1、2021PMP资格认证考试考试考前冲刺卷(3)本卷共分为1大题50小题,作答时间为180分钟,总分100分,60分及格。一、单项选择题(共50题,每题2分。每题的备选项中,只有一个最符合题意) 1.The identification, definition and selection of the project objectives, as well as the best approach to achieving the project objectives, are identified in the _ process of the project and documented i
2、n the project _ . A) initiation (authorization), charter B) initiation (authorization), scope statement C) scope definition, scope statement D) scope planning, charter 2.What is the document that forms the basis for an agreement among project team numbers and customer by identifying both the project
3、 objectives and the major project deliverables? A) Project statement of work. B) Configuration management requirement. C) Project scope statement. D) Work breakdown structure. 3.A KEY activity for achieving customer satisfaction is to define _ . A) the business use B) requirements C) product specifi
4、city D) change control 4.Due to cuts in funding, your project has been terminated. The scope verification process _ . A) should be delayed until the project is completed B) should determine the correctness of the work results C) should establish and document the level and extent of completion D) wil
5、l form the basis of the project audit 5.Reviewing work products and results to ensure that all were completed satisfactorily and formally accepted is part of _ . A) risk management B) quality control C) change control management D) verify scope 6.Scope change control MUST be integrated with all of t
6、he following control processes EXCEPT _ . A) schedule B) cost C) procurement D) quality 7.All of the following assist in determining the impact of a scope change EXCEPT_ A) project charter B) baseline C) performance measurement D) milestones 8.The subdivision of major project deliverables, as identi
7、fied in the scope statement, into smaller, more manageable components is called _ . A) parametric estimation B) create WBS C) feasibility analysis D) benefit-cost analysis 9.A work breakdown structure (WBS) numbering system should allow project staff to _ . A) identify the level at which individual
8、WBS elements are found B) identify configuration management milestones C) estimate the costs of WBS elements D) provide project justification 10.Inputs used during scope planning include all of the following EXCEPT _ . A) constraints B) project charter C) budget/cost analysis D) product description
9、11.Completion of project scope activities is not measured against the _ . A) scope statement B) requirements C) WBS dictionary D) WBS 12.The former head of your project office recently fell to his death during a Mount Everest summit attempt. You are the new head of the project office. You are eager
10、to “run the show” because of ongoing confusion in your organization regarding project plans and schedules. Unfortunately, many project managers believe the plan is the schedule. You realize that the plan is much more than a schedule and have decided to issue guidelines concerning items that should c
11、ompose project plans. Your guidelines state the WBS _ . A) does not need to be included in the plan because it would be reflected in the schedule B) should be included as part of the scope management plan C) should be developed, but only to the second level D) should be developed to the level at whi
12、ch control will be exercised 13.Verify scope _ . A) is the process of obtaining the stakeholders formal acceptance of the completed project scope and associated deliverables B) refers to the final project report describing the project at completion C) is not necessary if the project completes on tim
13、e and on budget D) OCCURS only when revisions of change orders are made to the project 14.Which of the following is an example of a constraint? A) A predefined budget. B) The threat of a strike by a subcontractor. C) Relationship with the seller. D) The method used to measure project performance. 15
14、.The U.S. Bureau of Indian Affairs awarded your firm a contact to renovate an elementary school on a Navajo reservation. One contractual term, Indian preference, requires you to hire native American Laborers and subcontractors from the reservation. This is an example of which type of the following c
15、onstraints? A) Social. B) Economical. C) Environmental. D) Legal. 16.As a project manager, the most important activity to ensure customer and stakeholder satisfaction is _ . A) documenting the performance measurements B) reporting changes and updating the project plan and other project documents whe
16、re appropriate C) reporting project status timely and regularly D) documenting the requirements 17.Your company, HealtNut Inc. , is a leading marketer of dietary supplements that can be produced quickly and without regulatory approval. Management wants to explore new markets and new products to boos
17、t revenue and profits. You are leading a team to identify potential products. Because of your background and interest in information technology, you recommended developing wireless communications products. But when you submitted the idea for review, executive management informed you that this produc
18、t would not fit with the organization's core competencies. You need to go back to the drawing board and recommend other products using management's guideline as _ . A) an assumption B) a constraint C) a specification D) a technical requirement 18.A customer is not happy with a project delive
19、rable. What is your BEST course of action? A) Tell the customer it meets the scope of work and get the customer's agreement to proceed. B) Determine why the customer is unhappy with the deliverable. C) Meet with the team to determine changes needed. D) Meet with the customer and offer a substitu
20、te project deliverable. 19.A project manager believes that modifying the project scope may provide added value for the customer. What should the project manager do? A) Change the scope baseline. B) Contact the customer to determine if the change adds value. C) Call a meeting of the change control bo
21、ard. D) Change the project's objectives. 20.You are the project manager of a civil construction company involved with building houses. In your project, you often use work breakdown structures (WBS)from your previous projects as templates. A work breakdown structure can be used for all the follow
22、ing except _ . A) tracking project performance against cost and schedule B) creating a network diagram, with task dependencies C) creating a project schedule D) assigning resources to work on different work elements 21.An example of scope verification is _ . A) review the performance of an installed
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 2021 PMP 资格 认证 考试 考前 冲刺
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内