英文文献及翻译(计算机专业)(12页).doc
《英文文献及翻译(计算机专业)(12页).doc》由会员分享,可在线阅读,更多相关《英文文献及翻译(计算机专业)(12页).doc(12页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、-英文文献及翻译(计算机专业)-第 11 页NET-BASED TASK MANAGEMENT SYSTEMHector Garcia-Molina, Jeffrey D. Ullman, Jennifer WisdomABSTRACTIn net-based collaborative design environment, design resources become more and more varied and complex. Besides common information management systems, design resources can be organi
2、zed in connection with design activities.A set of activities and resources linked by logic relations can form a task. A task has at least one objective and can be broken down into smaller ones. So a design project can be separated into many subtasks forming a hierarchical structure.Task Management S
3、ystem (TMS) is designed to break down these tasks and assign certain resources to its task nodesAs a result of decomposition.al1 design resources and activities could be managed via this system.KEY WORDS:Collaborative Design, Task Management System (TMS), Task Decomposition, Information Management S
4、ystem1 IntroductionAlong with the rapid upgrade of request for advanced design methods, more and more design tool appeared to support new design methods and forms. Design in a web environment with multi-partners being involved requires a more powerful and efficient management system .Design partners
5、 can be located everywhere over the net with their own organizations. They could be mutually independent experts or teams of tens of employees. This article discusses a task management system (TMS) which manages design activities and resources by breaking down design objectives and re-organizing des
6、ign resources in connection with the activities. Comparing with common information management systems (IMS) like product data management system and document management system, TMS can manage the whole design process. It has two tiers which make it much more f1exible in structure.The 1ower tier consi
7、sts of traditional common IMSS and the upper one fulfills logic activity management through controlling a tree-like structure, allocating design resources and making decisions about how to carry out a design project. Its functioning paradigm varies in different projects depending on the projects sca
8、le and purpose. As a result of this structure, TMS can separate its data model from its logic mode1.It could bring about structure optimization and efficiency improvement, especially in a large scale project.2 Task Management in Net-Based Collaborative Design Environment Evolution of the Design Envi
9、ronmentDuring a net-based collaborative design process, designers transform their working environment from a single PC desktop to LAN, and even extend to WAN. Each design partner can be a single expert or a combination of many teams of several subjects, even if they are far away from each other geog
10、raphically. In the net-based collaborative design environment, people from every terminal of the net can exchange their information interactively with each other and send data to authorized roles via their design tools. The Co Design Space is such an environment which provides a set of these tools t
11、o help design partners communicate and obtain design information. Code sign Space aims at improving the efficiency of collaborative work, making enterprises increase its sensitivity to markets and optimize the configuration of resource. Management of Resources and Activities in Net-Based Collaborati
12、ve EnvironmentThe expansion of design environment also caused a new problem of how to organize the resources and design activities in that environment. As the number of design partners increases, resources also increase in direct proportion. But relations between resources increase in square ratio.
13、To organize these resources and their relations needs an integrated management system which can recognize them and provide to designers in case of they are needed.One solution is to use special information management system (IMS).An IMS can provide database, file systems and in/out interfaces to man
14、age a given resource. For example there are several IMS tools in Co Design Space such as Product Data Management System, Document Management System and so on. These systems can provide its special information which design users want.But the structure of design activities is much more complicated tha
15、n these IM S could manage, because even a simple design project may involve different design resources such as documents, drafts and equipments. Not only product data or documents, design activities also need the support of organizations in design processes. This article puts forward a new design sy
16、stem which attempts to integrate different resources into the related design activities. That is task management system (TMS).3 Task Breakdown Model Basis of Task BreakdownWhen people set out to accomplish a project, they usually separate it into a sequence of tasks and finish them one by one. Each
17、design project can be regarded as an aggregate of activities, roles and data. Here we define a task as a set of activities and resources and also having at least one objective. Because large tasks can be separated into small ones, if we separate a project target into several lowerlevel objectives, w
18、e define that the project is broken down into subtasks and each objective maps to a subtask. Obviously if each subtask is accomplished, the project is surely finished. So TMS integrates design activities and resources through planning these tasks.Net-based collaborative design mostly aims at product
19、s development. Project managers (PM) assign subtasks to designers or design teams who may locate in other cities. The designers and teams execute their own tasks under the constraints which are defined by the PM and negotiated with each other via the collaborative design environment. So the designer
20、s and teams are independent collaborative partners and have incompact coupling relationships. They are driven together only by theft design tasks. After the PM have finished decomposing the project, each designer or team leader who has been assigned with a subtask become a 1ow-class PM of his own ta
21、sk. And he can do the same thing as his PM done to him, re-breaking down and re-assigning tasks.So we put forward two rules for Task Breakdown in a net-based environment, incompact coupling and object-driven. Incompact coupling means the less relationship between two tasks. When two subtasks were co
22、upled too tightly, the requirement for communication between their designers will increase a lot. Too much communication wil1 not only waste time and reduce efficiency, but also bring errors. It will become much more difficult to manage project process than usually in this situation. On the other ha
23、nd every task has its own objective. From the view point of PM of a superior task each subtask could be a black box and how to execute these subtasks is unknown. The PM concerns only the results and constraints of these subtasks, and may never concern what will happen inside it. Task Breakdown Metho
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 英文 文献 翻译 计算机专业 12
限制150内