1、OPERATOR: Conocophillips WELL NAME: PL13-1-1 CONTRACTOR: COSLPL13-1-1 钻井工程设计Drilling Program 设计 Designed by 审核 Verified by 批准 Approved by 中国海洋油田服务股份有限公司China Offshore Oilfield Services, Ltd.Jan. 2003目 录TABLE OF CONTENT一、基本数据 General Information2二、井身结构 Well-bore Structure3三、地质部分 Geological Informatio
2、n5四、套管和固井计划 Casing and Cementing Program6五、钻具组合 Bottom Hole Assembly Program8六、钻头计划 Bit Program9七、泥浆计划 Mud Program10八、测井计划 Wire-line Logging Program10九、弃井计划 Well Abandonment Program11十、施工程序 Operation Procedure13十一、压力试验 Pressure Testing16十二、施工进度计划 Timing Estimate Schedule17十三、井口装置图 Well Head Assembly
3、19附件、质量、健康、 Requirement of Quality & Health 安全、环保要求 & Safety & Environment一、 基本数据 General Information井名:PL13-1-1Well Name:PL13-1-1作业者:菲利普斯中国有限公司License Operator:Phillips China Inc.井别:初探井Well Class:Wildcat Well井型:直井Well Style:Vertical Well作业区块:渤中区块 CA 11/05Block:BoZhong Block 11/05构造位置:蓬莱13-1Geologic
4、al-Structure Location:PengLai13-1 Structure深度零点:转盘面The Zero Depth:Rotary Table水深:27.00米(平均海平面)Water Depth:27.00 m(MSL)气隙:8 米Air Gap:8 m转盘面至平均海平面:23米RT Elevation:23m计划井深:4200 米(转盘面)Propose Depth:4200 m(RKB)总包井深:1800 米(转盘面)TurnKey Depth:1800 m(RKB)井口座标:北纬: 383744.076N:东径: 1200910.08EWell Surface Locat
5、ion Coordinates:Latitude: 383744.076N :Longitude: 1200910.08总承包商 Turnkey Contractor:中海油田服务股份有限公司 COSL钻井平台 Drilling Rig:渤海八号 BoHai No.8二、井身结构 Well Bore Structure1. 井眼程序 Well bore program26 x 270m12-1/4 x 1800m + 8-1/2 x 4200m2. 套管程序 Casing program20 x 265m9-5/8 x 1795m 注意:9-5/8 套管下入深度将取决于地质情况,在深度1795
6、米左右处选择一胶结好的泥岩层坐套管鞋,。Note:The proposed drilling plan is to set 9-5/8 casing at 1795 m in a claystone-rich zone in the Minghuazhen. 三、地质描述 Geoscience Description Figure 2. PL13-1-1 well prognosis based on seismic interpretation四、套管和固井计划 Casing And Cementing Program1. 20隔水套管和固井计划 20 Casing and Cementin
7、g Program20CasingHole Size(in)Casing Size(in)Weight(lb./ft)GradeThread typeWall(mm)Make-uptorqueDepth(m)2620133K55BTC16.1265CEMENTINGCSG Size (in)Slurry Wt. (SG)Top of cement(m)F/S(m)F/C(m)Centralizer(ea)Remark201.58/1.90ML265253101 Stage备注:固井作业的其它参数,详见固井承包商所作的固井设计。Note: Other operational parameter
8、for cementing job, seeCementing Programprepared by cementing contractor.2.9-5/8套管和固井计划 9-5/8Casing and Cementing Program9-5/8 CasingHole Size(in)Casing Size(in)Weight(lb./ft)GradeThread typeWall(mm)Make-up Torque(lb.ft)Depth(m)12-1/49-5/847N80LTC128929.81795备注:9-5/8套管下入深度以封住明化镇组泥岩和胶结不好的砂岩层段,且套管鞋坐在泥岩
9、层。Note:Run 9-5/8CSG to seal the mudstone and the poorly consolidated sand in Minghuazhen, and setthe casing shoe into the mudstone.CEMENTINGCsg Size (in)Slurry Wt. (SG)Top of cement (m)F/S(m)F/C(m)Centralizer(ea)Remark9-5/81.58/1.89Mudline17951783301 Stage备注:1.9-5/8固井,投顶塞后再打3bbl压塞浆。2.固井作业的其它参数,详见固井承
10、包商所作的固井设计。Note:1. During 9-5/8cement operation , after dropping top plug , pump 3 bbl cement slurry on the plug in case plug rotating while drilling cement.2. Other operational parameter for cementing job, seeCementing Programprepared by cementing Contractor.套管机械性能 Mechanical properties of casing :9
