1、拱顶冷热熔盐储罐焊接施工准备3 Construction Preparation3.1 焊工考试3.1 Welder Examination3.1.1 所有参加熔盐罐制作安装工程的焊工必须经过严格的审核和正规的岗前培训,持证上岗,对从事埋弧焊、气体保护焊和手工焊的焊工,应按GB50236-2011现场设备、工艺管道焊接工程施工规范焊工考核的有关规定进行考试。3.1.1 All welders who will take participation in the manufacture and installation of the hot melting salt tank must rece
2、ive strict reviewing and regulated pre-job training and obtain certificates before being appointed the post. The welders who take participation in the submerged welding, gas shielded welding and manual welding should take examination as per relevant regulations for assessment of welders in Field Equ
3、ipment, GB50236-2011 Process Pipeline Welding Construction Specification.3.1.2 对于首次施焊SA-516 Gr.70 N钢板的焊工,必须考试合格,才允许进行相应的焊接工作。3.1.2 The welder who first welds SA-516 Gr.70 N steel plate must take the examination and then be appointed to conduct the welding work after examination qualification.3.1.3 根
4、据现场情况,在正式开工前,完成焊工考试情况。按焊工实际焊接类型分别进行考试。考试合格后,方可进行焊接操作。3.1.3 According to field situation, the welder examination should be completed before formal starting of the construction. The examination should be prepared in line with the actual welding type respectively which will be performed by the welder.
5、The examination qualified welder will be awarded with welder qualification certificate and will be appointed the post in line with certificate. No welding job for welder who failed to be awarded with welder qualification certificate.3.1.4 焊接工作进行前,焊接技术员要对所有焊工进行焊接技术交底,让焊工熟知焊接工艺方案,熟练掌握所焊部位的材质种类和所采用的工艺方
6、法,如坡口形式、焊材选用、焊接电压电流调节、焊接速度控制等,让焊工了解焊接应力与焊接缺陷的危害与预防措施。3.1.4 Before welding, the welding technician should deliver technical details disclosure to all welders to make each welder be familiar with the welding technology plan, to perfectly master the materials classification and applicable technology fo
7、r the welding parts, such as groove shape, welding materials selection, regulation of welding voltage and current, and welding speed control, in order to make the welders understand the hazards and prevention measures of welding stress and welding defects.3.2焊接设备3.2 Welding device 直流电焊机、CO2气体保护焊焊机、埋
8、弧自动平(角)焊机等。焊接设备的电流表、电压表、等仪表、仪器以及规范参数调节装置应定期进行检验。上述表、计装置失灵时,不得进行焊接。手工电弧焊、氩弧焊焊机必须集中放置在离焊接区较近的焊机棚内;自动焊根据现场需要进行放置,放置焊接设备的场地必须保持通风良好、干燥、维修方便。Welding equipment: DC welder, CO2gas shielded welding machine, automatic submerged arc flat fillet welder, etc. Ammeter, voltmeter, and other specification paramete
9、r adjusting devices shall be inspected periodically. When the aforesaid meter and metering device fail to function, welding shall not be performed. SMAW and GTAW welder must be collectively placed in the weld machine shed, near by the weld zone, the automatic weld machine to be placed according to t
10、he site needs. The weld machines shed must be kept well ventilated, dry and easy maintaining.3.3焊接材料Welding materials:焊接材料应具有产品质量证明文件,符合现行国家标准的规定,且实物与证明书上的批号相符,外观检查时,焊条的药皮不得有受潮、脱落或明显的裂纹;焊丝在使用前应清除其表面的油污、锈蚀等;埋弧自动焊丝、焊剂必须放在干燥处妥善保管;低氢型焊材需按照批次、规格不同,分别取样送有资质试验室进行熔敷金属的扩散氢含量检测,扩散氢含量以不超过4mg/100g为合格。Welding ma
11、terials shall have certificate of qualification and shall meet the stipulations of the current national standard, and lot number on the material package shall conform to the certificate; Electrode shall be free of moisture, falling or apparent crack during visual inspection; Welding wire shall be fr