2022年给排水专业毕业设计英文翻译中英文对照 .pdf
《2022年给排水专业毕业设计英文翻译中英文对照 .pdf》由会员分享,可在线阅读,更多相关《2022年给排水专业毕业设计英文翻译中英文对照 .pdf(11页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、1 / 11 安徽建筑工业学院毕业设计(论文)外文资料翻译系别:环能学院专业:给水排水工程班级:给排水 08-1 姓名:王亮学号: 08203010118 外文出处: Wan Fang foreign languages literature datebase 附件:1、外文原文; 2、外文资料翻译译文。精选学习资料 - - - - - - - - - 名师归纳总结 - - - - - - -第 1 页,共 11 页2 / 11 1、外文原文Supplying and draining waterinhospital construction With the fact that modern
2、 medicine science promptness develops,new technique , the new armamentarium are continuing without end , modernized medical treatment thereby consonant with that is building a hospital , are also are confronted with new design idea and new technology applying. Disregarding secondary hospital buildin
3、g function , what whose gets along environment, still , finclause the hospital builds equipment and is equipped with system, the request is without exception higher and higher. Because of it is to ensure daily work living not only need the rapid and intense life relevance recovering from the illness
4、 , avoiding crippling , rescuing, and promote with giving treatment to a patient. Not only the design accomplishing to the special field draining away water need to satisfy the request being unlike a function in hospital building on equipment , but also safety is be obliged to reliable. Following is
5、 built according to the hospital. 一 HOSPITAL GIVES A SEWERAGE 1) Modernized hospital equipment and equipment system content is numerous , the function is peculiar , the request is very high. Except demanding to swear to continue supplying with the use water according with quality level sufficiently,
6、 need more according to demand of different medical treatment instrument and different administrative or tehcnical office to water quality , water pressure , the water temperature, classify setting up water treatment system and be in progress to system to increase pressure reduction. 2) The hospital
7、 operating rooms , the delivery room operation the water hygiene, saliva washing hands by shower bath water , the dentistry dentistry chair ought to adopt the water purifying degassing. In the homeland few are large-scale , the high rank hospital centre supplies a room, the centre disinfecting has a
8、lso adopted to purify the water disinfecting, now that swear to there be no dust , the sterility , to remove the pathopoiesia source , to avoid the blockage infecting , cutting down equipment microtubule. 3) Hospital preparation rooms preparation uses water to adopt distilled water, and sets up in m
9、aking distilled water system to have part pressure boost facilities. The handicraft responds to according to different hospital preparation handicraft but fixes concrete system distilled water, should satisfy demand of whose handicraft to water quality , water yield , water pressure act in close coo
10、rdination that the preparation handicraft reserves corresponding to drain-pipe and 精选学习资料 - - - - - - - - - 名师归纳总结 - - - - - - -第 2 页,共 11 页3 / 11 allocation chilled water circulatory system by the special field draining away water. 4) Hospital operating rooms , delivery rooms , baby rooms , supply
11、rooms , medical treatment of the dermatological department wards, door emergency call, cures skill every administrative or tehcnical office and the request difference that the staff and worker logistics branch supplies to hot water need to set up hot water respectively supplying system more. Ordinar
12、y circumstances door emergency call, cures skill administrative or tehcnical office , centre supply a room , the staff and worker logistics branch supplies hot water to water supply the regular time, the comparison supplying time is consistent. The hospital is based on major part at present financia
13、l resources, ward building hot water supplies basic to the regular time , ought to be that 24 hs supply hot water judging from long-term angle but. Operating room , the delivery room operation wash hands, the hygiene h by the fact that the shower bath ought to be 24 supplies hot water, moreover the
14、block of wood 5) Considers beautification to the environment , is inadvisable to adopt the steam boiled water stove , completely eradicates occurrence aroused the ward building pantry inner floor moistness , avoided interior wall mustiness phenomenon by leak or sparse steam water implement aerofluxu
15、s thereby. The hospital disregards size , boiled water supplies to should adopt automation volume or the electricity boiled water stove, a general disease area considers one , volume ascertains that according to using condition. The first easy to protect labor is managed,two is supplying ensuring th
16、at to the patient , improves the internal environment of ward at the same time. 6)Especially infecting the section ward every door emergency call administrative or tehcnical office, every consulting room , the hand movement water curing a room , washing a basin should set up mistake chew , may adopt
17、 elbow style , knee style or dyadic switch of pedal. If using the dyadicswitch of pedal to must use the product guarding against leakage, the floor is to avoid using a place often damp , makes the patient , the medical personnel slip down , an accident happened. Operation waits for the operating roo
18、m , the delivery room to wash hands should adopt the constant temperature muddy water valve , the constant temperature to produce water, taking as an example infrared ray induced electromagnetic valve control mode for fine. Cure skill part control laboratory , laboratory of administrative or tehcnic
19、al office have the peculiar request , water chews the form should ascertain whose water according to every administrative or tehcnical office coming functional request chewing. 7)Many administrative or tehcnical office, especially downstream pipelines such as pickling 精选学习资料 - - - - - - - - - 名师归纳总结
20、 - - - - - - -第 3 页,共 11 页4 / 11 bath , the pool disinfecting , develop pool in administrative or tehcnical office such as checking the room , the control laboratory , emitting section responds to of hospitals are adopt to be able to bear the rotten PVC2U draining off silent stock tube. 8) Pair of f
21、ilth , waste water of all kinds must classify strictly according to the country in connection with the effluent standard , the field carrying out a pertinency with different treatment handicraft deals with and handles. 9) Uses a function to need since the modern hospital needs to be satisfied with n
22、ot only , wants to think that the interior outside environment is beautiful too at the same time. The building needs especially door emergency call, cures skill sometimes because of medical treatment function , give the horizontal stroke draining away water , erect a tube arrange to lie scattered co
23、mparatively, more bright dew is in interior, warm the pipeline exchanging special field up in addition sometimes , make the pipeline that the room inner clearly shows more than the correct or required number , both inelegant, and affect hygiene. This demands right away in the process of engineering
24、design , the rational arrangement the structure form should fully utilize not being the same as is carried out, needs to make the various pipeline conceal arrangement to the full according to the function , pays attention to beautiful befitting ones position or suited to the occasion under not affec
25、ting the premise being put into use. Certainly, these require that building structure special field is dense. Tier of furred ceilings and the basement top sometimes are every special field pipeline aggregation field , every special field norm and request having every special field , each sometimes a
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 2022年给排水专业毕业设计英文翻译中英文对照 2022 排水 专业 毕业设计 英文翻译 中英文 对照
限制150内