最新【测量专业与英文自我评价】 测量员自我评价.doc
《最新【测量专业与英文自我评价】 测量员自我评价.doc》由会员分享,可在线阅读,更多相关《最新【测量专业与英文自我评价】 测量员自我评价.doc(15页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、最新【测量专业与英文自我评价】 测量员自我评价当自己沉淀下来,窥探自己的内心,写下自己的自我评价,这样才可以不断进步。但是自我评价要怎么写呢?下面是小编为大家带来测量专业与英文自我评价,相信对你会有帮助的。测量专业与英文自我评价篇一Two weeks of measurement practice, I got a more comprehensive, systematic exercise, but also learned a lot of books can not learn the knowledge and skills.I remember the first week of
2、internship, we are very excited, a week down we feel very relaxed, rest for two days, began measuring practice, I followed the teacher to find the control point, then everyone is still excited, that the next Of the week should also be very easy, it is not. Although a bit lucky, but we all learn a lo
3、t, only a lot of ordinary "a lot of shopping" to learn things. I like to think, like the summary, so I summed up the following points:Grow up, to try to take some responsibility. We are born with a kind of inertia, whether individuals, or a team, if it is in an inert atmosphere, that she (
4、people) efficiency will not be high, but if everyone has a strong sense of responsibility, Take some responsibility, then the efficiency is not only improved, and the task will be completed very well.Infectivity is very important. In a team, in order to have a good atmosphere, the first person to pu
5、t forward the idea of thinking is very important, because later people can not help but have a herd mentality. If he (she) the idea is positive, then someone will actively think of some problems. On the contrary, the whole team into a negative atmosphere. Therefore, each of us should actively think
6、about the problem.Think a lot. What is the internship, internship is the theoretical knowledge into their own knowledge of the process. Internship process only a lot of thinking, in order to digest a lot of knowledge, but also extends a lot of previously unknown. Teamwork, through thick and thin. Th
7、is is a cliché, but in this practice have to mention, because it is everywhere, remember very clearly that many times we are on the measurement site for lunch; is that we all get up early, and then in the cold Whiz in the operation, everyone in the trembling; we are carrying the instrument to
8、uched the black home. All this bitter and happy, we all bear together. Through thick and thin, we are happy! Learn to compromise. Compromise is the highest art, in the process of cooperation, inevitably there will be some conflicts, then we need to calm down to think about the solution to the proble
9、m, everyone has done some concessions, then things are easy to solve.测量专业与英文自我评价篇二Blink of an eye 10 years have gone, we ushered in a new year. Summing up the work of the past year, from a personal point of view about the measurement of awareness.Quality is the life, quality is the fundamental guara
10、ntee for enterprise development. In the fierce competition in the construction market today, how to improve the construction quality management level is every enterprise managers must think about. Factors affecting the quality of construction in all aspects. From the engineering measurement point of
11、 view, analyze the work of measuring the pay-off to ensure and improve the quality of the construction of an important role, and simply how to strengthen the management of measurement work to improve the quality of construction.It is a very important technical work of municipal road engineering that
12、 the measuring and measuring line is an important technical work. It is inseparable from the whole process of construction, from the preparation before construction to the completion of the construction, to the final acceptance after construction. How to do a quick and good measurement of the line,
13、is a basic technical skills and test the basic requirements.Do the measurement before the commencement of the endBefore the start of the project, the survey and design units shall be responsible for on-site surveying and settlement according to the design documents, and the site standard point, cond
14、uctor piles and crossing point piles shall be clearly identified according to the design drawings. Within the measurement of signs, must take appropriate protection measures. On the measurement of the end, it is necessary to emphasize the protection of pile position, that is, in the design unit afte
15、r pile, should be timely use of brick piers or pouring cement pier and other methods to be protected, so as not to lose. These piles are generally farmland or residential areas, it is easy to be man-made destruction, and once destroyed, let the survey and design units to fill test, then delay the co
16、nstruction, but also increase the cost.Midline retest and edge loftCenter line measurement is based on the alignment measurement, the road center line plane position on the ground marked in detail. It is the difference with the alignment measurement is: alignment measurement, but the intersection of
17、 the road and the straight line segment of the necessary turning point marked out, and in the midline measurement, according to the intersection and the turning point with a series of stakes will road straight Segment and curve segments are specified in detail on the ground.The alignment survey is u
18、sually carried out by the survey and design units, and then the pile and measurement results to the construction side, the construction unit by the middle line and construction measurement.Subgrade construction should be fully restored before the center line, according to the restoration of the pile
19、 in the road and the relevant provisions of the roadbed side of the pile. On the midline re-measurement and edge lofting, should pay attention to the following points;One should pay attention to the distance between the intersection, the direction is consistent with the drawings; such as an engineer
20、ing project has several tenders, should pay attention to the center of the adjacent tenders are closed, midline measurements should be in-depth adjacent tenders 50 100 M; attention should be paid to the center of the structure such as bridge and culvert is closed; should pay attention to the relativ
21、e position of the building and other buildings and drawings are consistent. If you find problems in a timely manner to identify the reasons for the design unit.Second, retaining pile set. It is very important to set up pile protection pile in the middle of the road, but these piles are easy to be de
22、stroyed during the construction. Therefore, it is necessary to carry out the restoration and surveying work of the middle pile during the construction of the roadbed. In order to quickly and accurately restore the center pile in the original position, must be on the road before the construction of t
23、he main control point of the pile such as the intersection point, turning point, curve control points set up retaining pile. The so-called retaining pile, is outside the scope of the construction is not easy to be destroyed where some stakes set up.According to these pile, with simple methods (such
24、as the intersection point, range, etc.), you can quickly restore the original pile point.Set the pile should pay attention to the following aspects: in each straight section of the road, at least three control piles to set up retaining pile, so even if there is a control pile can not be restored, th
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 测量专业与英文自我评价 最新【测量专业与英文自我评价】 测量员自我评价 最新 测量 专业 英文 自我 评价 测量员
限制150内