常用钻井英语缩写.doc
《常用钻井英语缩写.doc》由会员分享,可在线阅读,更多相关《常用钻井英语缩写.doc(22页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、Four short words sum up what has lifted most successful individuals above the crowd: a little bit more.-author-date常用钻井英语缩写常用钻井英语缩写钻井英语缩写1. DP drill pipe 钻杆2. HWDP heavy weight (wall) drill pipe 加重钻杆3. DC drill collar 钻铤4. BHA bottom hole assembly 井下钻具组合5. STB stabilizer 钻杆扶正器6. PNMDC pony non-magne
2、tic drill collar 短无磁钻铤7. SMDC short non-magnetic drill collar 短无磁钻铤8. PDM positive displacement motor 螺杆9. BOP blowout preventer 封井器10. BOPE blow out preventer equipment 封井器设备11. IBOP inside blowout preventer 内防喷工具12. CSG casing 套管13. TBG tubing 油管14. JNT/JT joint 单根15. XO cross-over 配合接头16. IF inte
3、rnal flush 内平17. FH full hole 贯眼18. REG regular 正规19. IU internal upset 内加厚20. EU external upset 外加厚21. EUE external upset 外加厚22. IEU internalexternal upset 内外加厚23. OH open hole 裸眼24. WOB weight on bit 钻压25. RPM revolutions per minute 转速/分钟26. SPM strokes per minute 冲程/每分钟27. ECD equivalent circulat
4、ing density 当量泥浆密度28. MT metric ton 公制吨29. DST drill stem test 钻具测试30. KS key seat 键槽31. KSW key seat wiper 键槽清洁器32. STDS stands 立柱33. VIS viscosity 粘度34. PV plastic viscosity 塑性粘度35. YP yield point 屈服值36. FL filtrate loss 滤失37. WL water loss 失水38. TVD true vertical depth 垂深39. MD measured depth 测量井
5、深40. TD total depth 总井深41. PBTD plug back total depth 人工井底42. PCS piece 件,个43. KOP kick off point 造斜点44. DIR direction 定向45. AZM azimuth 方位46. DEV deviation 井斜47. ROP rate of penetration 机械转速48. ID inside-diameter 内径49. OD outside diameter 外径50. FTG footage 进尺51. PPG pounds per gallon (密度)每加仑磅52. PS
6、I pounds per square inch 磅每平方英尺53. SGL single 单根54. LP low pressure 低压55. HP high pressure 高压56. HP horsepower 马力57. HHP hydraulic horsepower 水马力58. HTHP high temperature high pressure 高温高压59. AD assistant driller 副司钻60. LCM lost circulation material 堵漏剂61. API American petroleum institute 美国石油协会62.
7、 IADC international association of drilling contractors 国际钻井承包商协会63. CNPC China national petroleum 中国石油天然气总公司64. P/N part number 零件型号65. S/N serial number 系列号66. N/W net weight 净重67. G/W gross weight 毛重68. P/U pick up 吊起69. M/U make up 接上70. L/D lay down 甩开71. N/U nipple up 接上72. N/D nipple down 卸开7
8、3. R/U rig up 安装74. R/D rig down 拆卸75. WOC wait on cement 候凝76. WOW wait on water 等水77. WOW wait on weather 等天气78. WOO wait on order 等指令79. RIH run in hole 下钻80. POOH pull out of hole 起钻81. DR drilling 钻进82. DDR daily drilling report 钻井日报表83. RM reaming 扩眼(划眼)84. BR back ream 倒划眼85. TOF top of fish
9、鱼顶86. SX sacks 袋87. MW mud weight 泥浆密度88. CBU circulate bottom up 循环一周89. TOH trip out of hole 起钻90. MWD measurement while drilling 随钻测量91. LWD logging while drilling 随钻测井92. POB personnel on board 井场人员93. SG specific gravity 比重94. NDT non-destructive test 无损探伤95. S/I shut in 关井96. PTW permit to wor
10、k 工作许可97. BPV back pressure valve 回压凡尔98. DIBPV drop in back pressure valve 投入式单流阀99. NP neutral point 中和点100. UPS uninterrupted power supply 不间断供电101. RBP retrievable bridge plug 可取回桥塞102. SICP shut in casing pressure 关井套压103. SIDPP shut in drill pipe pressure 关井立压104.MAASP maximum allowable annula
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 常用 钻井 英语 缩写
限制150内