会议主持词例文:经济工作会议主持词.docx
《会议主持词例文:经济工作会议主持词.docx》由会员分享,可在线阅读,更多相关《会议主持词例文:经济工作会议主持词.docx(16页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、会议主持词例文:经济工作会议主持词会议主持词例文:经济工作会议主持词 there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a ru
2、n standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why sync
3、hronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system,
4、 wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator?
5、Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused
6、 by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misu
7、se personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preventing misoperation accident? New operation or after majorrepair of tran
8、sformers why test? Try discussing steps measured with a Megger insulationresistance of electrical equipment? Lu method is used to find DC grounding considerationarewhat? when there are two point grounding with the polarity should be . 1.600MW supercritical supplementary questions, blank mini disk ca
9、n be divided into manual and two oil turbine; oil turbine disc wheel car, the turning speed of the rotor can be controlled at around 80120 RPM (high speed), and it is fulfilled by controlling access to the oil-pressure turbine oil turning on/off and speed level. Medium-speed Coal mill explosion-proo
10、f steam from a wind room, _, _ separator casing into the ground to prevent the mill explosion in the process of starting and stopping. Mill load is to accept current signal to the coal control proportional pressure relief valve size, change of hydraulic accumulators and hydraulic cylinders, to achie
11、ve load changes. Sealed Air for coal pulverizer drive, Rod bearings, roller. Cold wind of a user with a sealed air blower air, sealed air, ground coal to a cold wind. Turbine sealing oil primary oil source is air-side seal oil pump, the first alternate oil sources (mainly alternative oil source) is
12、the main oil pump of turbine. When the primary oil source failure, the first spare source automatic put into operation. Second alternate oil sources primary alternate supply AC electric sealing oil pump on the fuel tank, when the turbine speed is less than 2/3 rated speed or first alternate source f
13、ailure occurs, the second spare source automatic switch. Third alternative oil source is provided by DC sealing oil pump. Main fuel tank exhaust throttle should be located 2 steel closing door operation handwheel locking is not allowed and obvious warning signs should be hung. Steam engine room caug
14、ht fire, when it threatened to tank or fuel system, shall immediately destroy the vacuum emergency stop, and turn on the tank accident put the throttle, speed and control on oil should be appropriate, to ensure that the rotors lubricants are not interrupted before static. Shaft seal overflow overflo
15、w to #8 the low pressure under normal conditions, when #8 the low pressure overflow when the outage to the condenser. Sliding pressure operation of deaerator may avoid deaerator steam source for throttling losses. Normal operation of steam turbine steam distribution mode for steam distribution nozzl
16、e. After the turbines stopped, if the rotor cannot rotate for a short time, rotor _ _ under bending, highest in _ _ highs at this point rotor should be reset, close the hydrophobic _ _ cylinder, keeping _ up and down temperature difference between cylinder _ monitor rotor _ _ deflection, when after
17、you verify that the rotor is, and then manually turning 180 o. When turning the motor over current or rotor disc doesnt move, do not forcibly barring _ _, but can not turn _ forced _ or turning the crane broke. Stop turning _8_ hours later, to stop the lube oil system. Condensate pumps due to transp
18、ortation of saturated water, the pump is most prone to cavitation _ _, therefore is composed of _ inducer _, and at the time of installation ensure the pump inlet has some highly _ _ intrusion, and design _ export recycled _ tubes, also in order to solve this problem. When the condenser when the wat
19、er level is too low _ setting up _ pumps are turned on, into the air to prevent the pump design _ _ seal water, prevent the pump output is not normal. . Threaded tube within a water wall, deterioration of heat transfer does not occur. X turbine cold starts, heat transfer of steam to the cylinder wal
20、l is based on condensation heat transfer and convective heat transfer in two ways at the same time. (X) the furnace higher excess air coefficient, smaller chemical heat loss due to incomplete combustion. () Boiler of soda expansion is inevitable. Start-up incorporations, boiler-DC operation, adjustm
21、ent of main steam temperature control in a coal-water ratio between points. A single swirl burner burning adjacent burners are not required to support. Swirl burners with different rotation direction will affect the boiler steam temperature and load parameters. X boiler steam flow is divided with do
22、uble built-in startup separator designed for community process. During combustion of pulverized coal in boiler, oxygen content, the lower the NOx is produced more. When the gas-water ratio imbalances, once-through boiler steam temperature at each point in the trip will change, and closer to the pop
23、tour entrance, inertia and hysteresis temperature change is smaller. In disguise near the heat transfer coefficient of steam increases to a maximum at first and then quickly lower. Control of start-up separator outlet steam temperature, that controls the boiler heating and evaporation, thermal heat
24、distribution. (X) as the direct current requirements for operation of the boiler feedwater quality was much higher than that of drum boiler, in once-through boiler start-up process, therefore there is no need for furnace washing of Silicon. () UP the boiler is subcritical and supercritical parameter
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 会议 主持 例文 经济工作会议
限制150内