1、【精品文档】如有侵权,请联系网站删除,仅供学习与交流电站厂房土建工程量结算审查书MicrosoftWord文档.精品文档.土城河一级水电站发电厂房土建工程量结算审查计算书 (建筑1348.40以上,装修1343.03以上)(一)、砼 1、厂房构架C30 =164.04m3(1)V构架横梁=【0.15*0.5+(0.3+0.5)2*0.05+(1.1+0.9)2*0.3】*7.2*2=2.884*2=5.688 (2)V构架上部柱=【0.65*0.5*(1360.6-1355.5)+1/2*0.2*0.2*0.5】*2=1.668*2=3.336(3)V构架下部柱=【1*0.5*(1355.5-
2、1348.4)+1/2*(0.5+0.9)*0.4*0.5】*2=3.69*2=7.38V厂房构架=(5.688+3.336+7.38)*10=16.404*10=164.042、主厂房屋面梁C30 =28.123m3 (1)VWKL1(1)=0.37*0.65*(7.2-0.5*2)*2=1.491*2=2.982 (2)VWKL2(6)=0.37*0.55*(3.6+5.23*5-0.5*6)*2=5.444*2=10.888 (3)VL3、4(6)=0.25*0.55*(7.2+3.6+5.23*5-0.3*8)*3=4.751*3=14.253 V厂房屋面梁= 2.982+10.888
3、+14.253=28.123 3、主厂房屋面板C30 =50.779m3V厂房屋面板=(37.5-0.55-0.5*8)*(15.13-0.37-0.25*3)*0.11=50.779 4、行车梁C30 =27.36m3 V行车梁=(0.6*0.2+0.4*0.6)*(0.25*2+7.2+0.55+3.6+5.23*5)*2=0.36*38*2=27.365、主厂房圈梁C25 =41.957m3 V前后QL=0.37*0.4*(37.5-0.5*8-0.55)*2*2+0.24*0.4*(37.5-0.5*8-0.55)*2*2-(0.37+0.24)*0.4*4=31.183V两端QL=0
4、.37*0.25*(15.13-0.085*2-0.4)*4*2=10.774V主厂房QL=31.183+10.774=41.9576、中控室1348.4以下柱基C25 =9m3 V中控室柱基=1.5*1.5*0.5*8=1.125*8=97、中控室1348.4以下柱子C30 =3.968m3 V中控室柱子=0.4*0.5*(1348.4-0.4-0.5-1343.69)*4+0.4*0.5*(1348.4-0.4-0.5-1346.35)*4=0.762*4+0.23*4=3.968 8、中控室1348.4以下承重梁C30 =3.8m3 V横向承梁=0.25*0.4*(0.5+7.4-0.5
5、*2)*4=0.69*4=2.76V纵向承梁=0.25*0.4*(12-0.4*4)=1.04V中控室承梁=2.76+1.04=3.89、中控室1348.4以下楼面板C30 =16.455m3 V楼面板=0.2*【(0.37+7.4)*12-0.4*0.5*8-0.25*(7.77-0.5*2)*4-0.25(12-0.4*4)】=16.45510、中控室1348.4以上柱子C30 =7.28m3 V中控室柱子=0.4*0.5*(1353.6-1348.4)*7=1.04*7=7.28 11、中控室屋面梁C30 =9.172m3 V横向承梁=0.3*0.7*(7.4-0.13-0.5)*4=1
6、.422*4=5.688V纵向承梁=(0.3+0.37)*0.5*(12-0.4*4)=3.484V中控室屋面梁=5.688+3.484=9.17212、中控室屋面板C30 =15.455m3 V中控室屋面板=0.2*【(0.37+7.4)*12-0.5*0.4*8-(7.4-0.13-0.5)*0.3*4-(12-0.4*4)*0.3*2】=15.45513、中控室圈梁C25 =3.322m3 V中控室圈梁=0.24*0.4*(7.4-0.5+12-0.4*4)*2=3.32214、主厂房两端KFZ C25 =5.56m3 V主厂房KFZ=0.4*(0.5+0.63)*(1360.7-134
7、8.4)=5.56015、主厂房四角构造柱 C25 =5.976m3 V主房四角构造柱=0.37*0.37*【(1359.75-1348.4)*4-(1353.6-1348.4)】=1.554*4-0.712=5.504 V中控室前后=0.24*0.24*(1353.6-1348.4-0.7-0.4)*2=0.236*2=0.472 V厂房构造柱=5.504+0.472=5.976 16、厂房雨棚过梁 C25 =2.118m3 V安装场大门雨棚=(0.37*0.5+1.2*0.12)*4+1.2*0.12*1+0.1*0.06*(1.1*2+4.8)=1.502V中控室进门雨棚=(0.25*0
