星巴克饮品直营门店工程筹备营建手册 58436-001chigangbei store-第二版DD图纸20130201.pdf
《星巴克饮品直营门店工程筹备营建手册 58436-001chigangbei store-第二版DD图纸20130201.pdf》由会员分享,可在线阅读,更多相关《星巴克饮品直营门店工程筹备营建手册 58436-001chigangbei store-第二版DD图纸20130201.pdf(35页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、ChiGangBei RD.M1822M1522M1822M1522M1522M1822FM1022甲M1022M1422上-0.0500.000-0.150上上0.0000.000上特特同特特特上-1.500-0.050-11-19砌砌突-0.300特特特特商请入口门厅楼梯1详JZ-11扶梯1-4详JZ-19楼梯4详JZ-17商铺开敞楼梯垃圾收集商铺配电间储DT5商铺D439商铺D人 行 道架空空间160个车位商铺1. GENERAL CONTRACTOR SHALL VISIT THE SITE, REVIEW THE BUILDING SHELLDRAWINGS AS SUBMITTED
2、 BY THE LANDLORD OR STARBUCKS SITE SURVEYOR,AND BECOME THOROUGHLY FAMILIAR WITH THE SITE CONDITIONS PRIOR TOBIDDING OR CONSTRUCTION.2. GENERAL CONTRACTOR SHALL CONSULT WITH STARBUCKS CONSTRUCTIONMANAGER TO RESOLVE ANY CHANGES, OMISSIONS, OR PLAN DISCREPANCIESPRIOR TO BIDDING OR CONSTRUCTION.3. ALL W
3、ORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH LOCAL,COUNTY, STATE, AND FEDERAL CODES AND ORDINANCES.4. GENERAL CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UTILITIES.5. GENERAL CONTRACTOR TO VERIFY ALL DIMENSIONS, INCLUDINGCLEARANCES REQUIRED BY OTHER TRADES, AND NOTIFY STARBUCKSCONSTRUCTION MANAG
4、ER OF ANY DISCREPANCIES PRIOR TO PROCEEDINGWITH THE WORK. ALL DIMENSIONS ARE TO THE FACE OF THE FINISHEDSURFACE UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE TAKEN FROMDESIGNATED DATUM POINT. DO NOT SCALE DRAWINGS.6. GENERAL CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING WALLS,FLOORS, CEILINGS, OR OT
5、HER SURFACES IDENTIFIED TO REMAIN THAT MAYBECOME DAMAGED DURING THE COURSE OF THE WORK.7. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR OBTAINING PERMITS FORFIRE PROTECTION, PLUMBING, MECHANICAL, AND ELECTRICAL SYSTEMS PRIORTO INSTALLATION OF SUCH SYSTEMS.8. GENERAL CONTRACTOR SHALL RETAIN ONE SET OF TH
6、E PLANS TO NOTEAND DOCUMENT ALL CHANGES DURING CONSTRUCTION. THIS SET SHALL BEA PART OF THE GENERAL CONTRACTORS “STORE CLOSE-OUT PACKAGE” ASDESCRIBED IN THE CONSTRUCTION MANAGEMENT AGREEMENT.9. GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING DELIVERY OFMATERIALS FROM STARBUCKS CONTRACTED THIRD PA
7、RTY LOGISTICSDISTRIBUTION SERVICES AND VENDOR DIRECT SHIPMENTS. REFER TOCONSTRUCTION MANAGEMENT AGREEMENT FOR METHODS AND LEAD TIMES.10. RESPONSIBILITY FOR SUPPLY AND DELIVERY OF MATERIALS ANDEQUIPMENT IS IDENTIFIED IN THE DRAWING SCHEDULE SHEETS UNDER THECOLUMN LABELED RESPONSIBILITY.11. FOR THE PU
8、RPOSE OF THE DOCUMENTS, TO “INSTALL”, SHALL MEAN TOPROVIDE ALL FASTENERS, MISCELLANEOUS HARDWARE, BLOCKING,ELECTRICAL CONNECTIONS, PLUMBING CONNECTIONS, AND OTHER ITEMSREQUIRED FOR A COMPLETE AND OPERATION INSTALLATION, UNLESSOTHERWISE NOTED.12. ALL ITEM SUBSTITUTIONS MUST BE APPROVED BY THE STARBUC
