卧加技术协议(共6页).doc
《卧加技术协议(共6页).doc》由会员分享,可在线阅读,更多相关《卧加技术协议(共6页).doc(6页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、精选优质文档-倾情为你奉上 审核编号:ATTACHMENT FOR CONTRACT (TECHNICAL AGREEMENT)合同附件(技术协议):TECHNICAL AGREEMENT技术协议甲方(买方) :江苏九龙汽车制造有限公司 The Buyer : Jiagsu Joylong Automobile Co., Ltd. 乙方(卖方) : The Seller : 丙方(制造商) : The Maker : 2014年3月12日CONTENT目 录Technical Agreement技术协议书Attachment 1: Supply scope sheet附件一:供货范围Attac
2、hment 2: Machine Specifications附件二:机械参数Attachment 3: NC Unit specification附件三:数控参数Attachment 4: Pre-acceptance Test Record of machine accuracy附件四:机床预验收精度检验书Attachment 5:Technical Proposal附件五:技术方案 TECHNICAL AGREEMENT技术协议Jiagsu Joylong Automobile Co., Ltd. (The End User) will purchase 17sets Horizonta
3、l Machining Centers from, the machine is made by . After full discussion by three sides, we work out the technical agreement as follow: 江苏九龙汽车制造有限公司(需方)设计、制造的卧式加工中心17台,经友好协商就有关技术问题达成如下协议:I. Buyer duty 买方负责: a) After receive the foundation drawing, should finish the foundation in advance. 在收到平面基础图后,提
4、前做好基础 b) is responsible for foundation checking and punching and buyer should help maker to installation and commissioning.负责地基的核实以及地基打孔工作同时买方应配合制造方进行机床的安装与调试。 should provide all necessary foundation components for the machine installation, such as anchor plate leveling plate and chemical bolts提供设备安
5、装所需的所有地脚零件 如地脚垫块,水平调整,化学螺栓等。c) Buyer shall be responsible for machine installation and commission. The buyer will supply the lifting equipment for machine机床安装就位由买方负责并无偿提供起重设备。 II. Maker duty 制造商负责:Provide 17sets Horizontal Machining Center, the type are NHP5500(2 sets)& HC505(15 sets).提供卧式加工中心NHP550
6、0(2台),HC505 (15台)。a) Supply scope供货范围:Refer to Attachment Supply scope sheet 请查阅供货范围附件。b) Standard accessories 标准附件:Refer to Attachment Machine & NC specification 查阅附件机械&NC参数。c) Manual with machine(three sets, English and Chinese language and three sets electrical copy.): maintenance manual, using m
7、anual, operation manual, parts and assembly simple drawing, circuit diagram, ladder diagram, NC instruction, operating manual. 随机说明书(3套,中、英文各3套,电子版3套):维修说明书、使用说明书、操作说明书、零件及装配示意图、电器图、梯形图、NC说明书、操作手册。 d) should provide the energy (power, compressed air) connection interface data to buyer for install in
8、let and outlet pipes hang down ceiling须提供设备(动力电,压缩空气)的详细接口信息,买方将负责至设备端的电缆和气管的安装。 III. Installation安装:1. 设备到场后由买方负责卸货及安装就位,卖方派人员进行现场支持。2.设备基础采用二次灌浆,二次灌浆水泥由买方提供;卖方提供地脚螺栓,买方按要求准备安装所需的垫块。IV. Acceptance 验收: 1. Standard标准:a) Machine standard机床标准:DICs & DIYs machine tool accuracy testing form, KSB4404 出厂标准
9、。b) Machine accuracy is according to Attachment 4; 机床的精度符合附件4。2. Pre-acceptance 预验收:Including items内容包括:a) Equipment and accessories inspection 设备配套情况;b) Accuracy inspection各项精度检测;c) CNC control system function数控系统各控制功能;d) Provide the report of the pre-acceptance include the above items.提供包括以上各项检测收报
10、告。e) Buyer will send persons to for pre-acceptance and also accept the initial technical training. The period is 5 working days. The charge will be borne by the buyer 买方派人员到工厂预验收及接受卖方的初次技术培训,为期5天。 该费用由买方承担。f) machine 50 pieces of workpiece which were provided by Buyer for testing to meet the require
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 技术 协议
限制150内