2022项目管理师考试真题及详解5卷.docx
《2022项目管理师考试真题及详解5卷.docx》由会员分享,可在线阅读,更多相关《2022项目管理师考试真题及详解5卷.docx(23页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、2022项目管理师考试真题及详解5卷2022项目管理师考试真题及详解5卷 第1卷 Using the situation stated in the Special window, what is net present value of an annual income flow of $1600 at 14% over the next three years?A . ¥3,713.60B . ¥0.68C . ¥1,080.00D . ¥476.19E . ¥2.32正确答案:A 币值波动,政治动荡,中央和地方政府之间的竞争,以及不同利益集团之间的冲突可能会干扰国际项目的管理。管理国际项
2、目的项目奖励应该意识到跨文化环境的主要影响因素,并特别重视:A建立绩效报告制度B建立沟通管理系统C建立和执行生产进度表以方便信息分配,避免在定期会面之间出现情况的变化D通过翻译服务起草正式的项目报告正确答案:B 146 Which is not a negotiation tactic?A. Imposing deadlinesB. surprisesC. person with authority is absentD. reasoning togetherE. all are negotiations tactics正确答案:E 162 According to labor law, wh
3、ich of the following management actions are prohibited during a union organizing drive?A. Forbidding employees from distributing union literature in working areasB. Implementing previously scheduled pay raisesC. Forbidding unions from soliciting workers during working hoursD. Circulating anti-union
4、petitionsE. All of the above正确答案:D 134 Good project objectives must be:A. General rather than specificB. Established without considering resource boundsC. Realistic and attainableD. Overly complexE. Measurable, intangible and verifiable正确答案:C 你在管理一个有5个分包商的合同。你必须管理合同绩效、付款及管理与供应方的关系。一个分包商发出了变更其工作范围的请求
5、。你检查了这一请求后决定修改合同。所有这些活动都是以下 的一部分?( )A合同管理B合同执行C合同格式D合同方案正确答案:A 李经理被任命为一个项目的领导他必须要仔细检查由客户提供的工作说明下列哪一项是最容易被忽视的 ( )A数据类可交付成果B应由客户提供的设备设施C长期的采购项D客户确定的里程碑E其它分合同方的配合需求正确答案:A 25 Obtaining team commitment depends on:A. clear and interesting job assignmentsB. consensus on project goalsC. involvement in devel
6、oping task objectivesD. All of the above.E. B and C正确答案:E A contractor estimates that a project has a 0.5 probability of $200,000 profit and 0.3 probability of $50,000 loss. The expected monetary value of this project is:A ¥200,000B ¥150,000C ¥85,000D ¥50,000E None of the above.正确答案:C2022项目管理师考试真题及详
7、解5卷 第2卷 Once the logic of a network is laid out, the project manager will conduct a forward pass and backward pass through the network. This will provide information on the _ and identification of the _ .A.Slack for each activity, critical path.B.Slack for each activity, high risk activities.C.Manpo
8、wer shortages, high risk activities.D.High risk activities, non-critical paths.E.Manpower availability, contingency plans.正确答案:AA The most common types of schedules are Gantt charts, milestone charts, line of balance, and:A.Networks.B.Time phased events.C.Calendar integrated activities.D.A and C onl
9、y.E.B and C only.正确答案:AA 你正在管理通信项目。客户,你的上级、客户和其它有关各方都已经确定和批准了产品和系统要求。项目按照时间表实施。到目前为止似乎每个人对进展感到满意。你刚刚得知一个新的管理规定将引起一个项目执行标准发生变更。为保证该变更包括在项目计划中,你应该:( )A召开变更控制委员会会议B修改WBS项目时间表和项目计划,以反映新的规定和要求C准备变更请求D立即通知受到影响的各位干系人有关项目实施的变更内容正确答案:C The comprehensive review of a contractors technical performance, cost per
10、formance, and delivery schedule, is referred to as:A post project evaluationB post contract evaluationC post mortemD procurement performance evaluationE contractors performance evaluation正确答案:E 26 Job descriptions are examples of _communications.A. upwardB. downwardC. horizontalD. diagonalE. None of
11、 the above正确答案:E 125 Using the situation stated in the Special window, what is the total price variance for direct material?A. $140.00B. $736.00C. $0.02D. -$350.00E. $5850.00正确答案:B Since risk is associated with most projects, the best course of action is to:A cover all project risks by buying approp
12、riate insuranceB ignore the risks, since nothing can be done about them and move forward with the project in an expeditious manner.C avoid projects with clear and present risksD eliminate all known risks prior to the execution phase of the projectE identify various risks and implement actions to mit
13、igate their potential impact正确答案:E 当需要减少20%关键路径时间时,你可以采取下列的行动,但-除外?( )A增加资源B加速时间进度C消除浮动时间D并行安排活动正确答案:C 合同中的激励条款的作用是:A、 增加买方成本B、 通过增加成本提高项目质量C、 把风险转移给买方降低卖方的风险D、 改进合同、协调买卖双方目标的途径正确答案:D2022项目管理师考试真题及详解5卷 第3卷 Adding 5 people to a 4 person team increases the communication channels by a factor of:A 2 tim
14、esB 3 timesC 4 timesD 5 timesE 6 times正确答案:E 141 To calculate the expected value of an outcome:A. divide the value of each outcome by its probability, then add the results.B. divide the value of the desired outcome by the value all possible outcomesC. multiply the value of each outcome by its probab
15、ility, then add the resultsD. use linear regression to assess the expected value of the outcomeE. B and D only正确答案:C 164 A line manager possesses information which the project team needs, but withholds the information. The results in a(n):A. BlindspotB. FacadeC. region of influenceD. Communication p
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 2022 项目 管理 考试 详解
限制150内