1、GPS Real-Time Supervisory System and Application in the Construction of Face Rockfill DamHUANG Sheng xiang LIU Jingnan ZENG HuaienABSTRACT According to the quality control needs of filling construction of the face rockfill dam, by means o f the global satellite positioning technology , the wireless
2、data communication technology, the computer technology and the data processing and analysis technology, and integrating with the roller compaction machine, the GPS real-time supervisory system is developed in this paper. It can be used to real-timely supervise the construction quality of the roller
3、compaction for filling engineering. The composition and applied characteristics of GPS system, and the key technique problem and solution of the design are discussed. The height accuracy of GPS system is analyzed and the preliminary application is introduced.KEY WORDS :GPS; filling construction; qua
4、lity control; integrated system; face rockfill damIntroductionAt present , in the quality management of filling construction of the face rockfill dam,the quality control method of “dual controls”is mainly adopted, of which one is manually controling the parameters of roller compaction including thic
5、kness and roughness of filling layer and rolled times and rolled speed o f compaction machines,the other is inspecting the test hole sampling manually in the area. The method play a positive role in promoting domestic development of concrete faced rockfill dam. How ever, the traditional manual manag
6、ement mechanism cant meet the demands of mo- dern mechanized construction and schedule anymore, with increasing of scale of con- crete face rockfill dam. Concrete faced rockfill dam of Shuibuya project in Qing jiang River of Hubei Province, China,ranking first in dam height of the same type in the w
7、orld, is as high as 233 m. The project has a total filling volume of 1. 6 107 m3 and more than 6105 m3 for peak filling volume of a single month, so demands much more to control the quality of filling construction of the dam. For the sake of supervising the filling construction quality quickly in ti
8、me, it is very important to develop a supervisory system of the construction quality of the roller compaction for filling engineering, which has characteristics of real-time, continuity , automation andhigh precision. T he supervisory system has a great meaning for improving the const- ruction quali
9、ty of Shuibuya project .As a brand-new technology of modern spatial satellites navigation and position- ing system,GPS has g radually replaced the normal optical and electrical surveying equipment in more and more fields. Since 1980s, especially after 1990s,GPS techno- logy has lead the spatial posi
10、tioning technology , combining with modern communi- cation technology,to a revolutionary change. The method for simultaneously determ- ineing three dimensional coordinates by GPS has changed the traditional positioning technology from land with inshore to entire ocean and outer space, from statics t
11、o kinematics, from point positioning to network difference, from afterwards processing to real-time positioning and navigation, and absolute and relative positioning prcisi- on coming to meter level, centimeter level, even submillimeter level, therefore, expands the fields of application and effect
12、in every walk of life. The fast development and improvement of modern data communication technology, computer technology, electrical technology and the spatial positioning technology on behalf of GPS make supervision of high precision real-time continuity and automation feasible.According to the req
13、uirements o f construction quality management for roller compaction in filling engineering, by means of the global satellite positioning technology, the wireless data communication technology, the computer technologyand the data processing and analysis technology,and integrating with the roller comp
14、- action machine, in 2004 Wuhan University and Qing jiang Hydroelectric Develop- ment Corp. Ltd. Jointly developed a real-time supervisory system suitable for the quality management needs of roller compaction in filling engineering, i. e. real-timesupervisory system of filling construction quality(
15、GPS system for short afterwards) . The system has comprehensive functions of real-time, high precision, continuity, automation etc. , so can be applied to real-time supervising construction quality of filling compaction for dam, road, protection dike, airport etc. and becomes an effective assistant
16、of ensuring the construction quality for project . Combining with engineering needs and system characteristics, the composition, key techniques and schemes of the system are discussed in this paper. The height accuracy of the system is analyzed and the preliminary application is introduced.1 Composi
17、tion and characteristics of GPS Real-time supervisory system1. 1 Composition of the systemHardware unit of the system mainly includes 3 parts as follows:1) Receiving system of GPS satellite signals;2) Wireless network data communication system;3) Computer system.Fig. 1 Illustration of the system net
18、work structureAccording to the requirements of compaction for filling and ramming enginee- ring and construction quality management to system, the system is composed of supervisory center, network relay station, locale sub-control station,GPS reference station and mobile terminals ( including roller
19、 compaction machines and quality supervisor working vehicle) , regarding the effect of wireless communication from topographic environment. Fig . 1 is the illustration of construction quality supervisory system for filling compaction project . If the topographic environment is good and the distance
20、between the filling construction on-the-spot and the system supervisorycenter is not long, the network relay station can be removed.1. 1. 1 Supervisory centerSupervisory center is the heart of the system,where the differential data of GPS reference station are emitted to the GPS mobile stations, and
21、 at the same time, receiv- es the position information fed back by the mobile stations continuously and real- timely through wireless data communication. Combining the needs of construction,electronic display screen equipped in the supervisory center can real-timely display the accurate moving locat
22、ion and status information of the roller compaction machin- es as well as the quality supervisor working vehicle for compaction planes of the dam, remotely monitor the state of compaction quality of filling engineering, and offer leaders the basis of decision. T he processing , analysis, storage of
23、the system data and so on are carried out in the supervisory center.1. 1. 2 Locale sub-supervisory stationLocale sub-supervisory station is the extension of the system control center, and provides convenience for locale supervisor. By accessing information of the system supervisory center, the super
24、visor can master the status of engineering construction and the construction quality in time just in the construction locale supervisor room.Once quality deviation appears, the supervisor can tackle with the construction side on the construction locale, reminding the constructors and asking them for
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 2021 2022 收藏 精品 资料 毕业论文 英文翻译 GPS 实时 监测
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内