大规模风电远距离接入电网的输电能力评估-刘杨.pdf





《大规模风电远距离接入电网的输电能力评估-刘杨.pdf》由会员分享,可在线阅读,更多相关《大规模风电远距离接入电网的输电能力评估-刘杨.pdf(52页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、国内图书分类号:TM711国际图书分类号:6213硕士学位论文学校代码:10079密级:公开大规模风电远距离接入电网的输电能力评估国家自然科学基金项目(50877027)资助硕士研究生:导 师:申请学位:学 科:专 业:所在学院:答辩日期:授予学位单位:刘杨周明教授工学硕士电气工程电力系统及其自动化电气与电子工程学院2013年3月5日华北电力大学Classified Index:TM71 1UDC:6213Thesis for the Master DegreeAssess ment on Total Transfer Capability of PowerSystems with Remot
2、ely Connected Large-Scale WindFarmsFunded by National Natural Science Foundation of China(50877027)Candidate:Supervisor:School:Date of Defence:Degree-Conferring-Institution:LiuYangProfZhou MingSchool of Electfical and ElectronicEngmeermgMarch 5,2013North China Electric Power University华北电力大学硕士学位论文原创
3、性声明本人郑重声明:此处所提交的硕士学位论文大规模风电远距离接入电网的输电能力评估,是本人在导师指导下,在华北电力大学攻读硕士学位期间独立进行研究工作所取得的成果。据本人所知,论文中除已注明部分外不包含他人已发表或撰写过的研究成果。对本文的研究工作做出重要贡献的个人和集体,均已在文中以明确方式注明。本声明的法律结果将完全由本人承担。作者签名: 1奢劢 日期:加l年弓月“日华北电力大学硕士学位论文使用授权书大规模风电远距离接入电网的输电能力评估系本人在华北电力大学攻读硕士学位期间在导师指导下完成的硕士学位论文。本论文的研究成果归华北电力大学所有,本论文的研究内容不得以其它单位的名义发表。本人完全
4、了解华北电力大学关于保存、使用学位论文的规定,同意学校保留并向国家有关部门或机构送交论文的复印件和电子版本,同意学校将学位论文的全部或部分内容编入有关数据库进行检索,允许论文被查阅和借阅,学校可以为存在馆际合作关系的兄弟高校用户提供文献传递服务和交换服务。本人授权华北电力大学,可以采用影印、缩印或扫描等复制手段保存、可以公布论文的全部或部分内容。本学位论文属于(请在以上相应方框内打“4“):保密口,在 年解密后适用本授权书不保密函作者签名: 知拘 日期:如I弓年弓月“日导师签每二子f飞 日期:hl,年多月二莎日华北电力大学硕士学位论文摘 要随着我国大型风电基地的建设加快,由于当地电网负荷有限,
5、经常有“窝电”现象发生。这一问题的可行解决方案是将该地区风电汇集后经远距离输电通道外送至电网负荷中心进行消化,由此产生大规模风电远距离接入电网的问题。大规模风电经远距离接入电网后,输电能力(TTC)的计算将与以往有所不同,体现在以下方面:1)由于风电机组相对较弱的无功电压调节能力,大规模风电远距离接入后对系统电压稳定影响较为突出,为保证TTC计算结果的可靠性需要考虑静态电压稳定约束条件,采用适合的计算方法;2)需要考虑系统中随机性因素如风速波动、元件故障等的影响,进行TTC概率评估;3)除采用常规交流输电外,还将采用直流输电进行大规模风电外送,需要提出相应的TTC计算方法。本文首先对普通异步风
6、电机组和双馈感应式风电机组两种主流机型分别采用相应简化功率模型,建立了风电场的功率模型。接着针对大规模风电经远距离接入后系统TTC计算需要考虑静态电压稳定约束的要求,采用基于连续潮流的方法,详细叙述了风电场接入电网后TTC计算的具体过程。随后考虑系统中随机性因素的影响,利用蒙特卡洛仿真方法进行TTC的概率评估,并选取了一系列评估指标对计算结果进行分析。最后在对风电经交流输电接入电网的研究基础上,结合风火打捆输送方式对风电经直流输电通道接入的TTC计算方法进行探索,建立了相应TTC计算模型。引入直流输电通道后,TTC计算需要解决交直流混合系统潮流计算问题,本文对常规连续潮流方法进行修改以实现交直
7、流系统TTC求解。实例分析所得结论可为系统规划及运行提供参考。关键词:风电场;最大输电能力;概率评估;直流输电华北电力大学硕士学位论文AbstractWith the construction of ChinaS large wind farm base speeding up,due to the limitedpower load of local grid,the wind power cant be digested effectivelyThe feasiblesolution is to send the wind power to the load center directly
8、 through transmigsion path,which leads to the issue of large-scale wind farms connected to the grid through longdistanceUnder the new issue,total transfer capacity(TTC)calculation will be differentwith before,which is reflected in the following aspects:1)due to the relatively weakability the wind ge
9、nerator has in reactive powervoltage control,large-scale wind poweraccess will influence the system vokage stability more prominently,therefore the staticvoltage stability constraints need to be considered in TTC calculation;2)random factorssuch as wind speed change and equipment failure need to he
10、considered in TTCprobabilistic assessment;3)besides the conventional AC path,the DC path will also beused in wind power delivery,the TTC calculation method through DC path need to bestudiedAt first the model of asynchronous wind generator and doubly-fed wind generator isused to set up the wind farm
11、power output modelIn consideration of voltage stabilityconstraints,the method based on continuous power flow is used to calculate TTC in thispaperAfter that to deal with the influence of random factors,the Monte Carlo simulationmethod is used to do TTC probabilistic assessment for system with wind f
12、armsAt last,the TTC calculation method for wind power conveyed through HVDC path is exploredCombined with the windfire bundling technology,a TTC calculation model is set up andmodified CPF algorithm is used to solve the modelThe results of case analysis Canprovide useful reference for system plannin
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 大规模 远距离 接入 电网 输电 能力 评估

限制150内