《LNG PROCESS SELECTION CONSIDERATIONS FOR FUTURE DEVELOPMENTS-外文翻译原文.docx》由会员分享,可在线阅读,更多相关《LNG PROCESS SELECTION CONSIDERATIONS FOR FUTURE DEVELOPMENTS-外文翻译原文.docx(12页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、外 文 文 献 翻 译(1)译文题目: LNG PROCESS SELECTION CONSIDERATIONSFOR FUTURE DEVELOPMENTS 学生姓名: 学生学号: U201215847 专 业: 建筑环境与设备工程 指导教师: 2016年 3 月LNG PROCESS SELECTION CONSIDERATIONS FOR FUTURE DEVELOPMENTSJohn B. StoneSenior LNG ConsultantDawn L. RymerSenior Engineering SpecialistEric D. NelsonMachinery and Pro
2、cessing Technology SupervisorRobert D. DentonSenior Process ConsultantExxonMobil Upstream Research CompanyHouston, Texas, USAABSTRACTThe history of the LNG industry has been dominated by the constant search for economies of scale culminating in the current Qatar mega-trains undergoing final construc
3、tion, commissioning,start-up and operations. While these large trains are appropriate for the large Qatar gas resources, future, smaller resource developments will necessitate different process selection strategies. The actual LNG process is only one of many factors affecting the optimal choice. The
4、 choice of equipment, especially cryogenic heat exchangers and refrigerant compressors, can overwhelm small differences in process efficiencies. ExxonMobil has been developing a dual mixed refrigerant (DMR) process that has the potential of offering the scalability and expandability required to meet
5、 the needs of new project developments, while also maximizing the number of equipment vendors to allow broader competition and keep costs under control. The process will also have the flexibility to accommodate a wide range of feed compositions, rates, and product sales requirements.BACKGROUNDThe st
6、artup of the 7.8 million tonnes per year (MTPA) trains in Qatar mark the most recent pinnacle in the search for economies of scale in the LNG industry. However, theapplication of these very large trains for general LNG applications is very limited. To produce this amount of LNG requires 42 MSCMD (15
7、00 MSCFD) of feed gas. What is often overlooked in the discussion of large LNG trains is that a resource of about 370 GCM (13 TCF) is needed to support the operation of one such train over a 25-year life. This is nearly as large as the Arun field in Indonesia 425 GCM (15 TCF), which was the backbone
8、 of the LNG plant development in that region. For new LNG developments that are often built with a minimum of two identical trains, a truly world-class resource class of 750 GCM (26 TCF) would be required. Even for resources capable of supporting such large trains, very large gas treating and prepar
9、ation trains with a minimum of parallel equipment are also needed to ensure that economies of scale are not lost in the non-LNG facilities. Given the limited supply of gas resources capable of supporting these large trains, future projects will need to find ways to maintain some cost advantages at s
10、maller capacities. One way to do this is to improve the project execution by selecting a process that gives the maximum flexibility for utilizing compressors, heat exchangers, and drivers with multiple competing vendors. Another desirable feature is using refrigerant as a utility to allow for facili
11、tated expansion if there is a possibility that several resources can be staged for expansion trains.PROCESS COMPARISONLNG process selection has often been highly influenced by the specific power consumption, i.e., refrigerant compression power divided by the train capacity. This is certainly an impo
12、rtant parameter, since refrigerant compressors are the largest single cost and energy consumption components in an LNG train. Conventional wisdom would be that lower specific power consumption would result in lower refrigerant compression costs and additional LNG production from a fixed feed gas rat
13、e. In actuality it is a more complicated picture. Figure 1 plots the specific power consumptions for a variety of liquefaction processes against the number of cycles employed based on consistent conditions.SMR - Single Mixed RefrigerantC3MR - Propane pre-cooled Mixed RefrigerantC3MRN2 - Propane pre-
14、cooled Mixed Refrigerant plus Nitrogen expander cycleCascade - Pure propane, ethylene, and methaneDMR-SWHE - Dual Mixed Refrigerant with single pressure levels and SWHEsDMR-BAHX - Dual Mixed Refrigerant with multiple pressure levels and BAHXsTMR - Triple Mixed RefrigerantFigure 1 - Process Specific
15、Power ComparisonIn general, mixed refrigerant processes are more efficient than pure component processes and additional cycles improve efficiency. However, both of these efficiency improvements come at the expense of increased process complexity.Another factor that complicates the picture above is t
16、hat it only considers a process comparison and not a refrigerant compressor or driver comparison. Differences in compressor efficiency, the need for a speed-increasing gear, or driver efficiency can overwhelm some of the differences shown. Considerations for the generation and distribution of electr
17、ic power for motor driven LNG processes can further complicate the comparison.The LNG industry is changing in a number of areas that can also impact the selection of the best liquefaction process. While stick-built LNG plants are still the norm, modularization of LNG facilities are more attractive f
18、or offshore applications or where labor costs are very high and/or productivity is low. Modular construction is routinely applied for offshore oil processing. However, oil processing is much simpler than LNG production and process selection is generally not an important consideration. All these fact
19、ors point to the need for more compact, lighter mechanical designs.Another important future consideration is the increasing need to reduce greenhouse gas emissions. Aeroderivative gas turbine drivers are an obvious choice for higher thermal efficiency or modular application but are not available in
20、sizes as large as industrial gas turbines. Consequently, a process suitable for large 95 MW industrial gas turbines may not be well suited for a 35 MW aeroderivative gas turbine. Combined-cycle power generation is another option for achieving increased thermal efficiency and can be adapted to any of
21、 these processes, but is not well suited for modular construction or for offshore application due to the additional weight of motors, generators and distribution equipment as well as limited aeroderivative gas turbine choices for very large (100MW) power generators.The value of thermal efficiency ca
22、n also become a more important process selection criterion when the feed gas to the LNG plant is relatively expensive or supply is limited. An efficient process can allow for a reduced cost development plan through a lower gas rate, or extend the gas production plateau from the reservoir to make a m
23、ore profitable project.IMPACT OF EQUIPMENT COSTSOur process research comparing liquefaction processes has demonstrated that the primary difference in the costs for the different liquefaction processes is the choice of equipment utilized. Process licensors tailor their process to make it capital and
24、thermally efficient given the owners preferences and constraints. However, they do not always have control over the cost (both equipment and installation) in the final analysis.Gas TurbinesGas turbine costs exhibit a reasonably high economy of scale. Large industrial gas turbines are the least expen
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- LNG PROCESS SELECTION CONSIDERATIONS FOR FUTURE DEVELOPMENTS-外文翻译原文 DEVELOPMENTS 外文 翻译 原文
链接地址:https://www.taowenge.com/p-29942501.html
限制150内