外文翻译-高桩码头加固方法分析(共12页).docx
《外文翻译-高桩码头加固方法分析(共12页).docx》由会员分享,可在线阅读,更多相关《外文翻译-高桩码头加固方法分析(共12页).docx(12页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、精选优质文档-倾情为你奉上外文资料及译文Analysis of Strengthening Method For High-Piled WharfsAbstract The main factors which cause the structural disease of high-piled wharfs, and the characteristic of strengthening methods are introduced and analysed taking a high-piled wharf as an example le. Finaly a strengthening
2、and rehabilitation method for the wharf is proposed, which can be used as the reference for the design of similar structural project subsequently.KEY WORDS: strengthening, high-piled wharf, structural design1.ForewordTo guarantee the safe and normal usage of a wharf, in addition to at design, the co
3、nstruction stage provides the good inborn condition for a wharf, at use the stage to also need to catty on the long-term maintenance to a wharf. When a wharf appears the harm, aging etc. phenomenon or suffers the disaster, still need to carry on the check and examine a patient to a wharf, and adopt
4、to correspond of maintain or reinforce the measure.The disease of a wharf harms the main performance to become rusty the eclipse, concrete carbonization, concrete corrosion, the concrete piece to cut to face to decrease for the reinforcing bar, the concrete opens the, water, leaking, the structure s
5、pend greatly, the structure tilts to one side to be partial to move etc. But produce the factor that these disease harm contain following several aspectses:(1) The building design quantity level, design especially medium to the consideration degree of the consideration degree of the durables;(2) The
6、 function that constructs the material satisfies the degree of enduring sex request;(3) The construction quantity level, the craft measure of the exaltation concrete and the structure durable;(4) Building the environment condition of the place, an atmosphere, groundwater and corrosion factor within
7、the industry environment.Table 1 introduce in common use reinforce the characteristic of method and apply the circumstance, and combine the solid example of engineering carries on the analysis.Table 1Reinforce the methodMain characteristicsApply the scopeThe enlargement cuts to face the methodEnlarg
8、e the piece to cut with the of same race material to accumulate in every aspect, exaltation structure loading ability and satisfy normal usage requestGeneral structure of beam, plank, pillar, walletc.A steel reinforces the methodReinforce with a steel at an on all sides pack, cut to face the size an
9、d external to affect very small, loading the ability exaltation compare reatly, be subjected to the dint more dependableBe applicable to disallow to enlarge the concrete to cut to face but need the structure of the exaltation loading dint againThe exterior glues the steel to reinforce the methodGlue
10、 to stick the steel plate in an exterior of the concrete, load the dint with the exaltation, cut to face the size increment not much, the external appearance influence is smallNormal temperature environment under of is generally be subjected to by bend, to pull the piece of and medium light class th
11、e work makes the hoist beamGlue the fiber to build up compound material cloth to reinforce outsideThe exterior glues to stick carbon fiber cloth etc.Load the dint exaltation very big, glue to stick easily, cut to face to increase the thickness very small, outward the view affect smaller, the anti-de
12、cays the ability strongNormal temperature environment under of be subject to pull, be subjected to curved, be subjected to press the piece of and across the corrosion an etc. of piece, anti-greatlyPrepare should the dint reinforce the methodAdopt the in addition prepare should the dint steel pull th
13、e pole or support the pole, carrying on reinforce to the structure, loading the dint and the anti-etc. with the exaltationAcross the structure and large structure greatlyIncrease to establish the fulcrum to reinforce the methodIncrease to establish to prop up the point, let up the structure to acros
14、s the degree and transform, correspond to improve the total loading ability of structureBeam, plank and an etc.Give the beam pulls out the pillar out the pillar techniqueUnder the condition of not dismantle or little dismantle the upper part structure or tore down or replace or connect the technique
15、 of the long postChange usage function and enlarge the old building of the indoor space reformationIncrease to establish to prop up the system and shear the dint wall to reinforce the methodStrengthen the structure resistance level lotus carries the ability and sides to just degree and stabilityThe
16、anti-side dint reinforceIncrease to establish to pull the knot contact to reinforce the methodIn the house peripheral, lengthways, horizontal, to increase and establish and correspond of pull the knot contact, strengthen the whole stability of structure, keep accident trouble from descend the occurr
17、ence tumbles down continuouslyThe assemble type structure anti-tumbles down continuously and the anti-earthquake reinforceThe crack repair techniqueThe instauration or part recovers the loading ability, durable, water tightness and beauty etc. that structure because of crack loseVarious concrete str
18、ucture3. solid example of engineerings3.1 Engineering general situationA wharf (figure 1) of some pose of set up in1960, use up to now already 46 years. Long breadth ofof the whole wharf building flat surface size=the 84m 5.2m. The close together and horizontal row an of the ash wharf be apart from
19、4.5ms, account 19 horizontal row. If see the structure part of an of close together and horizontal row make the unit, account 18 units. An of close together and horizontal row is inclined prop up, the whole wharf is constitute by the corpus structure and the wharf equipments two parts. The corpus st
20、ructure next the beam bottom face high distance is 2.0ms, the crest face high distance is 2.5M, ascend the beam bottom to face high distance is5.0M, the crest face high distance is5.5M, high distance of set of is 1.5M. The wharf front-panel wears the thick 30 mms of layer, sprinkling to build with t
21、he No.200 (equal to C20) concrete.3.2 Engineering structure present conditionAccording to the spot to the inquisition and examinations of the ash wharf, the beam of the wharf upper part structure (a structure of), inclined prop up the breakage and cracks of the different from upper part structure et
22、c. have degree, parts of pieces of contain a of reinforcing bar, and become rusty the eclipse severity, causing the upper part structure loading ability lower. Is a wharf to depend the ship piece particularly at anchor the boats and ships to bump the shot under damaged severity, parts of piece of co
23、mplete breakage. The wharf U from steel structure is be subjected to by the ship piece the ships bumps the shot, widespread have the cave and convex asymmetry to transform, the part transforms seriously, and become rusty the eclipse severity. Figure 2 is parts of plane charts of that wharf.3.3 The c
24、oncrete material strength examination circumstanceLine up one set of along shore in the wharf, 11, 17,18 lines of up the difference selected by examination random 10 measure the area, carrying on the concrete strengths return to play the value to carry on the correction to the concrete, making sure