1、编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第14页 共14页活动Activity活动描述Description继续对项目进行管理和监控Continue Monitoring and Control of Project ExecutionLPDT-100FPDT-58RDPDT-68TSPDT-58MNFPDT-58PROPDT-58MKTPDT-69A对项目的执行进行持续的每周例行监视和控制。Continue weekly monitoring and control of project execution.继续监控产品质量目标和计划Continue to Moni
2、tor and control product quality plan/PQA-100在验证阶段,继续监控产品质量目标和计划。In qualify phase, continue to Monitor and control product quality objective and plan.监控并管理配置及更改Monitor and Manage Configuration and ChangesSE-240 作为持续进行的活动的一部分,对开发和设计活动进行定期性的检查,确保产品需求、规格、配置和其它的产品技术文档没有被随意更改;使用PDM的EC模块来使产品需求、规格、配置和其它技术文档
3、的更改受控(在PDM实施前,使用CMM和公司其它的相关流程)。As part of an ongoing activity, perform inspections regularly on design and development activities to make sure that the offering requirements, specifications, configuration(s) and other offering technical documents are not changed in an ad-hoc manner; maintain control
4、 over changes to offering requirements, specifications, configuration(s) and other offering technical documents using EC module of PDM (Prior to the implementation of PDM, use CMM and other relevant processes of Huawei)设计检视Perform Design InspectionsSE-250 作为持续进行的活动的一部分,通过参加由硬件、软件、结构、测试、工业设计、采购、市场和其他
5、项目组成员召开的技术会议或阅读会议纪要来进行设计检查;特别的,查实产品是否符合特定的需求和规格,并对所有偏差或更改进行标注;这项活动为“监控和管理配置及更改”活动提供输入。 As part of an ongoing activity, perform design inspections by participating in or reading meeting minutes of regular project technical meetings conducted by electrical, software, mechanical, testing, industrial de
6、sign, procurement, marketing, and other project members; specifically look for offering compliance with specified requirements and specifications, and flag any deviations or changes; this activity feeds the monitor and mange changes activity. 更新BOM并发布最新版给本给制造Update BOM and release latest version to
7、MFGSE-235PDM activity. The latest level of a products contents should be made available to manufacturing at every key point in the IPD Process. Additionally,within Windchill, the PDM system, a baseline is used to create a snapshot of a products status so that users sharing product data can do so wit
8、hin the context of a known product configuration.PDM活动. 在IPD流程的各个关键点,产品构造的最新情况应提供给制造。另外在Windchill PDM系统这边,基线就用来创建产品状态的“快照”,这样共享产品数据的用户可以共享同一既定的产品配置。 SVT(系统验证测试) TE-70对初始产品单元进行性能、可靠性、环境测试。Test initial production units for performance, reliability, environmental, etc. considerations和内部认证/标杆测试Internal
9、SCT/Bench TestTE-71它国准入、进行测试内部认证/标杆、法规等方面Test initial production units for homologation, certification, regulatory,翻译Translation TD-45基于翻译计划和开发的技术(及其他)文件,在需要的地方利用第三方完成翻译工作,第三方要签订保密协议。Technical ( and other ) documents based on translation plan and development, a confidential agreement should be signe
10、d when translation is shifted to a third party. 翻译验证Translation VerificationTD-46加载翻译的文件,运行系统来验证翻译是否正确,记录偏差、疑点和问题并加以解决。Load translated documents, operate the system to verify whether the translation is correct, log variance, doubts , issues and have them solved. 技术资料出版、发运、储存Print, Ship, and Stock Do
11、cumentationTD-45 (TD-50)当技术文档和其他文档经过评审和验证后,印刷纸件文档(技术手册、安装手册、用户手册等)及其翻译版本,运送到销售渠道并纳入存货目录。When the technical and other documentation have been reviewed and verified, print the paper-based documentation (technical manuals, installation manuals, user manuals, etc.) and their translated versions; ship to
12、 channels and stock in inventory继续制造系统验证Continue Manufacturing System VerificationPP-30 通过对制造系统的验证工作进行有效的指导和控制,以保证验证效果,提高验证效率,按时完成验证计划。Guarantee verification effects, improve verification efficiency and timely complete qualify plan through effective guide and control of manufacturing system verifica
