电力监理个人工作总结.docx
《电力监理个人工作总结.docx》由会员分享,可在线阅读,更多相关《电力监理个人工作总结.docx(6页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、精品名师归纳总结电力监理个人工作总结The flight of time, the sun and the moon as comb, a years time is very short, imperceptibly in 2022 will soon be over, should sum up the past, think about the future, take the past long,short future. Looking back over the past year, I have mainly made the following aspects:I. safet
2、y management. Only because of my company constructionpower supply,particularity,companywiththe power management system on the basis of, increase the use of constructiontemporary power management, I personally do daily inspectionon site, adhere to regularly check the opening and closing operation of
3、the station, the request for opening and closingthe stationmanagementproblems,and urge rectification.In theopening and closing station equipment defects, and activelycontactthe manufacturersof spare parts,in-depthon-siteand maintenance personnel together to find problems, andultimately ensure the no
4、rmal use of equipment.Two, construction quality. From April to the beginning of factory began to be responsible for the inspection and management of lightning protection and grounding of construction work, in accordance with the relevant quality management standard of lightning protection grounding
5、grid construction plant to conduct a comprehensive tracking, housing area, inspection, proposed requirements from various aspects, the size of seam welding method and joint corrosion, and the organization of construction units and supervision ofthe two have been completed on the area of the acceptan
6、ce test, the groundingresistanceare qualified,so thatthe qualityof the project is controlled.可编辑资料 - - - 欢迎下载精品名师归纳总结Three 、siteconstructionmanagement.Accordingto the project progress and two level network plan, according to theprofessional equipment under the jurisdiction of the individual work pla
7、n, the daily tracking of key projects, dedication, supervision and supervision of construction site management work, participated in the opening and closing ofoutage maintenance work station, to complete the entire plant supervision point of lightning protection and grounding installation assist in
8、the completion of the work, 110kVsubstation584 fenglingtuswitchto replacethe CT, 110kV powersupply scheme, second routereconnaissance 500kVoutletearly research and site reconnaissance work.Four, professional basic work. According to the Department of arrangements, combined with the actual characteri
9、stics of professional, established professional production plan, participate in the development of professional standards, including: electrical inspection, long electrical inspectionstaff standards; management standards, including: the post standard electricalinspectionof inspectionstaff,electrical
10、 insulation supervision; technical standards; electricalelectrical professional division of labor; check, inspection staff safety responsibilities, on-site construction power management standards, electrical equipment groundinggrounding management and preventing electrical misoperationmanagement sta
11、ndard, an electrical equipment, electrical equipment, construction drawings inventory management standard, electrical spare parts management standard, electrical work ticket management standard, cable inspection cleaning management standard check, ventilator management可编辑资料 - - - 欢迎下载精品名师归纳总结standar
12、d, electrical equipment, electrical equipment defect management standard transaction management standard, electrical equipment application Construction and acceptancestandardof electricalmaintenance unitsin the assessment andevaluation standard, the electrical equipment maintenance management standa
13、rds, electrical equipment maintenance managementstandards;as wellas the 5 major categoriesof more than 60 electrical technical standards, and collected a greatdeal of maintenance, an electrical equipment maintenance materials.Five drawings and equipment management. According to the arrangement, has
14、participated in the 500kV breaker, 500kV current transformer, closed bus, 6kV switch cabinet, diesel generator and auxiliary workshop low-voltage switchgear, dry change equipment bidding,In the meantime, I have successfullycompleted the negotiations and signing of the tender examination, bid opening
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 电力监理个人工作总结 电力 监理 个人 工作总结
限制150内