1、【精品文档】如有侵权,请联系网站删除,仅供学习与交流顶板梁安装英文PROCEDURE FOR CEILING GIRDERDOC.NO.: JPLProject: Jhajjar Thermal Power PlantREV. NO.:Client: JHAJJAR POWER LIMITEDPAGES: PROCEDURE FOR CEILING GIRDERCompiling: Date:Checking: Date:Approving: Date:Revision InformationNo.Approving Date1.2.3.1. Authorized basis1.1 Boile
2、r factory in Harbin construction drawing1.2Electric power construction and acceptance technical specification1.3Fire electricity construction quality examination and assess standard1.4The quality acceptance of the steel structure engineering construction norm(GB50205-2001)1.5Electric power construct
3、ion safety work regulations(first part: Thermal power plant)(DL5009.1-2002)1.6Electric power construction safety health and environment management work provision(2002 edition)1.7 Boiler profession construction organization design2. Project general situationJPL 2 660 MW power station #1, #2 boiler st
4、eel structure provided by Harbin boiler factory, adopt the structure which is separate from main workshop.Roof steel structure combine by ceiling girder, secondary beam and surface support, come into a rigid surface. For here adopt A,B,C,D,E four row ceiling girder, the length of span is 28m, A ceil
5、ing girder divide in three parts, E ceiling girder divide into two parts, the main ceiling girder of B、C、D have a big capacity、wideness span more, adopt the stop log style. 3. Main workloadOrdinal numberNameShape size: heightwidelengthWeightAmount1A-1 1048518105005875.35KG22A-2 698418004003410.5KG13
6、B upper 288603600120069363.5KG14B lower 288602000120051590.1KG15C upper 288803600160083182.9KG16C lower 288802000160063251KG17D upper 2914040001800129289.3KG18D lower 2914020001800101037.9 KG19E 13973350070020593.1KG24. Homework conditionThe main equipments delivered conditionCeiling girder arrived
7、in order remarkPreparation condation for erection area, force emerge:a. first class panel(420 V power supply)b. Oxygen, acetylenec. The spot fire fight device with temporary pipe lineEnvironment:a. The construction road is unimpeded.b. The site tool building, temporary deposit area for ceiling girde
8、r. And the deposit area neat and solid.Work period2010.05.232010.06.10ManpowerThe technique is 2 people, the safety be 2 people, the fire Han be 2 people, the electric welding be 4 people, install 30 people, heavy 12 people, operation 6 people, 2 electricians, the work be 8 people.MachineThe 350 t t
9、rack mourn(CC2200) one set, the 75 t tower mourn(FZQ1650) one set, electric welding machine 2 setWork toolelectric wrench, grinding machine, chain block, big hammer, pry stick, line to fall to, the kind be blunt, live wrench, spring coil to call, 50 sling, 22 sling etc.Measure toolSpirit level, leve
10、l instrument, theodolite, 100 m tape measure, 50 m tape measure, 2 m steel plate Chinese foot.etcMaterialWood the plank, square wood, hemp cordage, level rope, soft climb steps, from the lock machine, from lock machine rope, guard rope etc5. Homework project5.1Construction schemeAccording to each ce
11、iling girder weight and relevant data, calculation it and get result, upper parts of D、C、B ceiling girder weight is more, proceed to lifting it by 350 t track to mourn(CC2200) and 75 t the tower mourn(FZQ1650), and it will be lifted at furnace inside area. 3450t crawler crane (CC2200) adopt principa
12、l arm 72 meters and assistant arm 30 meters and 72 meters and assistant arm 42 meters SWSL work condition and arrange right side of furnace, the 75 t tower arrangement on the left side of furnace. Others ceil girder lift by 75t tower crane alone. 5.2 The construction work preface flow chartConstruct
13、ion preparationLineation on the furnace roof steel structureCeiling girder and secondary beam installTotal lineation for steel structure5.3 The construction prepare a work preface card Number:0011. Summarize: According to construction mission, before working well item an opening of each item prepara
14、tion work. 2. Operation methodSerial number and step nameMain homework method and operation requirementquality requirement1. Acquaint with drawingTotal worker who will attend construction should know the drawing & techno ledge well, explicit construction mission, quality standard. Know well about th
15、e machine work condition.2. Work tool preparationThe construction power supply connect line, instruments, measure, sling for lift in readiness1. Work tool, quantity intact, satisfy construction demand.2. Quantity through examination qualified and in the term of validity.3. open box and check materia
16、lAccording to the construction diagram paper and equipments detailed list in the factory house, to crest plank beam the equipments carry on a little bit pure, check, to existence of the equipments blemish carry on record, and basis blemish circumstance notice department concerned.The equipments exte
17、rnal appearance has no crack, heavy skin, severity rust eclipse, hurt, drill a hole hairless stab.4. Equipments size reexaminationAccording to check a mark request, check size & champers of each ceiling girder, and make a record. Alignment & marking for ceiling girder. 5. Preparation for liftingBefo
18、re erection, prepare well for the temporary facility.For example, soft ladder, level rope, life line & scaffold.5.4 Furnace roof steel structure lineation sequence card Number:0021. Summarize: According to the construction diagram paper and technique request, carry on a heat of steel gearing lineati
19、on.2. Operation method:serial number and step nameMain homework method and operation requirementquality requirement1. Find out base lineAccording to the zero level centerline as the pedestal, mark the centerline of B23 and k axis on the top of column.1. Install the lineation complete and lead each l
20、ongitudinal, horizontal center line to on the side.2. centerline of B23 and k axisAccording to the centerline of B23 and k axis, mark the centerline of support seat according to the distance support seat from of ceiling girder to above two axis,3.The reexamination sign pillar sizeRecheck the elevati
21、on deviation of the center deviation of and pillar crest of a plank beam, pillar crest, each sign a pillar an elevation is bad mutually.4.Reexamination each center diagonal line deviationRecheck a plank each of beam a center diagonal line deviation5.5 The ceiling girder install a work preface card N
22、umber:0031. Summarize: According to the construction diagram paper and technique request, and the homework project that front say, carry on a plank beam install.2.Operation method:Serial number and step nameMain homework method and operation requirement quality requirement1.H row crest the plank bea
23、m(A-1 and plank A-2 beam) installIt has three pieces of ceiling girder for H row. A-1 beam weight is 5.87t. A-2 beam weight is 3.4t. it is same measure for it lifting with normal beam. It can be lifted by 75t tower crane.1. Install process in, the Gou piece rub noodles have to dozen whet in addition