1、-建筑施工英语常用对话-第 27 页建筑安装施工英语常用对话第一部分 专业会话第一课At a Construction Site在建筑工地上第二课Conversation about Construction of Water SupplyPipe, Central Heating and Air-condition 水、暖、空调施工会话第三课Conversation with Pipe Fitter管道技工会话第四课Conversation about Riveters Engineering铆工施工会话第五课Conversation about Welding 焊接会话 第六课Conver
2、sation with Fitters安装钳工会话第七课Signals and Conversation about Hoisting and Mounting 吊装信号及会话第八课Transportation运输第九课Safety安全第十课Accident事故第十一课Conversation about the Installation of PetroleumMachinery石油机械安装会话第十二课Drawings图纸第十三课Scaffolds脚手架第十四课Isolation and Thermal Insulation隔绝、保温第十五课Anticorrosion防腐第一课 At a C
3、onstruction Site 在建筑工地上A:Ill take you to the construction site.我带您去建筑工地,Follow me, please.请跟我走。B:Thank you.谢谢您。A: Here we are. 到了。B: Can you introduce me to the section chief on the building site? 您能介绍我同这个工地的工长认识吗?A:Certainly. 当然可以This is a Chinese builder, Wang Lin.这是中国建筑工人,王林。C: How do you do. Im
4、glad to meet you. 您好.认识您我很高兴。A: This is section chief, Mr. S.这是工长,S先生。B: How do you do. Im glad to meet you, too .您好.认识您我也很高兴。C: Welcome to our building site.欢迎您来到我们工地。How long will you work here? 您将在这工作多长时间?B: About two years.大约两年Would you introduce me to some of the workers?请您介绍我同一些工人认识好吗?C: Certa
5、inly.当然可以.Hello, fellow workers!喂, 伙伴们!This is our new fellow,这是我们的新伙伴!A Chinese worker, Mr. Wang.中国工人,王先生.D,E,F, G.How do you do, Mr. Wang!王先生,您好!B: How do you do!您们好!Shall we start?我们开始吧!C: Yes, please.好,请吧!Here is the wood.这是木材(red bricks, mixed cement).(红砖搅拌好的水泥).B: Is that hoist made in Yemen?那
6、台卷扬机也是也门制造的吗?C: Yes. But that crane over there is made in Japan.是的.但是,那边那台起重机是日本制造的.B: I think, in Yemen there are many prefabricated houses like this building.我想, 在也门,有许多像这栋搂这样的预制装配式房屋.C: Yes. The prefabricated components are all made in the casting yard.是的,这种预制厂制造的.B: I think so.我也是那样想的.A: Stop pl
7、ease. Now, time for rest.请停下来.现在休息时间到了.第二课 Conversation about Construction of Water Supply Pipe, Central Heating and Air-condition水,暖,空调施工会话A: Before installing the water supply pipe, you ought to inspect and clean it inside.上水管安装前,里边应检查和清扫一下.B: Yes, we have done that.是,我们已经都做过了.A: Before mounting t
8、he iron casting pipes, you should test the hydraulic pressure one by one,and then clean them.铸铁管安设前,要逐根试水压和清扫.B: Yes, were doing that job.是,我们正在进行中.A: What is your idea about the height of the bathtub were installing?浴盆安装高度这样可以吗?B: Lift 50 mm. Higher, please.再抬高50毫米吧?A: Why was the cover of the stoo
9、l not fixed?坐便盖为何没安装?B: Customarily, it should be fixed after theinternal plastering.习惯上,应放在室内粉饰工程完了后再安.A: The flange of the ventilating pipeline is well joined. But the nuts are not completely on the same side.风管道的法兰连接很好,只是螺帽没有完全在同一面.B: Ill correct it at once.我马上纠正过来.A: May the ventilator have a tr
10、ial run?通风机可以试车吗? B: No. First you may check it up and then start it.不,先做一下检查,然后再启动. 第三课 Conversation with Pipe Fitter管道技工会话A: Are you a pipe fitter?您是管道技工吗?B: Yes.是的.A: How many years standing have you?您有几年工龄?B: I have been engaged in pipe engineeringwork for eight years.我已经从事管道工作八年了.A: When will t
11、he pipe engineering project of this workshop be completed?这个车间的管道工程何时竣工?B: It will be completed in three more days. And then it will undergo the stage of systematic testing pressure.再有三天就可结束,然后进入系统试压阶段.A: Please disassemble the connective of the pumpand the pipe flange. I want to check it up.请您把泵出口法
