水泥粉喷桩在地基处理中的应用(Application of cement powder spraying pile in foundation treatment).doc
《水泥粉喷桩在地基处理中的应用(Application of cement powder spraying pile in foundation treatment).doc》由会员分享,可在线阅读,更多相关《水泥粉喷桩在地基处理中的应用(Application of cement powder spraying pile in foundation treatment).doc(10页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、【精品文档】如有侵权,请联系网站删除,仅供学习与交流水泥粉喷桩在地基处理中的应用(Application of cement powder spraying pile in foundation treatment).精品文档.水泥粉喷桩在地基处理中的应用(Application of cement powder spraying pile in foundation treatment)Cement powder spray pile in foundation treatment using 2009-4-10 16:26:00 source: Global Online Channel:
2、 Structural EngineerAbstract: in civil engineering construction, often encountered bad geological conditions, it is necessary to deal with it, in order to meet the requirements of the structure of the foundation. There are many kinds of ground treatment methods 1, in which cement powder injection pi
3、le foundation has been widely used in recent years.Key words: cement injection pile; foundation; application1. Brief introduction of powder injection pilePile are learning the introduction of foreign high pressure jet grouting pile based on the innovation and development of the new type of pile, our
4、 own innovation and the development of complete sets of construction equipment and technology, advantages of this kind of pile can be improved: strengthening foundation, improve the bearing capacity of Foundation (2-3 times) and the stability of the water, no pollution to the environment, no noise,
5、no influence on adjacent buildings, equipment simple hydraulic control technology is easy to grasp, a pile of high efficiency (8m long piles, each pile machine can be completed every day 100), the cost of reinforcement is lower than the construction cost of pile pile for low 40%. 7 layer below and c
6、ohesive soil in groundwater or soil water content more than 25% sand, soft soil, silt soil in the shallow layer (deep 14m) pile reinforcement, but this is not applicable to miscellaneous (MSW) (the foundation bearing capacity is not uniform and soil) The water content is not less than 23%, otherwise
7、 it will cause the pile to be loose.2, engineering examples2.1, engineering works for the South yanchangbu Street commercial building, the foundation excavation part after the emergence of a large number of silt soil, soil depth and small thickness of 3.5 meters, the Geological Exploration Departmen
8、t of the construction site of the evaluation is: the venue for the soft site, belonging to three types of soil, ground water level of 0.9 meters below the surface.2.2, the foundation treatment requirements of the building features is the large upper load, and the soil is weak; basic form of resident
9、ial building drawings for raft foundation requirements 150kPa value for the bearing capacity of the foundation, not up to the value of 110kpa bearing standard test foundation construction site foundation bearing capacity; allowable settlement is less than 200mm; the owners required to reduce the cos
10、t of foundation treatment as much as possible.2.3, treatment options, Nanpu district on this kind of foundation often use prefabricated pile or cast-in-place pile, the survey unit also suggested the use of cast-in-place pile, the project department to make the foundation treatment scheme. After Part
11、y A, design, supervision, construction and management departments of the various arguments, research and comparison of the cost of the program shows that the final selection of our ground treatment program. It is applicable to reinforce the soil with cement injection pile. The mixing pile is more ec
12、onomical than the cast-in-place pile and has less influence on the surrounding environment.2.4. Design and design of composite foundation of powder injection pile, effective pile length L=5.5m, pile diameter 0.5m, plus solid chamber compressive strength is 2Mpa (through laboratory test to determine
13、cement mixing ratio is 15%). From the literature 1 (9.2.2-2), (9.2.2 - 3) calculate the bearing capacity of a single pile Rke=140KN; according to (9.2.2-1) formula can be calculated: the replacement rate of residential buildings m=0.3, according to the layout of the pile, the pile used in rectangula
14、r form.2.5, construction methods, spraying the use of curing agent for P.O32.5 ordinary portland cement, the use of domestic PH-5A type powder injection pile machine construction.(1) the site shall be leveled before the construction, the pile location shall be determined and numbered, and the assemb
15、ling frame shall be provided with a powder injection pile machine to check whether the main engine and other systems are working properly.(2) according to the layout plan of pile location, row number of pile and construction flow section, the moving mixing main machine aims at the design pile positi
16、on.(3) turn on the mixer after drilling into the 50cm, while drilling with the jet, pay attention to prevent the clogging of the powder injection hole, with the drill pipe drilling, reinforcement soil in situ stirring, chopping, drilling to the design depth, stop drilling.(4) when the drill pipe is
17、drilled to the design depth, it rotates backward, starts the cement transmitting device, raises the side of the drill pipe to stir, and the hoisting speed should be less than 1m/min, and the forced powder is stirred with the soil in situ. When the drill is raised to about 2m of the top of the pile,
18、the hoisting speed should be reduced. Lift to more than the design height of 30-50cm, turn off the cement transmission device, the rig rotates in situ, 1min, continue to ascend to the ground. Dusting Pile requires one go, without interruption, jet pressure control in 0.5-0.8N/MM2. in order to improv
19、e the strength of the pile and the bearing capacity, to avoid uneven mixing, then was stirred 1 times in the original pile length, the pile body is completed.2.6, to ensure the strength and integrity of the pile, the key lies in the amount of powder control and mixing is even, in view of this situat
20、ion, the construction of the following measures taken.(1) adopt one spray four stirs craft, its process is as follows. Measuring unreeling machine in place pile drilling in the end (jet) - boot - top (powder) - reverse lifting forward repuddling end - reversal (jet) - to enhance the displacement of
21、pile machine.(2) in the formal construction before choosing a certain number of pile test, to determine the pile construction technique for the parameters in the engineering geological conditions (pile machine drilling speed, stirring speed and enhance the jet mixing speed, scraping speed and spray
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 水泥粉喷桩在地基处理中的应用Application of cement powder spraying pile in foundation treatment 水泥 粉喷桩 地基 处理 中的 应用
链接地址:https://www.taowenge.com/p-17249184.html
限制150内