2022年高中生物选修知识点总结 3.docx
《2022年高中生物选修知识点总结 3.docx》由会员分享,可在线阅读,更多相关《2022年高中生物选修知识点总结 3.docx(9页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、精品_精品资料_1, and prepare d accordi ng to 1.1, and thermal power e ngine ering started debugging w ork provi des 1.2, a nd thermal power pow er plant construction engi neering started and the complete d accepta nce procedures 1.3, and thermal power unit started steamBlow pipe guide is 1.4, an d thermal
2、 powe r engineeri ng adjustment try shipped quality test and the eval uation standard 2, a nd # 1 furna ce started debugging orga nization measures and the relate d provi des 2.1, and organi zation Divisi on: for g uarantee wi de up thermal power plant #1 fur nace started de buggi ng and the part st
3、eam machi ne system of smooth vote d shipped, spe cial establi she d #1 fur nace try shipped professi onal gr oup, members foll owing: l eader : Deputy Lea der: supe rvision: cr ew: wi de up try shi ppe d personnel: wi de up acce ptance personnel: 2.2, a nd debugging, a nd try shipped conte nt: boil
4、er a uxiliary machine Divi sion debugging el ectric dust of Division try turne d and the debugging baking furnace Cook furna ce boiler r ushed tube, a nd bl ow sw eep security door check 2.3, and operation provi des a nd the Divisi on: # 1 furna ce de buggi ng, nd try shi pped by #1 fur na ce try sh
5、i ppe d professional group requirements for, w hi ch single try tur ned a nd Divi sion try shi ppe d by xD three compa ny led is re sponsible for. all moving operation operation must be i n strict a ccordance wit h the pri or aut horizati on of the #1 boiler commissi oni ng professional worki ng gro
6、up, and after starting, the test command- appr oved #1 fur nace steps in the test programme, event of temporary cha nges be reported to headqua rters approval. commissio ning, trial operati on pr oce ss is re quire d for each project by Northw est electri c power constr ucti on compa ny ready equipm
7、ent i nstallation records, a nd fill in t he test applicati on form, the a a nd b side s after passi ng the che cks, fill in partial commissioning che cking before a visa, reporte d hea d of the approval, carried out by the leader of unified com mand. A bouteach a ction are made by t he leader of a
8、unified command, operation after the report to the team leader.Without the Direct ors consent shall not unilaterally make any startupoperati on, such as si ngle operations, w ho i s responsibl e for all security r esponsibilities, wit h no tie s to the other si de. all before the first turn of the m
9、otor, must be a ppr oved by both parties a common r oll insulati on measurement ca n be carried out pr operl y. After the end of each pr oject commissi oni ng, fill in parti al a cceptance visa trial shi pments. As mot or in rotating e qui pment commissi oni ng test switch and mechanical part of the
10、ir trial ca nnot continuously, t his is considered two test proje cts shall be carried out a ccor ding to t he above four ste ps. 2.4, and att ached w ork votes issue d people, a nd li ce nse people, and work head li st: party ele ctrical first specie s, and se cond speci es work v otes lice nse peo
11、ple list: party engine work vote s lice nse people list: b electri cal first spe cies, and secondspe cies work v otes issued people: b hot control pr ofessional issue d pe ople li st: b hot control professi onal w ork hea d: b steam machi ne professional work vote s issued people: b steam machi ne p
12、r ofessional w ork votes hea d: b boiler pr ofessional work v otes issued people: b boiler pr ofessional w ork votes head: attache d: a bout personnel of conta ct phone party b Divisi on 3, boiler auxil iary equipment debugging sce narios 3.1, send, induced draft fan try turned 3.1.1, try turni ng t
13、he former re quireme nts of: 3.1.1.1, fan body and motor installed, base d the second Grouti ng ends, a nd the concrete strength is up. 3.1.1.2, coupling the Centre has finished al igning standards, a ppr oved visa. 3.1.1.3, bearing clearance normal outer rims a nd bearing clearance is up to standar
14、 d. 3.1.1.4, Be nto n . Condition. 5.1.3, ov en starts all ra nge of com prehe nsive system s have be en i nstalled, grate, delivery, fan and slag machine to try to tra nsfer a qualifie d accepta nce a nd vi sas. 5.1.4, boil er pressure parts, body pi pe all i nstalled, water pressure test and accep
15、ta nce of visa. 5.1.5, thermal, electri cal and instrument i nstallation, si ngle school qualified to simulate joint school qualified, rea dy to operate. 5.1.6, fur nace wa ll masonry and pipe insulation, corrosi on protecti on all over, a nd a cce ptance. Boil er air and flue gas ducts clean, clutt
16、er -free, external ove n site ha s been cl eane d up. 5.1.7, ESP i nstallation completion and accepta nce of visa, water-film dust collect or com pletes the installati on of a pprove选修 3 易考学问点背诵专题 1基因工程基因工程的概念基因工程是指依据人们的愿望,进行严格的设计,通过体外 DNA重组和转基因技术, 给予生物以 新的遗传特性 ,制造出 更符合人们需要的新的生物类型和生物产品.基因工程是在 DNA分子水
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 2022年高中生物选修知识点总结 2022 年高 生物 选修 知识点 总结
限制150内