煤矿安全资料.pdf
《煤矿安全资料.pdf》由会员分享,可在线阅读,更多相关《煤矿安全资料.pdf(57页珍藏版)》请在淘文阁 - 分享文档赚钱的网站上搜索。
1、OIML TC 8/SC 7 1WD OIML R 137-1&-2 Date:28 April 2009 K:AlgemeenOIMLOIML gasdraft R137-1-2-31WD R137-1+2 09-04-28.doc Page 1 of 57 COMMITTEE DRAFT OIML WD1 Date:28 April 2009 Reference number:.Supersedes document:N/A OIML TC X/SC X Circulated to P-and O-members and liaison international bodies and e
2、xternal organisations for:Title:Gas meters discussion at(date and place of meeting):.Secretariat:The Netherlands comments by:.vote(P-members only)and comments by:.TITLE OF THE CD(English):OIML R 137-1 and-2 Gas meters Part 1:Metrological and Technical Requirements Part 2:Metrological controls and pe
3、rformance tests TITRLE DU CD(French):OIML R 137-1 et-2 Compteurs de gaz Partie 1:Exigences mtrologiques et techniques,Partie 2:Contrles mtrologiques et essais de performance Original version in:English OIML R 137-1:2006(E)K:AlgemeenOIMLOIML gasdraft R137-1-2-31WD R137-1+2 09-04-28.doc Page 2 of 57 E
4、xplanatory note to the 1 WD(Temporary section to be removed after finalization of the Recommendation)After OIML R 137-1 Gas meters was approved by CIML in 2006 and effectively published in 2007,and the responsibility for this Recommendation was transferred to TC8/SC7,the secretary started the work d
5、rafting Part 2 Metrological controls and performance tests.But during this work,it was identified that a few minor changes in Part 1 would be necessary,although there is no formal project for the revision of Part 1.Nevertheless,expecting that the current project for part 2 will also lead to a revise
6、d Part 1,the secretary investigated what further changes would be advisable.This lead to the following proposed changes in Part 1(2006):Definitions changed in compliance with the new(2007)edition of the VIM.Not used definitions removed Separation in Parts 1 and 2 in better accordance with the genera
7、l format for OIML Recommendations,presented during the OIML seminar in Douai(April 2008).In part 1 only the requirements are listed,due to the fact this part will be used for legislation and therefore paragraph 4.6 is introduced.Also the previous chapters 3 up to and including 6 are reshuffled to ma
8、ke the document in line with the general OIML format.Added requirements for the mains voltage to clause 4.1,rated operating conditions The reproducibility requirement is now only prescribed for gas meters with internal moving parts,while a repeatability requirement is introduced for gas meters witho
9、ut internal moving parts(4.6.1 and 4.6.2)The temperature test is now prescribed from Qmin up to and including Qmax,instead from Qt up to and including Qmax(paragraph 11.4.8).The temperature test with gas temperature unequal to ambient temperature is removed.The damp heat,steady state and damp heat c
10、yclic test are performed at the upper temperature(Table 4).The test Orientation and flow direction is better separated into Orientation and flow direction(4.6.3 and 4.6.4).The requirements for the durability test is now from Qmin up to and including Qmax,instead from Qt up to and including Qmax(11.4
11、.10 and 4.6.8).For flow disturbances the requirement is that the shift has to be 0.9Qmax a weighting factor of 0.4 shall be used instead of 1.2.2.6 Intrinsic error(OIML D 11,3.7)Error determined under reference conditions.2.2.7 Fault e(OIML D 11,3.9)Difference between the error of indication and the
12、 intrinsic error of a measuring system or of its constituent elements.Note:In practice this is the difference between the error of the meter observed during or after a test,and the error of the meter prior to this test,performed under reference conditions.2.2.8 Maximum permissible error(MPE)(VIM 4.2
13、6)extreme value of measurement error,with respect to a known reference quantity value,permitted by specifications or regulations for a given measurement,measuring instrument,or measuring system.2.2.9 Accuracy class(VIM 4.25)class of measuring instruments or measuring systems that meet stated metrolo
14、gical requirements that are intended to keep measurement errors or instrumental uncertainties within specified limits under specified operating conditions.2.2.10 Durability(OIML D 11,3.17)Ability of a measuring instrument to maintain its performance characteristics over a period of use.2.2.11 Operat
15、ing conditions Conditions of the gas(temperature,pressure and gas composition)at which the quantity of gas is measured.2.2.12 Rated operating conditions Conditions of use giving the range of values of the measurand and the influence quantities,for which the errors of the gas meter are required to be
16、 within the limits of the maximum permissible error.2.2.13 Reference conditions OIML TC 8/SC 7 1WD OIML R 137-1&-2 Date:28 April 2009 K:AlgemeenOIMLOIML gasdraft R137-1-2-31WD R137-1+2 09-04-28.doc Page 10 of 57 Set of reference values,or reference ranges of influence quantities,prescribed for testi
17、ng the performance of a gas meter,or for the intercomparison of the results of measurements.2.2.14 Base conditions Conditions to which the measured volume of gas is converted(examples:base temperature and base pressure).Note:Operating and base conditions relate to the volume of gas to be measured or
18、 indicated only and should not be confused with“rated operating conditions”and“reference conditions”(VIM 5.05 and 5.07)which refer to influence quantities.2.2.15 Test element(of an indicating device)Device to enable precise reading of the measured gas quantity.2.2.16 Resolution(of an indicating devi
19、ce)(VIM 4.15)Smallest difference between displayed indications that can be meaningfully distinguished.Note:For a digital device,this is the change in the indication when the least significant digit changes by one step.For an analogue device,this is half the difference between subsequent scale marks.
20、2.2.17 Drift(VIM 4.21)continuous or incremental change over time in indication,due to changes in metrological properties of a measuring instrument.2.3 OPERATING CONDITIONS Note:For the definition of operating conditions,see 2.2.11.2.3.1 Flowrate,Q Quotient of the actual quantity of gas passing throu
21、gh the gas meter and the time taken for this quantity to pass through the gas meter.2.3.2 Maximum flowrate,Qmax Highest flowrate at which a gas meter is required to operate within the limits of its maximum permissible error,whilst operated within its rated operating conditions.2.3.3 Minimum flowrate
22、,Qmin Lowest flowrate at which a gas meter is required to operate within the limits of its maximum permissible error,whilst operated within its rated operating conditions.2.3.4 Transitional flowrate,Qt Flowrate which occurs between the maximum flowrate Qmax and the minimum flowrate Qmin that divides
23、 the flowrate range into two zones,the upper zone and the lower zone,each characterized by its own maximum permissible error.2.3.5 Working temperature,tw Temperature of the gas to be measured at the gas meter.2.3.6 Minimum and maximum working temperatures,tmin and tmax Minimum and maximum gas temper
24、ature that a gas meter can withstand,within its rated operating conditions,without deterioration of its metrological performance.2.3.7 Working pressure,pw Gauge pressure of the gas to be measured at the gas meter.The gauge pressure is the difference between the absolute pressure of the gas and the a
25、tmospheric pressure.2.3.8 Minimum and maximum working pressure,pmin and pmax Minimum and maximum internal gauge pressure that a gas meter can withstand,within its rated operating conditions,without deterioration of its metrological performance.OIML TC 8/SC 7 1WD OIML R 137-1&-2 Date:28 April 2009 K:
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 煤矿安全 资料
限制150内