1、【精品文档】如有侵权,请联系网站删除,仅供学习与交流船舶维修保养计划 PMS.精品文档.M.V: 轮 年度维修保养计划表 ( )部Annual Maintenance Plan ( Dept.)格式:SMR-GEN012编号:部 门 长Head of Dept.: 制表日期Date of made out: 船 长Captain: 审核日期Date of audited 机务主管Superintendent: 审批日期Date of approved Remark: 1. in triplicate, one for head of department, one for captain, o
2、ne for superintendent;2. Please take a mark on month column; 3. Please submit this form to superintendent before 30th November every year 4. This form should be in hand over list when C/E and C/O sign off; 备注: 1.本表一式三份,一份部门长留底,一份船长,一份机务主管;2. 检修项目在计划月份中打“”;3.于每年11月30日上报机务主管;4.本表列入交接项目。Vessel_轮_annual
3、 maintenance plan年度维修保养计划表( )部 department 页次: 1/5序号No.检 查 内 容(inspection content)月度month检修负责人Inspect in charge养护负责人Maintain in charge养护周期period备注remark123456789101112一大副分管项目( the items in charged of C/O)1船壳外板和主甲板锈蚀损伤情况,除锈、油漆保养Check vessel hull and deck rusty condition,chipping,painting and maintaini
4、ng大副C/O水手长bosun3个月3 months2各层甲板及其栏杆、护栏(链)、上下扶梯锈蚀损伤情况,除锈、油漆保养 Check rusty condition for each deck,guardrail or guardchain, gangway guardrail,chipping,painting and maintenance.大副C/O水手长Bosun3个月3 months3舷墙及栏杆锈蚀损伤情况,除锈、油漆保养Check bulwark and guardrail rusty condition,chipping,painting and maintain大副C/O水手长
5、Bosun3个月3 months4货舱、顶边舱的骨材(包括肋骨、强肋骨、纵骨、纵樑等)、舱壁(包括水密隔舱壁)、扶强材、斜坡板、肘板、内底板锈蚀、损伤、变形、焊缝和涂层情况,除锈、油漆保;Stiffeners for cargo hold,top side ballast tank(include rib, vertical girder),cargo hold wall(include watertighting partition),supporter,heel plate,elbow plate,cargo hold bottom rusty condition,scathe,defor
6、m,weld line coat condition checking,chipping,painting and maintaining.大副C/O水手长Bosun3个月3 months5艏尖舱、艉尖舱、双层底压载舱、锚链舱、深水舱的骨材(包括肋骨、强肋骨、纵骨、纵樑等)、舱壁(包括水密隔舱壁)、扶强材、肘板、各层平台锈蚀、损伤、变形、焊缝和涂层情况;All stiffeners and tanks walls regarding to FPT,APT,ballast tanks,anchor chain tanks and F.W tanks,tanks top flats to be c
7、hecked;rusty,damaged deformed,welded line and coat condition to be checked.大副C/O水手长/木匠Bosun/carpenter6个月6 months6日用淡水舱、炉水舱、隔离空舱的骨材(包括肋骨、强肋骨、纵骨、纵樑等)、舱壁(包括水密隔舱壁)、扶强材、肘板、各层平台锈蚀、损伤、变形、焊缝和涂层情况All stiffeners and tanks walls regarding to daily F.W tanks,boiler water tank,insulating tanks to be checked,all
8、tanks flats rusty,damaged deformed,welded line and coat condition to be checked.大副C/O水手长/木匠Bosuncarpenter二年Two years7锚、锚链环、锚链筒、锚链卸克、锚链转环、连接链环、制链器、链节标志,锚机底座、离合器、刹车装置、传动齿轮、操纵平台、缆绳卷筒护栏等常规检查、活络加注牛油,外表清洁上油除锈油漆保养Anchor,anchor chain ring,anchor chain entry socket,anchor chain shackles,connecting chain ring
9、,anchor chain stopper,chain length markers,windlass foundation,clutch,braker,driving gear,operation station,mooring rope roller,and its guardrail to be checked routinely,activated,greased,cleaning,chipping and painting.大副C/O水手长/木匠BosunCarpenter3个月3 months8绞缆机底座、离合器、刹车装置、传动齿轮、操纵平台、缆绳卷筒护栏等常规检查、活络加注牛油,
10、外表清洁上油除锈油漆保养Foundation for winch,clutch,brake apparatus,driving gear,operation station,mooring rope roller and guardrails to be checked frequently,activated and greased,chipped,cleaned and painted.大副C/O水手长/木匠Bosuncarpenter3个月3 months9舷梯机座、舷梯、滑车、钢丝绳、卸克、横担等常规检查、活络加注牛油,外表除锈油漆保养Foundation for gangway,ga
