1、.1.1.-Task/ObjectiveTask/Objective 目的目的To define and establish basic requirements and a process to prepare,e*ecute and follow-up Failure Mode and EffectsAnalyses.为了规定建立基本的要求和程序以便于对失效模式及后果分析的准备、执行和跟踪。2.2.Scope of ApplicationScope of Application 围围-Avim solar production Co.,Ltd,Gaomi/China埃孚光伏制造高密/中国3
2、.3.DefinitionsDefinitions 术语和定义术语和定义FMEA失效模式及后果分析Product FMEA产品的失效模式及后果分析Process FMEA过程的失效模式及后果分析SODRPNBOMMODPDP4.4.ResponsibilitiesResponsibilities 职责职责-FMEA OrganizationFMEA 的组织.The Failure Mode and Effects Analysis(FMEA)is an analytical method of preventive qualityassurance.It helps to identify a
3、nd evaluate risks in time,and to initiate or propose suitableactions for risk minimization.The FMEA consists of 5 steps:Structural analysis,functionalanalysis,failure analysis,risk assessment and optimization.失效模式及后果分析是预防性品质保障的一种分析方法,它可以帮助及时识别并评估风险,并启动或提议适当的行动把风险降低最低限度。失效模式及后果分析有五个步骤,即结构分析,功能分析,失效分析
4、,风险评估及优化。The Product FMEA analyses the design of products,product parts and their interfaces with regardto their quality over the whole product life cycle.产品的FMEA是从产品寿命周期的角度来分析产品、产品部件、以及部件接合处的设计。The Process FMEA analyses all planned and e*isting steps of process planning and processe*ecution(manufac
5、turing and assembling processes)until delivery to the customer.过程FMEA对所有计划的和现行的过程设计和过程执行(生产和组装过程)步骤进行分析,直至发货给客户。Severity(of failure consequence)(失效后果的)严重度Occurrence probability(of failure cause)(失效原因的)频度Detection probability(of failure)(失效的)探测度Risk Priority Number风险顺序数Bill of material原材料清单Moderator主
6、持人Product development process产品开发程序资料.-FMEA Coordinator FMEA协调人 The FMEA coordinator is responsible for the FMEA procedure,FMEA training materials and general support.The QMSdepartment is responsible for the coordination within Avim.由FMEA协调人负责FMEA程序,FMEA培训材料及总体支持。品保部负责埃孚部的协调。-FMEA Moderator(MOD)FMEA
7、 主持人 The MOD ensures pliance with FMEA rules and applicable FMEA procedures.He/she is the local contactperson for all questions in connection with the FMEA method and its implementation.由FMEA主持人确保遵行FMEA规则及适用的FMEA程序。他或她是本地关于FMEA方法及执行的一切问题的联系人。-Tasks of the MOD:FMEA 主持人的任务 Ensure a proper and plete pr
8、eparation.确保准备恰当而全面 municate basic knowledge about the method in case that team members do not possess it.在团队成员不了解方法时,和团队成员沟通关于方法的基本知识。Moderate FMEA meetings.主持FMEA会议。Cancel FMEA meetings in case the premise are not given。在前提条件不具备情况下取消FMEA会议。Create and distribute FMEA reports.创建并发布FMEA报告。The service
9、 of e*ternal FMEA moderators has to be approved project-specifically by QMS外部FMEA主持人服务具体由品保部批准。-FMEA Team FMEA团队 For efficient e*ecution,interdisciplinary FMEA teams are formed,prising normally of 4 to 8 participants.Furthere*perts are called in as needed.It is helpful that the same team members sta
10、y through the entire project.跨学科FMEA团队一般由4到8名成员组成,目的是为了有效的执行。如有需要,还可以另外请专家帮助,在整个项目期间,团队成员一直不变有益于项目的开展。Each team member brings into the project,from their functional area,the required specialist knowledge and allavailable information.Team members settle the problems occurring in their own speciality
11、area,and consult withadditional e*perts if necessary.Through their know-how and e*perience risks can be recognized and appropriatemeasures can be taken.每一位团队成员根据各自的职能围为项目提供所需专业知识和其他可能的信息。成员解决项目出现的各自专业知识围的问题,如有需要可咨询另外的专家。可借助于他们的专业技能和经验识别风险并采取妥当措施。The participation in an FMEA meeting presupposes knowl
12、edge of the method.参加FMEA的前提是了解其方法-Core FMEA Team:核心的失效模式及后果分析团队 MOD Moderator失效模式及后果分析主持人 QMS品保部 ENG技术部 MFG生产部 TEF(optional)设备部(可选)PUR(optional)采购部(可选)E*ternal e*perts can plement the FMEA team.The ENG manager decides about their participation.外来专家可以补充FMEA团队,由技术部经理决定他们的参与5.5.DescriptionDescription
