风电接入方案优化决策方法研究-刘思源.pdf
《风电接入方案优化决策方法研究-刘思源.pdf》由会员分享,可在线阅读,更多相关《风电接入方案优化决策方法研究-刘思源.pdf(59页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、国内图书分类号:TM743国际图书分类号:6213学校代码:10079密级:公开工学硕士学位论文风电接入方案优化决策方法研究硕士研究生:导 师:申请学位:学 科:专 业:所在学院:答辩日期:授予学位单位:刘思源张建华教授工学硕士电气工程电力系统及其自动化电气与电子工程学院2013年3月华北电力大学Classified Index:TM743UDC:62 13Thesis for the Master DegreeResearch on Optimization Decision Method forGridConn(!ction Scheme of、Mnd FarmonnectlonC11e
2、e 14 ar- WlndCandidate:Supervisor:Liu SiyuanProfZhang JianhuaAcademic Degree Applied for: Master of EngineeringSpeciality:School:Date of Defenee:Degree-Conferring-Institution:Electrical EngineeringSchool of Electrical and ElectronicEngineeringMarch,2013North China Electric Power University华北电力大学硕士学位
3、论文原创性声明本人郑重声明:此处所提交的硕士学位论文风电接入方案优化决策方法研究,是本人在导师指导下,在华北电力大学攻读硕士学位期间独立进行研究工作所取得的成果。据本人所知,论文中除已注明部分外不包含他人已发表或撰写过的研究成果。对本文的研究工作做出重要贡献的个人和集体,均已在文中以明确方式注明。本声明的法律结果将完全由本人承担。作者签名: 幽皿珈、 日期: 沙J;年弓月万日华北电力大学硕士学位论文使用授权书风电接入方案优化决策方法研究系本人在华北电力大学攻读硕士学位期间在导师指导下完成的硕士学位论文。本论文的研究成果归华北电力大学所有,本论文的研究内容不得以其它单位的名义发表。本人完全了解华
4、北电力大学关于保存、使用学位论文的规定,同意学校保留并向有关部门送交论文的复印件和电子版本,允许论文被查阅和借阅,学校可以为存在馆际合作关系的兄弟高校用户提供文献传递服务和交换服务。本人授权华北电力大学,可以采用影印、缩印或其他复制手段保存论文,可以公布论文的全部或部分内容。本学位论文属于(请在以上相应方框内打“”):保密D,在 年解密后适用本授权书不保密、作者签名: 幽逸、构、 日期:沙弓年弓月巧日名:动年 吼砧年专月订日华北电力大学硕士学位论文摘 要随着风力发电技术的快速发展和日益成熟,风电工程的建设规模不断扩大,风电接入对电网的影响日益凸显,且工程投资已呈现出额度大风险高的特点。在风电项
5、目规划设计阶段选择一个合理的接入方案可以保证电网的安全稳定运行,同时避免不合理的风电工程投资。因此,建立一套科学、完整的风电接入方案决策体系具有重要的现实意义。本文在调研风电场运行特性和输电网规划相关内容的基础上,依据指标体系的构建原则和实用方法,确立了风电接入方案决策指标体系。该体系全面考虑了风电并网对电力系统的影响,并兼顾工程建设投资成本,设立了最大接入容量、稳态潮流分布、暂态稳定性、可靠性、短路电流水平以及经济性等6个准则。同时,确定了12个决策指标。对每个指标分别进行必要性说明,并提出其算法和评价标准。针对经济性准则,将全寿命周期成本(LCC)技术应用于风电接入工程的总成本计算,建立了
6、计算模型。将风电项目的LCC总成本分为设备级成本、系统级成本以及社会环境成本三大部分。对备选方案的设计差别进行比较分析,并提出对差异项进行LCC估算的方法,最终为经济性指标提供了算法和评价依据。针对风电接入方案决策时准则繁多,将形成高阶判断矩阵的特点,在模糊层次分析法中引入相容矩阵,对算法进行改进。改进后的算法有效解决了传统基于三角模糊数的模糊层次分析法不易检验判断矩阵一致性的缺点,同时大大简化了高阶判断矩阵的计算过程。运用本文提出的决策指标体系和改进算法对实际风电接入项目进行综合决策。通过对各方案的指标值进行对比,并分析决策结果,证实了研究成果的合理性和适用性。关键词:风电接入;方案决策;指
7、标体系;全寿命周期;相容矩阵;模糊层次分析法华北电力大学硕士学位论文AbstractWith the rapid development of wind power technology,the construction scale ofwind power projects has been expanding,the impact of the grid-connection hasbecome increasingly prominent,and the investments have shown a large amount ofhigh-riskA reasonable plann
8、ing scheme Can ensure the safe and stable operation ofthe power system,while avoiding unreasonable wind power project investmentTherefore,establishing a scientific and complete decision-making system hasimportant practical significanceThrough researching the operating characteristics of wind farms a
9、nd relatedcontents of transmission grid planning,a decision-making index system isestablished based on the index system construction principles and practicalmethods in this articleThe impact of the wind farm integration and theinvestment cost of the proj ect construction are taken into consideration
10、Thesystem includes 6 criteria:maximum access capacity,steady-state flowdistribution,transient stability,reliability,short-circuit current 1evels andeconomy1 2 indicators are also determined,and the algorithms and evaluationcriteria for each indicator are described in detailsThe life cycle cost techn
11、ique is applied to wind power project,thecalculation model is establishedThe total cost is divided into equipment cost,system cost and social environmental costLCC estimation provides a calculationalgorithm for economy indicatorThe tolerance matrix is led into fuzzy analytical hierarchy process(AHP)
12、Theimproved fuzzy AHP effectively remedies the defects that it is difficult to inspect theconsistency of judgment matrix based on triangular fuzzy numbers and thecomputation process is simplifiedTaking a recent actual engineering project for example,the comprehensivedecision-making for gridconnectio