11、ngways,pulleys,wires,shackles,steps to be inspected frequently,activated and greased,chipped and painted.大副C/O水手长/木匠BosunCarpenter3个月3 months10绞缆机刹车测试 The brake test of mooring winches大副C/O水手长/木匠Bosuncarpenter每年Each year11各层甲板的缆桩、导缆孔、导缆钳、导缆轮、羊角、地令等常规检查,活络、除锈、油漆保养each deck mooring rope bollard,moorin
12、g ropes guiders,mooring rope clamp,mooring rope wheels,sheep hooks,lashing eyes to be checked,activated,chipping and painting.大副C/O水手长Bosun3个月Months12各货舱,泵舱(间)、SLOP(油轮)舱下舱扶梯锈蚀损伤情况All cargo holds,pump rooms,ladders to cargo hold to be checked,rusty condition,damage condition to be inspected.大副C/O水手长B
13、osun每航次Each voyage13污水井及其蜂窝巢(油轮的货油泵、扫舱泵和艏压载泵进口滤器)清洁、疏通Bildge wells and its beehive(filters) to be cleaned and dredged.大副C/O木匠/水手长Bosuncarpenter每航次Each voyage14油轮惰性气体控制盘Oil tanker inert gases control set(for oil tanker,no applicable)大副C/O水手长Bosun每航次Each voyage15油轮惰性气体甲板水封Oil tanker inert gases deck w
14、ater seal(for oil tanker,no applicable)大副C/O水手长Bosun每航次Eachvoyage16油轮惰性气体控制阀Oil tanker inert gases control valve(for oil tanker,no applicable)大副C/O水手长Bosun每航次Each voyage17测氧仪、测爆仪检查保养效用试验Oxygen detector or explosion detector to be checked and efficiency confirmed大副C/O大副C/O每航次Each voyage 页次: 2/5 序号检 查
15、 内 容inspection content月度month检修负责人Inspect in charge养护负责人Maintain in charge养护周期period备注remark12345678910111218各层甲板的通风筒、透气管(帽)、防火网、测量管常规检查,外表除锈油漆保养,Ventilators,vent pipe(cap),fire damper,sounding pipes on each deck to be checked routinely,chipped,cleaned and painted.大副C/O水手长/木匠Bosuncarpenter3个月3 month
16、s19烟囱及防火网检查,外表除锈油漆保养Funnel and its fireproof nets to be checked,chipped,cleaned and painted.大副C/O水手长Carpenter3个月320各层甲板和舱室(间)的水密门、水密门窗、百叶窗,生活区内的门(自闭门)、窗、盖,机舱天窗、泵房天窗检查,外表除锈油漆保养、标识Watertight doors,watertight windows,shutters on each deck and cabins,all doors(auto-shut down doors) windows,covers on liv
17、ing area,E/R skylight,pump room skylight to be checked,chipped.cleaned and painted.大副C/O水手长/木匠BosunCarpenter3个月3 months21舵机间、冷藏机间、空调机间、应急发电机间(或蓄电池间)、应急消防泵间、艏艉侧推器间的围壁、天花板、地板(地板格栅)的清洁、除锈、油漆保养Steering gear room,refrigerator room,air condition room,emergency alternator(battery room),emergency fire pump
18、room,abow thrusters room wall,ceiling,floors to be cleaned,chipped and painted.大副C/O水手长bosun1个月month22舱盖和舱口围的框架、围板、扶强材、肘板、滚轮及轮轴等检查锈蚀、损伤、变形、焊缝、水密情况,活络加注牛油、外表除锈油漆保养Frames or stiffeners on hatch covers and hatch coaming,rollers and its shafts to be checked,condition for rusty,scathe,deform,weld line,wa
19、tertight to be checked,activated and greased,chipped and painted.大副C/O水手长/木匠Bosuncarpenter1个月1 month23桅杆、旗杆、灯桅、大桅、将军柱的加强肘板、固定钢丝绳、地令等检查,外表除锈活络油漆保养Stiffeners,secure wires and lashing eyes for masts,light mast and main mast to be checked,cleaned,chipped,activated and painted.大副C/O水手长Bosun1个月1month24油轮的