9、KSDESIGN MANAGER.13. REFER TO ITEM CUTSHEETS FOR ADDITIONAL INFORMATION.GENERAL NOTESVICINITY PLANMAILINGADDRESS:DESIGNMANAGER:Starbucks Coffee Company2401 Utah Avenue SouthMS Stop: S-SD10Seattle, Washington 98134(206) 318-1575Vivi LeeStarbucks (China) Company Limited10th floor Innovation Builiding
10、1009Yishan RoadShanghai/200233 P.R.China86 21 2412 5916 Phone86 21 2412 3260 FaxPROJECT CONTACTSINDEX OF SHEETSROOM SCHEDULE上海汉思建筑设计事务所上海汉思建筑设计事务所HSarchitectsHSarchitectsPROJECT NAME:PROJECT ADDRESS:DESIGN DEVELOPMENT ONLY - NOT INTENDED FOR CONSTRUCTIONRC 2011 STARBUCKS COFFEE COMPANY2401 UTAH AVEN
11、UE SOUTHSEATTLE, WASHINGTON 98134(206) 318-1575STARBUCKS COFFEECOMPANYTHESE DRAWINGS AND SPECIFICATIONS ARECONFIDENTIAL AND SHALL REMAIN THE SOLEPROPERTY OF STARBUCKS CORPORATION,WHICH IS THE OWNER OF THE COPYRIGHT INTHIS WORK. THEY SHALL NOT BE REPRODUCED(IN WHOLE OR IN PART), SHARED WITH THIRDPART
12、IES OR USED IN ANY MANNER ON OTHERPROJECTS OR EXTENSIONS TO THIS PROJECTWITHOUT THE PRIOR WRITTEN CONSENT OFSTARBUCKS CORPORATION. THESE DRAWINGSAND SPECIFICATIONS ARE INTENDED TOEXPRESS DESIGN INTENT FOR APROTOTYPICAL STARBUCKS STORE (WHICH ISSUBJECT TO CHANGE AT ANYTIME) AND DO NOTREFLECT ACTUAL S
13、ITE CONDITIONS. NEITHERPARTY SHALL HAVE ANY OBLIGATION NORLIABILITY TO THE OTHER (EXCEPT STATEDABOVE) UNTIL A WRITTEN AGREEMENT IS FULLYEXECUTED BY BOTH PARTIES.SHEET NUMBER:SHEET TITLE:SCALE:STORE #:CONCEPT:PROJECT #:PALETTE:ISSUE DATE:DESIGN MANAGER:PRODUCTION DESIGNER:CHECKED BY:RLEED AP:当作作作2013
14、-2-1 13:37:39 N:当当当当当当_相相相相201206星星星2专专I室室201206-17 Guangzhou ZS Chigangbei store58436-001Revit58436-001chigangbei store.rteG-0001GENERALINFORMATION58436-0012013.01Guangzhou Chigangbei StoreNo.18 North Chigang road, Haizhu district, GZMCSHeritageVivi LeeEmma Zhuang / HSaEmma ZhuangNAMEAREABackbar18
15、mCafe Seating77 mOutdoor Seating69 mWash Room5 mWork Room14 m总总183 mSHEETSHEET TITLEGENERALG-0001GENERAL INFORMATIONG-0010DESIGN SPECIFICATIONSG-0011DESIGN SPECIFICATIONSG-0012DESIGN SPECIFICATIONSG-0013DESIGN SPECIFICATIONSARCHITECTURALA-0001ARCHITECTURAL INFORMATIONA-1001ARCHITECTURAL SITE PLANA-2
16、001EXTERIOR ELEVATIONSA-2002EXTERIOR ELEVATIONSINTERIORSI-1101DEMOLITION FLOOR PLANI-1103FLOOR PLANI-1105FF AND E PLANI-1106FF AND E SCHEDULESI-1107CASEWORK PLANI-1108REFLECTED CEILING PLANI-1109FLOOR FINISH PLANI-1111WALL FINISH PLANI-2101INTERIOR ELEVATIONSI-2102INTERIOR ELEVATIONSI-2103INTERIOR E
17、LEVATIONSI-2104INTERIOR ELEVATIONSI-2105INTERIOR ELEVATIONSI-5001DESIGN DETAILSI-50023D View 01I-50033D View 02I-6001SCHEDULESI-6002SCHEDULESPLUMBINGP-0001PLUMBING SPECIFICATIONSP-1101PLUMBING DESIGNP-5001PLUMBING DETAILSMECHANICALM-0001MECHANICAL SPECIFICATIONSELECTRICALE-0001ELECTRICAL SPECIFICATI