13、描述描述5.15.1GeneralGeneral总论总论-FMEA has to be created or updated whenever one of the followingpoints applies:当以下几种情况之下出现时,必须创建或更新FMEA:.z.-New development of product or process新的产品或过程开发 Changes in product or process产品或过程有变化时 Changed application conditions for a product产品的应用现状有变化时 Requirements changed b
14、y law or customer法律规定或顾客对产品的要求发生变化-The Product FMEA is done at the engineering site and the Process FMEA is done at the manufacturinglocation.产品的FMEA是在工程现场进行,过程FMEA在生产制造场所进行。5.25.2Integration of FMEA FMEAIntegration of FMEA FMEA的整合的整合5.2.1Integration of FMEA in the PDP5.2.1Integration of FMEA in the
15、 PDP(产品开发过程)将(产品开发过程)将FMEAFMEA的整合到产品开发过程中的整合到产品开发过程中-For new product development projects the PDP defines when FMEA needs to be performed.对于新产品开发项目,由PDP决定何时启用FMEA。-ENG is responsible for product and process FMEA.由技术部负责产品和过程FMEA5.2.2Updating of FMEA5.2.2Updating of FMEA失效模式及后果分析的更新失效模式及后果分析的更新-An alr
16、eadycreatedFMEA has to be updated,e.g.due to changesin engineeringdesign,manufacturingprocess,technical modifications,new applications for the product or any other changed boundary condition.如出现工程设计和生产过程改变,技术性修改,产品新的应用,或其他边界条件的改变,已经创建的决定失效模式及后果分析必须更新。-It is the decision of the ENG manager to call fo
17、r an additional FMEA meeting.由技术部经理决定另外召开失效模式及后果分析会议5.35.3Input for FMEAFMEAInput for FMEAFMEA的输入的输入Input for Product FMEAInput for Product FMEA 产品的产品的FMEAFMEA的输入的输入-The latest time to e*ecute the initial version of the Product FMEA is after pletion of the preliminary engineering design.最初版本的产品FMEA最
18、晚要在其初步工程设计完成时开始执行。-Required:要求:Preliminary engineering design(assembly drawing including position numbers)and preliminary BOMFunctional analysis初步工程设计(附带位置序号的安装图纸)和初步的 BOM功能分析。Product Concept/preliminary Project Management Plan.产品概念或初步的项目管理计划。List of failures in the field of the predecessor product在
19、之前产品一栏列出故障清单。Report concerning conformity with standards.This report has latest to be e*istent to the update of the Product FMEAbefore start of Process FMEA.关于标准符合性的报告。在启动过程FMEA之前,这个最新的报告与产品FMEA的一起更新。-Remended:推荐 E*ploded view部件分解图 Overview subassemblies and possible assembly procedure部件概况以及可能的装配程序。
20、Preliminary Test Plan or Test Plan from predecessor product初步测试计划或前一期产品的测试计划 Functional prototype/already e*isting single parts功能样板或现成的零件。Similar product(s)including list of errors/weak points类似产品(附带缺陷或瑕疵的清单).z.-5.3.2Input for Process FMEA2Input for Process FMEA过程过程FMEAFMEA的输入的输入-Required:要求:Prelimi
21、nary production layout and manufacturing plan初步的设计布局和生产计划。Assembly drawing including position numbers,individual part drawings(if available)and BOM标注位置序号的安装图纸,单个的零件的图纸(如果可以)和物料清单。(Demounted)prototype(卸除的)样品 Drawing of part/ponent(inhouse manufactured part/ponent)零件或元件(自己生产的零件或元件)的图纸 List of failures
22、/problems in manufacturing of the predecessor product制造前期产品失效或问题的清单 Control Plan of predecessor product(if e*istent)前期产品的控制计划(如果存在)Updated Product FMEA更新的产品FMEA5.45.4E*ecution of an FMEAE*ecution of an FMEA一个一个FMEAFMEA的执行的执行-Step-1:Structural analysis第一步:结构分析 Listing and structuring of all elements
23、involved.Creating a tree structure.列出并组织所有相关元素,建立一个树状结构。-Step-2:Functional analysis 第二步:功能分析 Listing of allfunctions and characteristics of the elements.The total life cycle of the product has to beanalyzed.列出这些元素所有的功能和特性。分析产品整个生命周期。Functions include internal and e*ternal requirements and e*pectatio
24、ns.They must be described with a nounand a verb.功能包含部和外部共同的要求和期望。用一个名词和一个动词来描述这些功能。Characteristics are requirements that are specified with measurable variables as much as possible.特性是由尽可能多的可测量变量规定的要求。The more accurate the description of the functions and characteristics is,the more accurately the p