A13主要施工设备进场报审表(3页).doc
《A13主要施工设备进场报审表(3页).doc》由会员分享,可在线阅读,更多相关《A13主要施工设备进场报审表(3页).doc(3页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、-A13主要施工设备进场报审表主要施工设备进场报审表Major Construction Equipment Mobilization Approval Request工程名称 Works Title: 安徽金桐精细化学有限公司7万吨/年多品种新型表面活性剂项目编号 Item No: 致南京金陵石化工程监理有限公司(监理单位)To (CS/CMC)我方承担的安徽金桐精细化学有限公司7万吨/年多品种新型表面活性剂项目工程,按合同规定的主要施工设备、机具及检测设备、工具拟进场,并经自检合格,请查验。We contracted the works, we are going to mobilize
2、the major construction equipment and tools as well as the inspection equipment and tools specified by the contract, after the self inspection, they are on spec, please inspect.附Attached:主要施工机械设备一览表主要施工检测器具一览表承包单位(章)Contractor(Chop)项目经理Project manager 日 期Date 审查意见 Review comments:经检查上述施工设备、机具及检测设备、工具
3、,符合/不符合施工组织设计文件和相关要求,准许/不准许进场。According to our inspection, the above equipment, tools and the inspection equipment and tools meet/do not meet the requirements of the construction organization design documents and other rules, site mobilization allowed /site mobilization not allowed.不准许进场原因如下:The reasons for not allowing site mobilization are listed below:项目监理机构CS/CMC 总/专业监理工程师Chief/discipline supervision engineer 日 期Date -第 3 页SH/T 3903-A.13
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- A13 主要 施工 设备 进场 报审
限制150内