18、ONSE-1102ELECTRICAL DESIGNE-1103LIGHTING DESIGNE-5001ELECTRICAL DETAILSRevision ScheduleRevDateByDescriptionSECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL1.1SUMMARYA.SALVAGING NONHAZARDOUS DEMOLITION AND CONSTRUCTION WASTE.B.RECYCLING NONHAZARDOUS DEMOLITION AND CONSTRUCTION WASTE.C.DIS
19、POSING OF NONHAZARDOUS DEMOLITION AND CONSTRUCTION WASTE.1.2DEFINITIONSA.CONSTRUCTION WASTE: BUILDING AND SITE IMPROVEMENT MATERIALSAND OTHER SOLID WASTE RESULTING FROM CONSTRUCTION, REMODELING,RENOVATION, OR REPAIR OPERATIONS. CONSTRUCTION WASTE INCLUDESPACKAGING.B.DEMOLITION WASTE: BUILDING AND SI
20、TE IMPROVEMENT MATERIALSRESULTING FROM DEMOLITION OR SELECTIVE DEMOLITION OPERATIONS.C.DISPOSAL: REMOVAL OFF-SITE OF DEMOLITION AND CONSTRUCTIONWASTE AND SUBSEQUENT SALE, RECYCLING, REUSE, OR DEPOSIT INLANDFILL OR INCINERATOR ACCEPTABLE TO AUTHORITIES HAVINGJURISDICTION.D.RECYCLE: RECOVERY OF DEMOLI
21、TION OR CONSTRUCTION WASTE FORSUBSEQUENT PROCESSING IN PREPARATION FOR REUSE.E.SALVAGE: RECOVERY OF DEMOLITION OR CONSTRUCTION WASTE ANDSUBSEQUENT SALE OR REUSE IN ANOTHER FACILITY.F.SALVAGE AND REUSE: RECOVERY OF DEMOLITION OR CONSTRUCTIONWASTE AND SUBSEQUENT INCORPORATION INTO THE WORK.1.3PERFORMA
22、NCE REQUIREMENTSA.END-OF-PROJECT RATES FOR SALVAGE/RECYCLING: 50 75 PERCENT.1.4ACTION SUBMITTALSA.WASTE MANAGEMENT PLAN: SUBMIT PLAN WITHIN 7 DAYS OF DATEESTABLISHED FOR COMMENCEMENT OF THE WORK.1.TYPES AND QUANTITIES OF DEMOLITION AND CONSTRUCTIONWASTE.2.TYPE OF WASTE AND WHETHER IT WILL BE SALVAGE
23、D, RECYCLED,OR DISPOSED OF IN LANDFILL OR INCINERATOR.3.NET ADDITIONAL COST OR NET SAVINGS RESULTING FROM WASTEMANAGEMENT PLAN.1.5INFORMATION SUBMITTALSA.WASTE REDUCTION PROGRESS REPORTS: CONCURRENT WITH EACHAPPLICATION FOR PAYMENT, SUBMIT REPORT INDICATING TYPE OF WASTEAND WHETHER IT HAS BEEN SALVA
24、GED, RECYCLED, OR DISPOSED OF INLANDFILL OR INCINERATOR.B.WASTE DISPOSAL RECORDS: INDICATE RECEIPT AND ACCEPTANCE OFWASTE MATERIAL BY ACCEPTING AND PROCESSING FACILITIES LICENSEDTO ACCEPT THEM. INCLUDE MANIFESTS, TYPE OF MATERIAL, WEIGHT ORVOLUME TICKETS, RECEIPTS, AND INVOICES.C.LEED SUBMITTAL: CWM
25、 REPORTING TEMPLATE, TABULATING TOTALWASTE MATERIAL, QUANTITIES DIVERTED AND MEANS BY WHICH IT ISDIVERTED, AND STATEMENT THAT REQUIREMENTS FOR THE CREDIT HAVEBEEN MET.1.6RECYCLING WASTEA.RECYCLING INCENTIVES: REVENUES AND OTHER INCENTIVES FORRECYCLING WILL ACCRUE TO OWNER.END OF SECTION 017419SECTIO
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 星巴克饮品直营门店工程筹备营建手册 58436-001chigangbei store-第二版DD图纸20130201 巴克 饮品 直营 工
链接地址:https://www.taowenge.com/p-32450954.html
限制150内