12、兰与管道法兰连接的螺栓拆开.我检查一下.B: Yes, O.K.好吧.A: There should be a blind flange between the two flanges here. In state of freedom, stagger joint shouldnt happen.应当有盲板.处于自由状态时,不应有错口现象.B: Yes, Ill put the blind flange in and repair it at once.是,我马上加盲板和修理.A: An overhanging support should be added here.此处应添加一个悬臂支架
13、.B: You ought to fix a steel plate on the reinforced concrete pile with a expansion bolt and thenweldand angle steel support on the steel plate, shouldnt you?在钢筋砼柱上用膨胀螺栓固定住一块钢板.A: Yes, all right. Please do this way.好,可以.就这么办.How about the valve installed?阀门安装的怎样?B: The position and direction are cor
14、rect, conjunction is flexible and accurate.位置和方向正确,连接牢固,操作灵活,准确.A: The pressure in piping system has risen to 15 kilogram per square centimeter.Please check up.管路系统已经升压至15kg/cm2, 请检查.B: Is the water filled in according to the network drawing?按网络图充水吗?A: Yes. Ive checked up all such things as blind fl
15、ange and discharge valves which should be added, valves which should be closed, the instruments and meters which should be replaced. All are right.是的.该加的盲板和放空阀,该关的阀门,该换的仪表都做了检查.全部正确无误.B: Well, lets start checking up once again.那么,我们开始检查吧!第四课 Conversation about Riveters Engineering 铆工施工会话A: Please ch
16、eck up. Is my lofting method correct?请检查一下,我的放样方法对吗?B: Yes. Thats right. Its very good是的,很好.A: Why didnt you make a groove before welding?为什么不开坡口,就焊接呢?B: I think that generally the butt welding Of plate which is thiner than 6 mm. May be done by hand welding. Whats your idea?我认为,6毫米以内的较薄板材的对接,一般以手工焊是
17、可以的.您的意见怎样?A: Please measure the thickness of the plate.请量一下板厚.B: This is a plate of 4 mm. Thickness.这是4毫米的板材.A: You may weld it then.那么就可以焊了.The steel column has some windings.钢柱有些弯曲,Youd better straighten it.要轿直一下.B: The flame correcting method may be used?可以用火焰矫正法吗?A: No.不可以.B: Then correct it wi
18、th the straightener.那么就用机械矫正.A: In installing the steel column, how many mm. Are the deviation range of elevation and perpendicularity?钢柱安装,标高和垂直度偏差范围是多少?B: The elevation deviation is in the range plus 5 to minus 5 mm. .标高偏差范围是5毫米.The perpendicularity deviation range is: when the column length is sh
19、orter than 10 meters,垂直偏差范围是: 柱长10米以内的,10mm are allowed;容许10毫米.if the column length is longer than 10 meters, 如柱长大于10米,is by H per1000, 则按H/1000,but it must be less than 35 mm.但不得大于35毫米.A: Please give the standards of the preheat before welding and those of the heat-treatment after welding.请您提供焊前预热和
20、焊后预热处理的规范.B: Please refer to the standard of American Petroleum Institute请参照美国石油学会(API)的规范.A: How do you plan to mount the floating ?top oil-tank.您们打算如何安装浮顶式油罐?B: If the source of water is ample, we prepare to constructby adopting water-floating inverted mounting method.如果水源充足的话,我们准备采用水浮倒装法施工.A: The
21、 cost of water is too expensive, isnt it?水的成本太高吧!B: Machine hoisting inverted installation method may be adopted, too.也可以采用机械提升倒装法.第五课 Conversation about Welding焊接会话A: Have you a welders certificate?您有焊工合格证吗?B: Yes, I have obtained a certificate of versatile position welding.是的,我已经取得了全位置焊接合格证.A: Wha
22、t requirements are there for pipeline welded seams?管道焊缝有何要求?B: We must have the records of all the welded seams and the 10%roentgenoscopic selective examination. 所有焊缝都要有记录,并且要有10%的X射线的抽查.A: This welded seam is found an obvious air hole and an unqualified undercut with macroscopic check.这个焊口以宏观检查发现明显
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 建筑 施工 英语 常用 对话 27
![提示](https://www.taowenge.com/images/bang_tan.gif)
限制150内