party.3.6 认真做好焊接记录,焊道上应标出焊缝编号、焊工代号,并注明探伤部位,现场焊缝、图纸焊缝和探伤报
11、告(底片)的编号应一致。Make welding record carefully. Mark the welding line number, welder ID number and distinguish the parts for NDE on welding line, welding line number on site, welding line number on the drawing and the NDE report (film) should be the same number .3.7 施工中还应进行自检、 互检、加强专业检查,出现的焊缝质量问题,由焊接责任工程
12、师组织专业人员,准确地作出判断,及时制定改进措施。Take self-inspection and mutual inspection as well as strengthen specialized inspection during construction. If there appear quality problems in welding lines, the welding engineer responsible shall organize professionals to make accurate judgment and work out improvement me
13、asures promptly.3.8 建立焊工档案,实行动态管理,掌握每个焊工的焊接技能状况。对于焊接质量经常不合格的焊工,焊接质量员有权停止其焊接工作,下岗重新培训。Establish files of welders, practise dynamic management and understand the skills of each welder. If a welder does poor welding work frequently, the welding inspector has the right to suspend his qualification and t
14、o have him accept training off duty.3.9 对焊接质量实行奖惩制度,激励焊工提高焊接技能,重视焊接质量,提高焊接一次合格率。Implement the system of award and punishment on welding quality, encourage the welders to improve their skills and attach importance to welding quality, and enhance the rate of first-time acceptability.3.10 根据合同文件要求,为正确实
15、施及控制现场焊接计划,配备现场管理人员,包括现场焊接工程师和焊接质量控制工程师。 To carry out and control site welding plan correctly, arrange the site management as required by the contract documents, including site welding engineers and welding quality control engineers. 4 焊接方法及一般技术要求Welding Methods and General Technical Requirements4.1
16、 焊前准备Pre-welding Preparation4.1.1 储罐施焊前,根据图纸要求,按钢制压力容器焊接工艺评定和立式圆筒形钢制焊接油罐施工及验收规范 GB50128-2005的规定进行焊接工艺评定。According to the drawing requirement, make out the PQR in accordance with the standard and GBJ128-90 before welding the tanks.4.1.2 根据图纸要求和罐体母材选用合适的焊接工艺指导书和焊接工艺评定如下表:Selecting correct welding WPS
17、and PQR in accordance with the drawings and tank base material, as follow matrix: lue4.1.3 焊工培训和资质审查Training and Qualification Check of Welders4.1.3.1 参加本项工程施焊的焊工,必须经过现场考试,考试前应通知PMC,合格焊工应有一个唯一的ID号码。详见焊工培训及资格评定程序XXCC-0000-3024。All the welders for this project must be tested on the jobsite ,inform PMC
18、 in advance as a witness ,then ,each welder should have a unique ID number. See xxCC-0000-3024.4.1.3.2 由焊接工程师审查焊工资质,认定焊工合格、资格、焊工编号,并将合格证复印件交业主代表代表备案。The welding engineer shall check the qualification of welders by looking over the certificate of quality and qualification and the welder number. The e
19、ngineer shall give the copies of quality certificate to AA/PMC for record.4.2 材料验收Examination and Acceptance of Materials4.2.1 材料工程师汇同驻地监理监理工程师对进场焊材进行验收,验收的项目包括:The material engineer shall examine the entry welding materials with the stationed 监理 supervision engineer. The items for examination and a
20、cceptance include:4.2.2 材料出厂合格证及材料质量证明书等证明文件。材质是否与设计图纸一致;The certificates, including the certificate of ex-factory quality and the certificate of material quality. Check if the materials are consistent with the design drawings.4.2.3 焊接材料(焊条、焊丝)应具有质量合格证明书。焊条质量合格证明书应包括熔敷金属的化学成分和机械性能;低氢型焊条还应包括熔敷金属的扩散氢含
21、量;The welding materials (welding rods and wire) shall bear appropriate certificate of quality. The certificate of welding rod should contain the chemical contents and mechanical performance of the melting materials. For hypo-hydrogen, it should also contain the contents of diffused hydrogen.4.2.4 焊材
22、入库须严格验收,对部分焊材外观进行抽查,是否存在生锈和药皮脱落现象,并作好标记;不得使用生锈和药皮脱落的焊材。Strictly check the welding materials to be put into storage. Make spot test on the appearance of partial welding materials and make proper record to check if there are rusts and if the coating breaks off. The welding materials with rust and brea
23、k-off may not be used.4.2.5 存放焊材的库房必须干燥通风,温度不得低于5,空气相对湿度不应高于60%,焊材存放位置距离地面和墙壁均不得少于300毫米,并严防受潮。The storehouses for welding materials have to be kept dry and ventilated. Its temperature may not be lower than 5 and the relative humidity may not exceed 60%. The welding materials should be kept 300 mm (o
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 大型储罐现场制作安装焊接施工方案Welding Construction Procedure,中英对照 大型 现场 制作 安装 焊接 施工 方案 Welding Procedure 中英对照
链接地址:https://www.taowenge.com/p-17211065.html
限制150内