13、tion. 组织实施产品在试产验证过程中制造系统验证数据的分析处理和产品一致性测试,完成对产品在制造工艺系统方面和产品一致性方面的评估,以及各种问题的及时分析总结、反馈和处理,并跟踪至彻底解决。 Organize and implement manufacturing system verification data analysis and consistency testing during pilot production and verification. Complete assessment on manufacturing process system and product c
14、onsistency. Timely summary, feedback and handling of various problems and track until final solution. 下达生产物料计划Issue Production Material PlanAME-70在技术评审5后,物料计划工程师根据市场代表滚动刷新的并经市场相关部门评审通过的要货计划, 按照相关计划操作流程录入预测、排产计划、下达物料采购计划(包括PCB、结构件、外购设备、软件)、制定物料半成品加工计划。以后每两周根据调整的市场要货计划滚动刷新生产物料计划。到发布阶段后期及时检查生产物料的齐套性,启动
15、生产。After TR5, material plan engineer follow appropriate plan operation process to enter forecast, manufacturing sequence, notify material procurement plan ( including PCB, structured components, outsourced equipment and software) and develop material semifinished product processing plan based on ref
16、reshed product demand plan provided by marketing rep and reviewed by appropriate marketing functions. Manufacturing material plan is updated every two weeks based on refreshed market demanding plan. Timely check completeness of manufacturing materials at the end of launch phase and initiate producti
17、on. 采购长货期生产物料Order Long Lead Time Production PartsPRO-50通过MRP系统下单-这不在IPD范围Place orders using the MRP systems - this not part of IPD采购生产物料Order Production PartsPRO-55通过MRP系统下单-这不在IPD范围Place orders using the MRP systems - this not part of IPD执行订单履行活动Perform Fulfillment ActivitiesFF-40按订单履行计划执行活动(如何产生定
18、单,通过何种渠道,他们将如何被接受、处理、安排调度、制造、交付和在客户现场安装)。Perform fulfillment activities based on fulfillment plan - how orders will be generated, through which channels, how orders will be communicated, accepted, processed, scheduled, built, delivered and installed at customer sites建立订单环境Setup Ordering EnvironmentF
19、F-50加载产品构件、标准配置和配置规则到配置器中,在MRP中建立用户定单系统的界面。Load the offering components, standard configurations and configuration rules into the configurator; set up interfaces to the customer ordering system in MRP接受培训,准备销售力量Perform Training and Prepare Sales ForceS-30培训销售队伍并用市场的辅助品(如小册子等)、工具(如配置器等)武装他们以便让他们在发布日能
20、够开始销售。Train the sales force and equip them with the marketing collateral (brochures, etc.), tools such as configurator, etc. so they can start selling on the day of announcement. 执行客户迁移活动Perform Customer Transition ActivitiesCT-30根据详细的工作计划执行用户迁移活动;准备可根据不同用户进行修改、调整的标准迁移计划;准备可根据需要进行修改、调整的标准用户协议,培训技术人员
21、,指定人员来全面审视用户的具体情况。Perform customer transition activities per the detailed work plans; prepare standard transition plans that can be modified to suit different customer situations; prepare standard customer agreements that can be modified if necessary; train technical staff; assign staff to oversee s
22、pecific customer situations;继续准备发布/局部公开/培训Continue to Prepare for Announcement / Disclosure / TrainingMKTE-30继续发布准备;继续收集信息来完成RFA文档;(RFA是为了向PDT和IPMT施加压力来发布产品,PDT和IPMT在可获得性决策评审点进行检查和平衡);继续准备对销售员工的培训计划,包括师资培训计划(T3),明确候选客户并准备秘密发布(这些客户可能是早期支持的候选客户);准备局部发布的材料、信函、保密协议等;获得准入证,准备媒体发布,完成培训资料的准备,准备好正式的发布申请。Con
23、tinue preparations for announcement; continue collecting information towards completing the RFA document; (the RFA is intended to put pressure on the PDT and IPMT to announce the offering, while the PDT and IPMT provide the check and balance via the Availability DCP). continue preparing training pro
24、grams for sales staff including train-the-trainer programs (T3), identify customer candidates and prepare for confidential disclosures (these customers may be candidates for early support programs); prepare disclosure materials, letters, confidentiality agreements, etc.; also get clearances from age