商务与经济统计习题答案(第8版中文版)SBE8-SM06.doc
《商务与经济统计习题答案(第8版中文版)SBE8-SM06.doc》由会员分享,可在线阅读,更多相关《商务与经济统计习题答案(第8版中文版)SBE8-SM06.doc(18页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、Continuous Probability DistributionsChapter 6Continuous Probability DistributionsLearning Objectives1.Understand the difference between how probabilities are computed for discrete and continuous random variables.2.Know how to compute probability values for a continuous uniform probability distributi
2、on and be able to compute the expected value and variance for such a distribution.3.Be able to compute probabilities using a normal probability distribution. Understand the role of the standard normal distribution in this process.4.Be able to compute probabilities using an exponential probability di
3、stribution.5.Understand the relationship between the Poisson and exponential probability distributions.Solutions:1.a.b.P(x = 1.25) = 0. The probability of any single point is zero since the area under the curve above any single point is zero.c.P(1.0 x 1.25) = 2(.25) = .50d.P(1.20 x 1.5) = 2(.30) = .
4、602.a.b.P(x 135)= (1/20) (140 - 135) = 0.25 d.minutes4.a.b.P(.25 x .60) = 1 (.40) = .405.a.Length of Interval = 261.2 - 238.9 = 22.3b.Note: 1 / 22.3 = 0.045P(x 250) = (0.045)(250 - 238.9) = 0.4995 Almost half drive the ball less than 250 yards.c.P(x 255) = (0.045)(261.2 - 255) = 0.279d.P(245 x 260)
5、= (0.045)(260 - 245) = 0.675e.P(x 250) = 1 - P(x 250) = 1 - 0.4995 = 0.5005The probability of anyone driving it 250 yards or more is 0.5005. With 60 players, the expected number driving it 250 yards or more is (60)(0.5005) = 30.03. Rounding, I would expect 30 of these women to drive the ball 250 yar
6、ds or more. 6.a.P(12 x 12.05) = .05(8) = .40b.P(x 12.02) = .08(8) = .64c.Therefore, the probability is .04 + .64 = .687.a.P(10,000 x 12,000) = 2000 (1 / 5000) = .40The probability your competitor will bid lower than you, and you get the bid, is .40.b.P(10,000 x 14,000) = 4000 (1 / 5000) = .80c.A bid
7、 of $15,000 gives a probability of 1 of getting the property.d.Yes, the bid that maximizes expected profit is $13,000.The probability of getting the property with a bid of $13,000 isP(10,000 x 72) = 1 - 0.8413 = 0.1587b.At x = 60P(x 60) = 0.5000 + 0.4986 = 0.9986 P(x 72) = 1 - 0.1587 = 0.841318.a.Fi
8、nd P(x 60)At x = 60P(x 60) = 0.5000 + 0.2549 = 0.7549 P(x 60) = 1 - P(x 5.0) = P(z 1.88) = 1 - P(z 1.88) = 1 - .9699 = .0301The rainfall exceeds 5 inches in 3.01% of the Aprils.b.P(x 3.0) = P(z .63) = 1 - P(z 40) = P(z 1.63) = 1 - P(z 1.63) = 1 - .9484 = .05165.16% of subscribers spend over 40 hours
9、 per week using the computer.c.A z-value of .84 cuts off an area of .20 in the upper tail. x = 27 + .84(8) = 33.72A subscriber who uses the computer 33.72 hours or more would be classified as a heavy user.21.From the normal probability tables, a z-value of 2.05 cuts off an area of approximately .02
10、in the upper tail of the distribution.x = m + zs = 100 + 2.05(15) = 130.75A score of 131 or better should qualify a person for membership in Mensa.22. Use m = 441.84 and s = 90a.At 400At 500P(0 z .65) = .2422 P(-.46 z 100)At x = 100P(x 100) = P(z .5) = 0.6915b.Find P(x 90)At x = 90P(x 90) = .5000 -
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 商务 经济 统计 习题 答案 中文版 SBE8 SM06
限制150内