1、NTC 南京汽轮电机集团Nanjing Turbine & Electric Machinery Group.通用燃煤电厂工程General Coal-fired Power Plant Project 收集资料清单Data Collection List南 京 汽 輪 電 力 工 程 設 計 院 有 限 公 司 NANJING TURBINE POWER STATION ENGINEERING DESIGN INSTITUTE CO.,LTD No.80 NORTH ZHONGYANG ROAD, NANJING, CHINATEL:0086 025 84066449 FAX:0086 02
2、5 85515306- 9 - 设计基础资料清单Design basic data list 工程名称project title:设 计 号design no:建设单位Construction unit :设计阶段Design phase:序 号no基 础 资 料 名 称basic data description 份 数number提交日期Submit date1热机专业thermo-dynamic part 1.1煤质全分析资料、煤价、产地、运输方式等。Coal complete analysis data, coal cost, producing area, transportatio
3、n method etc 1.2热负荷情况:压力、温度、用量、生产情况、(工业、采暖、制冷)。Thermo load condition: pressure, temperature, usage quantity, produce condition(industrial, heating, refrigeration) 1.3当地对脱硫和除尘的要求;灰渣综合利用情况。Local requirement on desulfurize and dedusting; ash comprehensive using condition 1.4当地对烟囱高度是否有限制;建设场地附近有否文物古迹。Wh
4、ether local has the restriction on the chimney height, whether around construction area has cultural relics and historic sites2电气专业 electric part 2.1发电机出线电压、并网电压、并网点系统短路容量或短路电流。(要考虑到发展规划,并折算到电厂母线)Generator outgoing feeder voltage, grid combination voltage, grid combination point system short circuit
5、 capacity or short circuit current 2.2出线方向、距离。Outgoing feeder direction, distance 2.3电网分布情况、用电负荷及用电情况。Power grid distribution condition, electro-load and electricity consumption condition3土建专业 civil part3.1地 形topography3.1.1区域位置地形图。Regional Location Topographic Chart3.1.2厂址地形图(测量范围在厂区周围100米或更大一些范围)要
6、求比例1:1000或1:2000。opographic Map (Measurement area runs the compass of 100 meters or even more around the plant),required scale is 1:1000 or 1:2000.3.1.3厂区地形图1:500,能反映平面和竖向情况的图纸,包括水源位置、交通接入位置等。Plant Area Topographic Map 1:500, which could reflect plane and vertical drawings, including water origin lo
7、cation, transportation juncutre point etc.3.2气 象Climate3.2.1气温和湿度Temperature and Humiditya. 年平均、最高、最低温度。Annual Average, Max., Min temperature b. 平均、最大、最小相对湿度和绝对湿度。Annual Average, Max., Min. Relative Humidity and Absolute Humidity c.平均、最大昼夜温差。Average, Max. Day and Night Temperature Differential3.2.2降
8、水量precipitation volume a. 历年平均、最大、最小降雨量。Annual, Max., Min., precipitation volumn3.2b. 一昼夜、小时最大降雨量。Max. Precipitation Volume Per Day& Night, Per Hourc. 一次暴雨持续时间和最大降雨量。Continuous Time Duration and Max. Rainfall Volume Per Torrential rain3.2.3风winda. 平均、最大风速、风压。Average, Max. Wind Velocity, Wind Pressur
9、eb. 全年和夏季风频和风向。Wind Frequency and Wind Direction of All-year and summer3.2.4气压。Air pressure a. 年平均、绝对最高、绝对最低气压。Annual average, absolute highest, absolute lowest air pressure 3.3交 通Traffic 3.3.1公路:当地公路的运输能力、公路接入点的坐标和标高:公路等级和路面宽度。Highroad: Conveyance Capacity of Local Highway, Coordintate and Elevatio
10、n of Highway Juncture Point: Highway Grading and Surface Width3.3.2水运:航运条件和最大船只吨位、吃水深度:现有码头的装卸能力和驳船条件。Water Carriage: Freight Carrier Condition, Max. Vessel Tonnage, Sea Gauge Depth: Loading and Unloading Capacity of Exisiting Jetty and Barge Specification3.4相邻地区情况Condition of Region in proximity3.4