文档模板2:软件详细设计说明书.docx
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_1.gif)
![资源得分’ title=](/images/score_05.gif)
《文档模板2:软件详细设计说明书.docx》由会员分享,可在线阅读,更多相关《文档模板2:软件详细设计说明书.docx(16页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、文档模板2:软件详细设计说明书 文档模板2:软件详细设计说明书 文档编号版本 A1 密级商密A 研发生产中心项目名称 XX系统 项目来源 QR-RD-022(Ver1.2) Xxx系统 详细设计说明书 编写: 日期: 检查: 日期: 审核: 日期: 批准: 日期: 版权所有不得复制 supervision upon the acceptance of electric hoist can be installed before installation check before leaving the factory the factory information, including fac
2、tory certificate, inspection reports and so on whether met with factory-installed condition. Its installation, only to release the running gear, running gear wheel can be fixed on the track under the steel flange, and power lines running. 1) before the installation, must be fully informed of the man
3、ufacturer for the installation of electric hoists on technical performance, usage, installation instructions. 2) after the transfer of equipment, electric hoist track embedded parts design or installation, the hoist should be first buried track and all its components, structural Assembly, or mechani
4、cal Assembly such as checking . Check the cleaning machine parts are manufactured in the factory are complete, each component has any damage in transport, during storage . Check all parts installed at the Assembly tag belongs to the cleaning machine parts. Anyone who does not belong to the cleaning
5、machine parts or assemblies, not the Assembly together . Found in the Assembly to check damage, defects or missing parts, repair should be carried out, padded 文档变更记录 序号作者版本号日期批准变更(+/-)说明 1 2 supervision upon the acceptance of electric hoist can be installed before installation check before leaving t
6、he factory the factory information, including factory certificate, inspection reports and so on whether met with factory-installed condition. Its installation, only to release the running gear, running gear wheel can be fixed on the track under the steel flange, and power lines running. 1) before th
7、e installation, must be fully informed of the manufacturer for the installation of electric hoists on technical performance, usage, installation instructions. 2) after the transfer of equipment, electric hoist track embedded parts design or installation, the hoist should be first buried track and al
8、l its components, structural Assembly, or mechanical Assembly such as checking . Check the cleaning machine parts are manufactured in the factory are complete, each component has any damage in transport, during storage . Check all parts installed at the Assembly tag belongs to the cleaning machine p
9、arts. Anyone who does not belong to the cleaning machine parts or assemblies, not the Assembly together . Found in the Assembly to check damage, defects or missing parts, repair should be carried out, padded 目录 1. 引 言 . . (4) 1.1 编写目的和范 围 . . (4) 1.2 术语 表 . . (4) 1.3 参考资 料 . (4) 1.4 使用的文字处理和绘图工 具 .
10、.4 2. 全局数据结构说 明 . . (4) 2.1 常 量 . . (5) 2.2 变 量 . . (5) 2.3 数据结 构 . .5 3. 模块设 计 . (5) 3.1 用例 图 . . (5) 3.2 功能设计说 明 . . (5) 3.2.1 模块 1 . (5) 3.2.2 模块 2 . .6 4. 接口设 计 . (7) 4.1 内部接 口 . (7) 4.2 外部接 口 . (7) 4.2.1 接口说 明 . (7) 4.2.2 调用方 式 . .7 5. 数据库设计. .7 6. 系统安全保密设计 . . (8) 6.1 说 明 . . (8) 6.2 设 计 . . (
11、8) 6.2.1 数据传输部 分 . . (8) 6.2.2 IP过滤分 部 . (8) 6.2.3 身份验证部 分 . .8 7. 系统性能设 计 . .8 8. 系统出错处 理 . . (8) supervision upon the acceptance of electric hoist can be installed before installation check before leaving the factory the factory information, including factory certificate, inspection reports and so
12、 on whether met with factory-installed condition. Its installation, only to release the running gear, running gear wheel can be fixed on the track under the steel flange, and power lines running. 1) before the installation, must be fully informed of the manufacturer for the installation of electric
13、hoists on technical performance, usage, installation instructions. 2) after the transfer of equipment, electric hoist track embedded parts design or installation, the hoist should be first buried track and all its components, structural Assembly, or mechanical Assembly such as checking . Check the c
14、leaning machine parts are manufactured in the factory are complete, each component has any damage in transport, during storage . Check all parts installed at the Assembly tag belongs to the cleaning machine parts. Anyone who does not belong to the cleaning machine parts or assemblies, not the Assemb
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 文档 模板 软件 详细 设计 说明书
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内