1、NorthConnectNorthConnectAirport Link and Northern BuswayAirport Link and Northern BuswayTender DesignTender DesignPreliminary Advice on NorthernPreliminary Advice on NorthernBusway PavementBusway PavementHYDER SMEC JVHYDER SMEC JVAirport Link & Northern BuswayAirport Link & Northern Busway Project B
2、id Project BidPreliminary Advice on Northern Busway PavementPreliminary Advice on Northern Busway PavementCoffey (Hyder SMEC JV)PV-NB-01Preliminary220-PVNB01-00049-C-R0230 August 2007Sven PadinaWeeks WhiteAlan CloverSignature:Signature:Signature:CONSULTANT:DESIGN LOT:STAGE:DOCUMENT No.:REVISION No.:
3、ISSUE DATE:AUTHOR:CHECKED:REVIEWED BY:Doc. Ref.File Ref.Issue Date220-PVNB01-00049-C-R-02D:iknowdocsharedatacur_work95075674.doc30 August 2007Page 1 of 15NorthConnectNorthConnectAirport Link and Northern BuswayAirport Link and Northern BuswayTender DesignTender DesignPreliminary Advice on NorthernPr
4、eliminary Advice on NorthernBusway PavementBusway PavementHYDER SMEC JVHYDER SMEC JVRemove this page when final copy is submittedRemove this page when final copy is submittedDateDate22/8/200730/8/2007RevisionRevision010203AuthorAuthorSvenPadinaSvenPadinaCheckerCheckerWeeksWhiteWeeksWhiteDoc. Ref.Fil
5、e Ref.Issue Date220-PVNB01-00049-C-R-02D:iknowdocsharedatacur_work95075674.doc30 August 2007ReviewReviewRevision DescriptionRevision DescriptionAlan CloverFirst DraftAlan CloverFirst IssuePage 2 of 15NorthConnectNorthConnectAirport Link and Northern BuswayAirport Link and Northern BuswayTender Desig
6、nTender DesignPreliminary Advice on NorthernPreliminary Advice on NorthernBusway PavementBusway PavementHYDER SMEC JVHYDER SMEC JVTABLE OF CONTENTSTABLE OF CONTENTSPagePage1 11.11.11.21.21.31.31.41.4CONCEPT DESCRIPTIONCONCEPT DESCRIPTIONIntroductionIntroductionBusway DescriptionBusway DescriptionBus
7、way Design RequirementsBusway Design RequirementsDesign TrafficDesign TrafficBrief Requirements for Design TrafficBrief Requirements for Design TrafficDesign Traffic LoadsDesign Traffic Loads4 44 44 44 45 5551.4.11.4.11.4.21.4.21.51.51.61.61.71.71.81.81.91.9Subgrade ConditionsSubgrade ConditionsPrel
8、iminary Busway Pavement Assessment / Design ( No LRT ): Rigid Pavement DesignPreliminary Busway Pavement Assessment / Design ( No LRT ): Rigid Pavement DesignReviewReviewPreliminary Busway Pavement Assessment / Design ( No LRT ): Flexible Pavement DesignPreliminary Busway Pavement Assessment / Desig
9、n ( No LRT ): Flexible Pavement DesignReviewReviewIncorporation of Light Rail within BuswayIncorporation of Light Rail within BuswayReuse or Rehabilitation of Existing PavementsReuse or Rehabilitation of Existing Pavements6 67 79 9111112122 22.12.12.22.22.32.3ASSUMPTION / DEPARTURESASSUMPTION / DEPA
10、RTURESDesign Traffic LoadsDesign Traffic LoadsSubgrade ConditionsSubgrade ConditionsIncorporation of Light Rail within BuswayIncorporation of Light Rail within Busway13131313131313133 34 45 56 67 78 89 910101111RISKS / OPPORTUNITIESRISKS / OPPORTUNITIESOPERATION & MAINTENANCEOPERATION & MAINTENANCES
11、AFETY IN DESIGNSAFETY IN DESIGNCONSTRUCTABILITYCONSTRUCTABILITYENVIRONMENTAL IMPACTS & APPROVALSENVIRONMENTAL IMPACTS & APPROVALSENVIRONMENTALAL SUSTAINABILITYENVIRONMENTALAL SUSTAINABILITYADVANTAGES / DISADVANTAGESADVANTAGES / DISADVANTAGESOUTSTANDING INFORMATION / MATTERS FOR RESOLUTIONOUTSTANDING
12、 INFORMATION / MATTERS FOR RESOLUTIONRECOMMENDATIONSRECOMMENDATIONS141414141414141414141414141414141515Doc. Ref.File Ref.Issue Date220-PVNB01-00049-C-R-02D:iknowdocsharedatacur_work95075674.doc30 August 2007Page 3 of 15NorthConnectNorthConnectAirport Link and Northern BuswayAirport Link and Northern
13、 BuswayTender DesignTender DesignPreliminary Advice on NorthernPreliminary Advice on NorthernBusway PavementBusway PavementHYDER SMEC JVHYDER SMEC JV1 11.11.1CONCEPT DESCRIPTIONCONCEPT DESCRIPTIONIntroductionIntroductionThis report presents preliminary pavement design advice for the Northern Busway
