试论土建工程造价中的全过程跟踪审计方法中英文对照.doc
《试论土建工程造价中的全过程跟踪审计方法中英文对照.doc》由会员分享,可在线阅读,更多相关《试论土建工程造价中的全过程跟踪审计方法中英文对照.doc(6页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、 试论土建工程造价中的全过程跟踪审计方法中英文对照Try to talk about construction project cost in whole process tracking audit method contrast in both Chinese and English 一、全过程跟踪审计法的原则One, the whole process tracking audit law principle 在建工程是一个由多方参与的活动,需要每个参与者之间相互配合共同完成,因此,在进行跟踪审计的过程中,审计单位必须首先明确自身的任务,合理定位,确定工作的原则。Construction
2、 project is a participating activities, the need to cooperate with each other between each of the participants, therefore, in the process of tracking audit, the audit unit must first clear their own task, reasonable positioning, determine the principle of work. 1 以工程的总体目标为中心1 centering on the projec
3、ts overall goal 工程的建设包括工程投资、工程进度和工程质量,在进行跟踪审计时,必须要明确这些环节的具体目标,围绕目标开展工作,对在建工程进行分析评价,给工程造价提供依据,平衡和优化整个建设工程。Project construction, including project investment, project progress and quality of construction, in the follow up audit, must clearly be the link to specific goals, work around the target, analy
4、ze the project under evaluation, and provide a basis for project cost, balance and optimization of the entire construction project. 2 以工程的投资为重点2, with emphasis on the engineering investment 跟踪审计的主要目的就是要控制工程的总投资,将工程造价做到最低,保证工程的经济效益,因此在进行跟踪审计的过程中,要将投资作为重点项目进行审计,监督资金的使用情况,优化工程的设计方案,提出合理的建议,保证资金高效、合理、经济
5、的使用,最大限度地发挥投资的功能。Tracking audits main purpose is to control project investment, will do the lowest engineering cost and guarantee the project economic benefits, therefore in the process of tracking audit, investment project audit, as the key to monitor the application of the funds, optimize the engi
6、neering design, put forward reasonable Suggestions, efficient, reasonable and economic use of guarantee funds, maximize the function of investment. 3 以工程质量为重要环节3 important link for the engineering quality 一个工程,在保证经济效益的前提下,质量一定要过关,因此跟踪审计过程中一定要严把质量关,将质量作为不可忽视的环节,对工程的每个阶段都进行全程的监测审计。在保证工程质量的前提下,实现实际投资不超
7、过计划投资,挖掘成本节约的潜能,以实现跟踪审计的最终目标。A project, in guarantee under the premise of economic benefit, the quality must pass, so in the process of tracking audit must strictly the quality pass, the quality cannot be ignored as a link, the monitoring of each stage of the project for the entire audit. On the pre
8、mise of guarantee the engineering quality, to achieve real investment is less than planning, excavate the potential of cost savings, in order to realize the ultimate goal of tracking audit. 二、全过程跟踪审计法的内容Second, the content of the whole process tracking audit law 对于建筑工程的跟踪审计,主要目的就是要保证工程的质量,将工程的使用资金控制
9、在造价的计划范围内,使整个工程获得经济效益,保证工程的顺利竣工,同时保证工程的合法进行。因此全过程跟踪审计的内容要涉及到工程的建设前期准备工作、建设过程中以及工程完成后的各个环节。For tracking audit of construction projects, the main purpose is to guarantee the quality of engineering, the engineering use of capital controls within the scope of the cost plan, to generate economic benefits
10、 to the whole project, ensure project successfully completed, at the same time guarantee the legitimate engineering progress. So the content of the whole process tracking audit involves engineering construction preparation, construction process and project after the completion of each link. 1 建设前期Pr
11、ior to the construction of the 1 土建工程在建设前期有较多准备工作,作为全过程的跟踪审计方法,一定要将各个环节都控制在自己的监督范围内。At the early stage of the construction of civil engineering have more preparatory work, as the whole process of tracking audit method, should control each link are within the scope of their supervision. 2 建设中期2 const
12、ruction medium-term 工程建设过程中的造价工作必须要做到真实、准确、合理、合法,因此需要审计工作者充分发挥自身的审计职能。例如审计预算的编制是否符合投资的标准和工程的整体成本;审计工程的设计过程是否严格按照标准进行,是否存在边设计边施工的现象、虚拟成本影响造价的现象等;对设计的变更、现场的签证以及材料的价格进行审计,看是否真是合理;对于工程的招标合同进行审计,并结合施工现场的进度核实资金的支付等,保证工程建设过程中的审计工作顺利完成,使工程能够按时完成竣工结算。Project construction cost in the process of work must be t
13、ruthful, accurate, reasonable and legal, so you need audit workers own audit function into full play. For example, the audit budget compilation is in line with the standards and engineering overall cost of the investment; Audit project design process is in strict accordance with the standards, wheth
14、er there is a design and construction of the phenomena and virtual phenomenon of cost impact cost, etc.; Changes to the design, on-site visa, and the price of the material audited, see if it is reasonable; For project bidding and contract audit, and connecting with the progress of the construction s
15、ite to verify the payments of money, guarantee the engineering construction in the process of the audit is completed, the project can finish on time completion and settlement. 3 建设后期3 construction of late 建设后期(工程竣工)后的审计工作同样重要,如工程清单是否准确无误,设计的变更和工程的签证是否真实可靠,有无欺骗行为;工程使用的材料价格与实际市场价格是否吻合,是否和预算结果相一致;施工人员的
16、费用是否按照规定结算;招标文件及合同中规定的工程质量、工期是否按照合同约定完成;在施工过程中是否有挪用资金的现象;工程的结算是否与预算吻合等情况,这些都是工程竣工后需要审计的。Construction later (after project completion) of the audit work is also important, such as engineering list is accurate and correct, design changes and visas are true and reliable, without cheating; Engineering m
17、aterials used in the price and it fits the actual market prices, if consistent results and budget; Construction personnel whether the cost of settlement in accordance with the relevant provisions; Specified in the bidding documents and contract of engineering quality, time limit for a project is com
18、pleted according to contract agreement; If there is a phenomena of embezzlement in construction process; Engineering settlement is in accordance with the budget, etc., these are all need audit after project completion. 三、全过程跟踪审计法的注意事项Three, the whole process of tracking audit law of the matters need
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 试论土建工程造价中的全过程跟踪审计方法 中英文对照 土建 工程造价 中的 全过程 跟踪 审计 方法 中英文 对照
限制150内