8、.3+1*0.1)*(1.5+0.25*2)+0.1*0.06*(1*2+1.8)=0.373 V厂房箱桥孔过梁=0.37*0.18*(1.5+0.25*2)=0.133V中控室370墙门过梁=0.37*0.12*(1+0.25*2)=0.067 V中控室240墙门过梁=0.24*0.12*(1+0.25*2)=0.043 V厂房雨棚过梁=1.502+0.373+0.133+0.067+0.043=2.11817、屋面女儿墙构造柱C25 =2.298m3V主厂房屋面GZ=0.24*0.24*(1361.65-1360.6)*11*2+0.24*0.24*(1361.65-1359.75)*3*
9、2=0.06048*22+0.10944*6=1.987V中控室屋面GZ=0.24*0.24*0.9*(2*2+2)=0.0518*6=0.311V屋面女儿墙GZ=1.987+0.311=2.29818、屋面女儿墙压顶C25 =7.197m3 V主房两端1360.61360.8压顶=0.15*0.37*(15.13-0.085*2-0.24*3)*2=0.7903*2=1.581V主房屋面压顶=0.15*0.3*【38.74-0.24*11+15.13-(0.185*2)+0.06*2+0.24*3)】*2=2.251*2=4.502V中控屋面压顶=0.15*0.3*【(7.4-0.24*2)
10、*2+12-0.3*2-0.24*2】=1.114V屋面女墙压顶=1.581+4.502+1.114=7.19719、厂房进厂厚200道路砼C20 =516.39m2S1段=19*(10.5+5.3)2+8.9*(4.5+5.3)2+10.5*(4.5+4.7)2+7.3*5.8=284.35S2段=30*(4.3+4.1+4.6+4.1)4=128.25S3段=13.9*(4.3+8.7+9.4)3=103.79S进厂道路=284.35+128.25+103.79=516.3920、厂房周边厚150道路砼C20 =294.92m2S1村民屋前=5*(3.8+5.5)2=23.25S2进山延道
11、=11*2.9=31.9S3厂房前面=30.1*3.5+26.1*(2.6+7.7)2=239.77S厂房周边道路=23.25+31.9+239.77=294.9221、厂房进厂路边防洪墙C20 =10.152m3V进厂路防洪墙=0.3*0.8*(21+21.3)=10.15222、35KV主变基础C15 =21.112m3V基础承梁=0.8*(0.7+0.06+0.54)*(2.75+1.7)*2+0.6*0.7*0.68=4.628*2+0.286=9.542V基础底板=6*6*0.2=7.2V基础边墙=0.25*0.76*(6+5.5)*2=4.37V35KV主变基础=9.542+7.2
12、+4.37=21.11223、250/38.5KV站变基础C15 =2.24m3V砾石灌浆基座=1.4*1.4*0.1=0.196V墩身=1*1*(2.1-0.1*2)=1.9V礅帽=1.2*1.2*0.1=0.144V250/38.5KV站变基础=0.196+1.9+0.144=2.2424、电缆沟底墙C15 =46.75m3S1断面=0.84*0.1+0.12*0.8*2=0.276S2断面=0.54*0.1+0.12*0.5*2=0.174S3断面=1.04*0.1+0.24*0.8*2=0.488S4断面=0.64*0.1+0.12*0.8*2=0.256S5断面=0.88*0.1+0
13、.24*0.75*2=0.448S6断面=0.64*0.1+0.35*0.12*2=0.148V主厂房=0.276*【29.75+(13.7-0.84)*2+3.3+2.4*2】=17.545V中控室=0.488*(6+5*3+2.3+2.75)=12.712V升压站S5=0.448*(26+3.62+5)=15.510V升压站S6=0.148*(3.5+2.3+1.5-0.66)=0.983V电缆沟底墙=17.545+12.712+15.51+0.983=46.75025、电缆沟盖板C25 =4.363m3SGB-1、2=0.654*0.05=0.0327SGB-3=0.694*0.05=0
14、.0347SGB-4=0.394*0.05=0.0197V主厂房=0.0347*63.57*0.99=2.184【上式中,0.99=500(500+5考虑盖板之间5mm空隙)系数,下同】V中控室=0.0327*26.05*0.99=0.843V升压站=0.0327*(34.62+6.64)*0.99=1.336V电缆沟盖板=2.184+0.843+1.336=4.36326、独立避雷针基础C15 =6.552m3 V避雷针=【1.82+1.52+(1.82*1.52)】*2.43=6.55227、ZW7-35断路器基础C15 =1.44m3V断路器=0.6*1.2*1*2(个)=0.72*2=
