1、地铁工程设计阶段造价控制措施分析严红霞摘 要:地铁工程是一项建设成本大、投资回收慢的大型基础设施建设项目,高昂的造价已经制约了地铁工程的可持续发展,如何有效控制工程造价成为工程建设者关心的问题。本文结合地铁工程设计阶段工作内容和工程程序,从技术和管理两个维度详细分析了设计阶段造价控制措施。关键词:城市轨道交通规划设计造价 控制措施Analysis of Cost Control Measures in the Design Stage of Metro Engineering Yan Hongxia Abstract :The subway project is a large-scale i
2、nfrastructure construction project with high construction cost and slow investment recovery. The high cost has restricted the sustainable development of the subway project. How to effectively control the project cost has become a concern of the project builders. This article combines the work conten
3、t and engineering procedures of the subway engineering design stage , and analyzes the cost control measures in the design stage in detail from the two dimensions of technology and management. Key words:urban rail transit, planning and design, cost , control measures 1 引言随着我国经济社会的迅速发展,地铁以舒适、快捷、准时等优势
4、成为解决城市交通拥堵问题、提升城市品位和城市现代化竞争力的重要选择1 。在“十二五”、“十三五”期间,我国的城市轨道交通得到了飞速的发展,截止到2020年年底,全国在建线路总规模6797.5 公里,建设投资再创历史新高。但是,地铁工程是一项建设成本大、投资回收慢的大型基础设施建设项目,巨大的工程投资制约了城市轨道交通的可持续发展2-3 。国内外很多学者、工程技术人员在城市轨道交通造价控制研究取得丰富的成果,但是由于工程的复杂性,大多数研究成果集中在施工阶段的造价控制,对于设计阶段如何进行造价控制研究较少4-5 。本文结合地铁工程设计阶段工作内容和工程程序,分析设计阶段造价影响因素,针对性的提出
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 地铁 工程设计 阶段 造价 控制 措施 分析
限制150内