14、(NB)tender design together with a discussion on preliminary assumptions made on design trafficand subgrade conditions.ThisThis preliminarypreliminary adviceadvice hashas beenbeen restrictedrestricted toto reviewreview andandcommentcomment onon thethe adequacyadequacy ofof thethe RequestRequest ForFo
15、r ProposalProposal (RFP)(RFP) BriefBrief pavementpavementdesignsdesigns only,only, presenting two separate design option reviews, one considering Bus onlytraffic in Busway, and the other considering the possible future inclusion of a Light Rail linewithin the Busway.The RFP Exhibit A, Annexure 1 Par
16、t 1 clause 5.3.3(c) presents specific minimumthickness pavement designs to be used for Busway applications.InIn lieulieu ofof developingdevelopingalternative pavement designs, to support early stage project planning we have onlyalternative pavement designs, to support early stage project planning we
17、 have onlycarried out an adequacy assessment of these designs based on the initial traffic andcarried out an adequacy assessment of these designs based on the initial traffic andsub grade conditions discussed in Sections 2.2.1 and 2.3.sub grade conditions discussed in Sections 2.2.1 and 2.3.Addition
18、ally it should be noted that this review of RFP pavement designs only providespreliminary LRT pavement advice, and detailed design and modelling calculations arerequired to more completely assess pavement thickness and reinforcing.1.21.2Busway DescriptionBusway DescriptionWe understand that the prop
19、osed Busway will be developed in two stages as follows;StageStage 1 1 (current(current development):development): Construction of the Interim Design comprising thefollowing key elements;1. A dedicated Busway from the southern connection north to Federation Street, includingbridge and trough structur
20、es.2. Addition of Bus-only lanes to Lutwyche Road, Truro Street and Roblane Street fromFederation Street to Stoneleigh Street.3. Dedicated Busway tunnel and trough structures from Stoneleigh Street to Gympie Road.StageStage 2 2 (possible(possible futurefuture development):development): Construction
21、of a dedicated Busway tunnellinking 1 and 3 above.Following completion of Stage 2 works a Light Rail Transport (LRT) line may also beincorporated within the Busway corridor to operate in conjunction with Bus operations.Provisions for LRT are to be included within pavement design and construction of
22、Stage 1Bridge, Trough and Tunnel structures.1.31.3Busway Design RequirementsBusway Design RequirementsThe pavement design requirements have been sourced from the following projectdocuments;Project Deed.Request for Proposal (RFP), 14 June 2007.RFP Exhibit A, Performance Specification (including all a
23、ttachments).Doc. Ref.File Ref.Issue Date220-PVNB01-00049-C-R-02D:iknowdocsharedatacur_work95075674.doc30 August 2007Page 4 of 15NorthConnectNorthConnectAirport Link and Northern BuswayAirport Link and Northern BuswayTender DesignTender DesignPreliminary Advice on NorthernPreliminary Advice on Northe
24、rnBusway PavementBusway PavementHYDER SMEC JVHYDER SMEC JV1.41.41.4.11.4.1Design TrafficDesign TrafficBrief Requirements for Design TrafficBrief Requirements for Design TrafficThe key tender requirements with respect to Busway traffic for pavement thickness designsare as follows;Design LifeDesign Li
25、fe(RFP Exhibit A Annexure 1 Part 1 Table A)Pavements for Busways, Bus stations, Bus stops, Bus only lanes, Bus lanes(Turostreet only) (other than wearing surfaces) 40 years.Pavement wearing surfaces 10 years.Design TrafficDesign TrafficPPP Co must design the Busway, Busway Stations, Bus Stops, Bus L