15、1.4428、35KV出线A型门架基础C25 =13.832m3V出线门架基础=3.8*1.3*1.4*2(个)=6.916*2=13.83229、35KV出线A型门架基础垫层C15 =1.2m3V出线架基础垫层=4*1.5*0.1*2(处)=0.6*2=1.230、隔离开关基础C25 =3m3V隔离开关基础=1*1*0.5*2(个)*3(组)=0.5*6=331、电压互感器避雷器基础C25 =2m3V电压互感器基础=1*1*0.5*2(个)*2(组)=0.5*4=232、升压站水泵基座及管座C15 =0.959m3V升压站水泵基座=1.85*1.4*0.2=0.518V升压站水泵管座=2.4
16、5*0.6*0.3=0.441V升压站水泵基管座=0.518+0.441=0.95933、升压站水泵雨棚地坪C15 =1.768m3V升压站泵棚地坪=6.8*2.6*0.1=1.76834、厂区卫生间基础砼C20 =2.94m3V基础=0.5*0.3*【(6+2.7)*2+2.7-0.5】=2.9435、厂区卫生间墙顶圈梁砼C25 =1.169m3V圈梁=0.24*0.28*(6+2.7)*2=1.16936、厂区卫生间地坪垫层砼C10 =2.916m3V室外=0.1*【1*(6.24+0.6*2)+0.6*(6.24+0.6*2+2.94*2)】=1.543V室内=0.1*(6-0.24-0
17、.18)*(2.7-0.24)=1.373V垫层=1.543+1.373=2.91637、厂区卫生间屋顶板砼C25 =5.401m3V屋面板=1/2*(0.13+0.18)*(6.24+0.6*2)*(0.6+2.94+1)=5.236V板凸边=0.1*0.07*(6.24+0.6*2-0.1+2.94+1+0.6-0.1)=0.165V屋顶板=5.236+0.165=5.40138、厂区卫生间门窗过梁砼C25 =0.178m3VM0921=0.06*0.24*1.4*2=0.040VC1209=0.12*0.24*1.7*2=0.098 VC0906=0.06*0.24*1.4*2=0.04
18、0V卫生间过梁=0.04+0.098+0.04=0.17839、厂区卫生间排水沟C10(图纸为浆砌石改砼计算)=1.04m3V排水沟=0.12*(0.52+0.25*2)*8.5=1.04040、厂区柴油发电机房屋顶板砼C25 =0.719m3V屋面板=0.1*3.24*(2.12+0.1)=0.71941、厂区柴油发电机房地面砼C10 =0.519m3V地面=0.1*(3-0.24)*(2-0.12)=0.51942、升压站事故油池垫层砼C10(无图估算)=0.563m3V垫层=0.08*(3+0.1*2)*(2+0.1*2)=0.56343、升压站事故油池池身砼C25 (无图估算)=6.4
19、74m3V池底墙=0.25*(3*2+3*2*2)+1.5*2*2)=6V池顶梁=0.2*0.3*2.5=0.15V池底墙=0.9*0.6*0.06*10=0.324V事故油池=6+0.15+0.324=6.474(二)、砖砌体M7.51、主厂房前后370、240墙1348.41360.05 =123.078m3V前墙=0.37*【(38.74-0.5*10-0.05-0.37*2)*(1360.6-1348.4-0.55-0.4*3.5)-4*0.5-4*4.15-1.5*2.1*30-1.8*2.1*3】-0.13*【(29.75-0.5*6)*(1358.6-1349.6-0.4*2)-
20、1.5*2.1*30-1.8*2.1*3】=64.164 V后墙=0.37*【(38.74-0.5*10-0.05-0.37*2)*(1360.6-1348.4-0.55-0.4*3.5)-1.5*2.1*33-1.8*2.1*6】-0.13*【(29.75-0.5*8-0.05)*(1358.6-1349.6-0.4*2)-1.5*2.1*33-1.8*2.1*6】=58.914V主厂房前后墙=64.164+58.914=123.0782、主厂房两侧370墙1348.4平均1360.55 =113.778m3V左墙=0.37*【(15.7-0.37*2-0.4)*(1360.7-1348.4
21、-0.25*4-0.15)-0.4*(1353.6-1348.4)*2-1*2-1.5*0.12-1.8*2.1-1.5*1-2*0.18-0.5*(12-0.4*4】=53.711V右墙=0.37*【(15.7-0.37*2-0.4)*(1360.7-1348.4-0.25*4-0.15)】=60.067 V主厂房两端墙=53.711+60.067=113.7783、中控室屋面下240墙 =19.37m3V前墙=0.24*【(7.4-0.5)*(1353.6-1348.4-0.7-0.4)-1.5*3-2*0.3-1.8*2.1】-0.236=4.422 V后墙=0.24*【(7.4-0.5