11、-5/8 N80 47 lb./ft 套管下深 1795米:9-5/8N80 47 lb./ft Casing set at 1795m:1) 管体屈服强度: 483(103 daN),安全系数是10.18;Pipe body yield strength: 483(103 daN), Safety factor is 10.182) 抗挤强度: 32.8 MPa,安全系数是16.35;Collapse resistance: 32.8 MPa, Safety factor is 16.35;3) 内屈服压力: 47.3 MPa,安全系数是23.58。 Internal yield press
12、ure: 47.3 MPa, Safety factor is 23.58.说明: 安全系数按全部掏空计算,MW = 1.14 g/cm3Note:The safety factor is accounted in the condition of fulfilling casing with air, MW = 9.5 ppg五、钻具组合 Drill Assembly Program1、26 Hole26BIT + F/V(TOTCO RING)+ 9DCx2 + 26STAB + 9DCx2 + 26STAB +X/O 8DCx6 + 7-3/4F/J + 7-3/4JAR + 8DCx2
13、 + X/O + 5HWDP2、12-1/4 Hole12-1/4PDC + 9-5/8PDM + 12STAB + F/V(TOTCO RING) +8NMDC*1 + 8MWD + 8NMDC*1 + 7-3/4F/J + 7-3/4JAR + 8DCx2 + X/O + 5HWDPx1712-1/4 Rock Bit + 8DCx1 + 12-1/4STAB + 8DCx2 + 12-1/4STAB + 8DCx6 +7-3/4F/J + 7-3/4JAR + 8DCx2 +X/O + 5HWDPx1712-1/4 Rock Bit + 8DCx1 + 12-1/4STAB + 8DCx
14、2 +7-3/4F/J + 7-3/4JAR + 8DCx2 +X/O + 5HWDPx178-1/2 Rock Bit + 6-1/2DCx1 + 8-1/2STAB + 6-1/2DCx2 +6-1/2F/J + 6-1/2JAR + 6-1/2DCx2 + 5HWDPx17备注:1.具体钻具组合将由钻井监督根据现场作相应调整。2.该井所使用的浮阀应是有孔浮阀,以便井控作业。Note: 1. BHA can be adjusted by drilling supervisor on rigsite according to the formation to be drilled throu
15、gh.2. The F/V to be used in this well must be pore-valve in order to perform well-control operation.六、钻头计划 Bit ProgramBit Size (in/mm)Interval (m)Bit TypeIADC CodeQuantity26”220W111111117-1/2”Drill cement plugGJT115L1.1.41*12-1/4”1530G535M3231 MAX-GT111518-1/2”Drill cement plug MX-C11151备注: 现场具体使用的钻
16、头类型将结合现场地质情况,由钻井监督进行调整。Note: The bits that will be run can be changed by drilling supervisor on rigsite according to the formations being drilled through.七、泥浆计划 Mud Properties Program井眼尺寸 Hole Size (in)测量深度Interval MD (m)密度Density(ppg)粘度 Vis(s)失水Water Loss(cc)泥浆类型 Drill Fluid Type26-2708.53045n.cGEL
17、 / Sea Water 12-1/4-17009.0-9.5405512KCL / PLUS 8-1/2-42009.5-10.040555KCL / JLX / PLUS 备注:1.在12-1/4和8-1/2井段,实际使用的泥浆密度将取决于现场监督,考虑的因素包括地层压力地层应力等,以维持井壁稳定为原则。2.在12-1/4和8-1/2井段,现场备加重材料(重晶石粉)40-60吨作为应急压井用。3.在8-1/2井段,泥浆要控制失水,且具有油层保护特性。 Note:1. In 12-1/4hole and 8-1/2 hole section, actual mud weights will
18、be decided by onsite drilling superintendent in order to balance the formation pressure and formation stresses to ensure the well bore stable. 2. In 12-1/4hole and 8-1/2hole section, there should be prepared weighting materials(Barite) 40-60 Tons on site as contingence use.3. In 8-1/2hole section,th
19、e mud must be controlled water loss,and have oil -zone protection property.八、测井计划 Wireline Logging Program 电测为日费作业,所有的电测项目由菲利普斯决定。All E-logging items will be done on dayrate basis and dicided by company.九、弃井计划 Well Abandonment Program1.电测结束后,下5光钻杆至可能的油或水层以下50米处,打水泥塞,其返高要求高于可能的油或水层顶部200米。If there is